Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Housekeeping Services
Opening Date4 Apr 2022
Closing Date11 Apr 2022
Tender Amount₹ 3,90,97,640 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Patancheru Interchange: i.ORR Patancheru Interchange Trainagle bit=315Sqmts ii.Down Ramp of Patancheru Interchange =119Sqmt iii.Patancheru Interchange under bridge of VUPs=195 iv.ORR Exit No.-3 Towards Patancheru=90Sqmts v.Central Median from Muthangi to Patancheru Road=770Sqmts Total(ii)=315+119+195+90+770=1489Sqmts Dundigal Interchange: i. (Bit-I Towards Medchal road to Patancheru road 43km )-(Bit-II Towards Dundigal to Medchal road Ramp)=31Sqmts ii.(Towards Dundigal to Medak Road Triangle BIT)=975Sqmts iii.(Towards Patancheru road to Medchal Road Down Ramp)=45 Sqmts iv. ( Towards Dundigal to Patancheru VUP1,VUP 2 and VUP 3 Central median =590Sqmts Total=31+975+45+590=1641Sqmts Sulthapur interchange i. Sulthanpur Interchange(VUP1 & VUP2) =630Sqmts Total=2795.98+1489+1641+630 =6555Sqmts

-

-

-

... More
Item;Maintenance of hedge: i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., Old Development: Patancheru TAB=261.27Sqmts Dundigal TAB = 100 sqmts Gandimaisamma Rotary=1345.50sqmts Narsapur Rotary=959.41 Total(i)=2795.98 sqmts

6555

-

2305359.41

... More
Item;Patancheru Interchange: i.ORR Patancheru Interchange Trainagle bit=770Sqmts ii.Down Ramp of Patancheru Interchange =650Sqmt iii.ORR Exit No.-3 Towards Patancheru=230Sqmts Total-II -770+650+230=1650Sqmts Dundigal interchange: i. (Bit-I Towards Medchal road to Patancheru road 43km )-(Bit-II Towards Dundigal to Medchal road Ramp)=315Sqmts ii.(Towards Dundigal to Medak Road Triangle BIT)=235Sqmts iii.(Towards Patancheru road to Medchal Road Down Ramp)=109Sqmts iv. ( Towards Dundigal to Patancheru VUP1,VUP 2 and VUP 3 Central median =140Sqmts Total-III=315+235+109+140=799Sqmts G.total=2727.14+1650+799=5176.14

-

-

-

... More
Item;Maintenance of lawns: (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers with Manual watering Old Development : Patancheru TAB=167.77 Sqmts Dundigal TAB = 125 sqmts Gandimaisamma Rotary=511.27sqmts Narsapur Rotary=513.10 Total-I=1677.77+125+511.27+513.10 =2827.14Sqmts

5176.14

-

573998.73

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.

6120

-

159041.66

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

6120

-

29547.97

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

6120

-

9849.53

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (September)

6120

-

29547.97

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

6120

-

9849.53

... More
Item;1st Maintenance of INTERCHANGE Plantation on ORR (2021planting) Dunigal interchange=5300Nos Sulthapur interchange=820 total =6120 Nos

-

-

-

... More
Item;III. Interchanges, Rotaries, TAB Buildings

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. From April-2022 to March-2023 = 12 months Rate =721.88X30%=216.56

147154

-

3824120.43

... More
Item;Protection 1styear+2nd year =135054+12100=147154

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

12100

-

58421.22

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

12100

-

19473.74

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

12100

-

58421.22

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

12100

-

19473.74

... More
Item;Trimming of shrubs once in 30 days FromApril-2022 to March-2023 =12 months

5400

-

29769.12

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (32 waterings) 12100*32*15/25000=232.32Days avenue plants 5400*5*64/25000 =59.12days for shrubs Total= 232.32+59.12

291.44

-

976994.31

... More
Item;2nd year Maintenance of Avenue Plantaion on ORR (2020planting) 22km-39.5 -SR =10300, (Translocaion plants)-1900 Nos 39.5-43-SR=1800nos, Shrubs-3500nos Total - SR - 12100No's ,Shrubs=5400No's

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

135054

-

652067.72

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

135054

-

217355.91

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

135054

-

652067.72

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

135054

-

217355.91

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 135054*48*20/25000= 5186 Days avenue plants

5186

-

17385027.8

... More
Item;1st year Maintenance of Avenue Plantaion on ORR (2021planting) 22 to 43km Sr-8762Nos RC-91292 Nos Patancheru Railway corridor =35000Nos total=135054Nos

-

-

-

... More
Item;II. Service Road, Railway Corridor

-

-

-

... More
Item;Cost of Chemicals

-

-

252000

... More
Item;Tractor provision for lift the Trimming material

1

-

384000

... More
Item;ORR Main Carriage way (4 times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx21000 =105000sqmts MCW shrubs =55278x(22/7)x0.30x0.30=15635Sqmt. MCWAvenue = 33826x(22/7)x0.50x0.50=26577Sqmt. Total area=105000-15635-26577=62788Nos

62788

-

167643.96

... More
Item;Central Median Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx21000 =94500 sqmts Individual shrubs=14462x(22/7)x0.30x0.30=4090.61Sqmt. Hedge=17370sqmts. Empty area=21000x0.30x2=12600sqmts Total area=94500-4090.61-17370-12600=60439.39sqmts(4 times)

