Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
511507Bid Award Id
ViewTender No
187/2/UF/HMDA/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Lawns From December-2023 to March-2024(Months)
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 300x5x15/25000=0.90 Daysx4 Months=3.60
3.6
3352
12068.28
Item;Maintenance of Individual plants and shrubs trimming once in 15 days and watering once in a day @ 5 ltrs per plant with manual watering
300
444
5329.68
Item;Maintenance From December-2023 to March-2024(4Months)
-
-
-
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(8"x12")Bags Total lead 25Km =22km x10.58=232.76+542.19
150
774
1162.42
Item;Cost of Shub Plants
150
50
7500
Item;Shrub planting: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
300
194
58221
Item;Engaging of JCB for Clening and leveling of sites including the fuel charges and driver batta etc complete 3days X 8 Hours = 24 Hours
20
850
17000
Item;Individual Shrub Plantation
-
-
-
Item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 1800x5x28/25000=10.08 Daysx4Months=40.32
40.32
3352
135164.74
Item;Maintenance of hedge planting trimming once in 15 days watering once in a day @ 5ltrs per plant with manual watering
1800
2930
211016.88
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(6"x12")Bags Total lead 25Km =22km x3.02=66.44+338.83
18000
405
72948.6
Item;Cost of Hedge Plants
18000
35
630000
Item;Hedge planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material
1800
756
1361682
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete =2000 Sqmt X 0.45x2 = 1800 Cum
1800
174
314640
Item;Hedge Plantation
-
-
-
Item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.From December-2023 to March-2024 (4 months)
300
360
4331.28
Item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering (16 Waterings) From December-2023 to March-2024 =300x20x16/25000=3.84
3.84
3352
12872.83
Item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
300
482
1448.45
Item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
300
160
482.83
Item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
30
2261
678.3
Item;Application of fertilizers (2 doses)
300
293
881.79
Item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)
300
-
300
Item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
300
28
8400
Item;Planting of bag plants after refilling the pits/support sticks10"x16" bags
300
2139
6417.6
Item;Internal transport of bag plants to planting site 10X16 bags
300
608
1825.32
Item;10"x16"Bags(10.58x22+735.93)
150
968
1453.04
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 53Km
-
-
-
Item;Cost of Avnue Plants
150
250
37500
Item;Application of Folidol dust (10%) @20gms/pit/dose
300
57
171.32
Item;Application of Red soil and FYM including internal distribution 75cmt cube pit
300
1233
3701.63
Item;Cost of Folidol dust (10%) @20grms/pit
300
-
150
Item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
300
2558
7676.19
Item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60X0.60X0.60=0.216x300=64.80 cum x 20%=12.96 cum
12.96
1228
15921.36
Item;Digging of pits of size0.60x0.60x0.60 mts
300
6761
20283.65
Item;Alignment and Stacking including cost of stacks(45%)
135
97
131.07
Item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)
600
65
394.55
Item;Avenue Plantation
-
-
-
Item;Supply and fixing of Granite stone benches of minimum length of 5 feet with flammed finish of approved design and colour including the cost of earth work excavation laying of PCC 1:2:4 in required dimensions fixing chagre labour charges making charges incidental and operation charges contractor profit etc complete for finished item of work and as directed by the engineer
20
11000
220000
Item;Signboards
-
-
100000
Item;Cost of sculptures (3 Nos)
1
-
350000
Item;Internal Transportation spereading of gravel
680
71
48919.2
Item;Lawn Mounds, Gravel filling
680
204
138856
Item;Laying of shabad stone flooring with ran door white 50.80 mm thickness over a base of mud motor of 30mm thickness and pointing of full depth stores with red soil and carpet grass including cost and conveyance of all material and labour chagres 2 feetx2 feet x 170 Rmt= 680
680
4299
292355.8
Item;Laying of carpet grass and ramming
2500
58
145250
Item;Cost of carpet grass
2500
135
337500
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass ( 4? thickness after rolling )
2500
333
834375
Item;Construction of cement concrete kerb with channel with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M10 grade foundation 150 mm thick, kerb channel 300 mm wide 50 mm thicj ibn PCCM20 grade, sloped towards the kerb, kerb stone with channel laid with kerb laying machine, foundation concrete laid using concrete batching and mixing plant including contracotrs profit and overhead charges but excluding seinorage charges all complete as per clause 408 MORTH, complete for finished item of work and as directed by the Engineer-in-charge (Morth 408 8.2 B)
1270
575
731113.6
Item;Internal Transportation & application of gravel including spreading
1270
99
126288.8
Item;Supply & stacking of gravel at site to the department guage for permeasurements and it shall be composed for wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleteriious matter the cost including of transportation, loading, unloading charges taxes & seiniorage charges etc complete = 635 Sqm x2 M Height =1270 Cum
1270
204
259334
Item;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 kms
1000
137
137000
Item;ESTIMATE FOR DEVELOPEMNT OF LANDSCAPING WORK AT SHAMBUNIKUNTA LAKE, AMEENPUR DURING THE YEAR 2023-24
-
-
-