60439.39

-

158955.6

... More
Item;Cost and supply of water for Lawn,Individual shubs & hedge Plnting once in a day @10lit &5lts per Sqmts Lawn:1573x10x28/25000=17.61x2Months =35.23Days Hedge: 508x5x28/25000=2.84 x2Months =5.68Days Individual Shrubs: =3466x5x15/25000=10.39x2Month=20.76Days TOTAL=35.23+5.68+20.79=61.67Days

61.67

-

206736.34

... More
Item;With Drip system (10 Months)

3466

-

69874.56

... More
Item;Maintenance of Individual shrus: i.Patancheru=300nos ii.Dundigal=450+150+1305+121=2026Nos iii. Ptancheru interhange Up & down Ramps Crash Guard side 2021-22 Planting=1140 Nos Sub Total=3466nos a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days . c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with Manual watering (2 Months)

3466

-

30787.78

... More
Item;With Drip system (10 Months)

508

-

66998.09

... More
Item;Maintenance of hedge planting i.Patancheru=508sqmts i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., with Manual watering (2Months)

508

-

29776.83

... More
Item;With Drip system(10Months)

1573

-

47567.52

... More
Item;Maintenance of lawns: ( 2 Month) i.Patancheru=523+345=868Sqmts ii.Dundigal=355+350=705 sqmts (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (i) June to November -once in 15 days (ii) December to may once in -30 days (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers with Manual watering (2Months)

1573

-

29072.5

... More
Item;Miaintenanace of Up and down Ramps from Patancheru to Dundigal ( 22km to 43 km)

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant

1900

-

9173.39

... More
Item;Circular weeding without application of fertlizers to a radius of 50cms around the plan

1900

-

3057.86

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) (2 months) (2Waterings) 1900x20x2/25000= 3.04Days

3.04

-

10190.99

... More
Item;23-31=1900Nos

-

-

-

... More
Item;6th year Maintenane of MCW Avenue Plantation from Patancheru(22km) to Dudigal (43km)

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant

2586

-

12485.47

... More
Item;Circular weeding without application of fertlizers to a radius of 50cms around the plan

2586

-

4161.91

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) (2 months) (2Waterings) 2586x20x2/25000= 4.14Days

4.14

-

13878.52

... More
Item;31-43=2586Nos

-

-

-

... More
Item;5th year Maintenane of MCW Avenue Plantation from Patancheru(22km) to Dudigal (43km)

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant

10100

-

48763.81

... More
Item;Circular weeding without application of fertlizers to a radius of 50cms around the plan

10100

-

16254.94

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) (2 months) (2Waterings) 10100x20x2/25000=16.16Days

16.16

-

54173.17

... More
Item;22 to 31=3700nos,31-43=6400nos total=10100Nos

-

-

-

... More
Item;3rd year Maintenane of MCW Avenue Plantation from Patancheru(22km) to Dudigal (43km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant( January)

19240

-

92892.64

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant( December)

19240

-

30964.86

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant ( October)

19240

-

92892.64

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

19240

-

30964.86

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) (2 months) (6Waterings) 19240 x 20x6/25000=92.35Days

92.35

-

309584.9

... More
Item;22-31=14131 Nos,31-43=5109Nos Total=19240Nos

-

-

-

... More
Item;1st year Maintenane of MCW Avenue Plantation from Patancheru(22km) to Dudigal (43km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from (2 months) permitted only on non rainy days 55278x 5x15/25000 =165.83 daysx2 Months=331.66 Days

331.66

-

1111823.82

... More
Item;With drip (10Months)

-

-

1114404.48

... More
Item;with Manual watering (2Months)

-

-

491023.42

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins upto 1ft away from the plant

-

-

-

... More
Item;watering - once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)

-

-

-

... More
Item;Trimming - once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from April-2022 to March-2023 (12 Months)

55278

-

-

... More
Item;22 to 31 =13200Nos, 31-43 = 42078Nos , Total=55278Nos

-

-

-

... More
Item;MCW Shrubs Miantenance from Patancheru to Dundigal (22 Km to 43 km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once in a day @5 Litres/plants (sub soil moisture shall be maintained)17370 x 5x28/25000=97.27x2 months =194.54Days

194.54

-

652156.44

... More
Item;With Drip (10months)

-

-

2290859.82

... More
Item;with Manual watering (2Months)

-

-

1018156.45

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)April-2022 to March-2023 (12 Months) only during non - rainy days

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

17370

-

-

... More
Item;Maintanance of Hedge/Shrub planting

-

-

-

... More
Item;22-31 = 6570Sqmts , 31 to-43 = 10800 Sqmts Total=17370 Sqmts

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from permitted only on non rainy days 14462x 5x15/25000 = 43.38x2 Months =86.76days

86.76

-

290845.55

... More
Item;With drip(10Months)

-

-

291553.92

... More
Item;with Manual watering (2Months)

-

-

128463.05

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)

-

-

-

... More
Item;Trimming shrubs once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from

14462

-

-

... More
Item;Maintanance of Individual shrubs: April-2022 to March-2023 (12 Months)

-

-

-

... More
Item;I.ORR Central Median from Patancheru to Dundigal (22 Km to 43 km)

-

-

-

... More
Item;Estimate for the Maintanance Greenery on ORR from Patancheru to Dundigal (22 Km to 43 km) from APRIL - 2022 TO MARCH -2023 (12 Months) during the year 2022-2023

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.