Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
494859Bid Award Id
ViewTender No
1682/2/UF/HMDA/2023Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
item;Maintenance of Lawns From December-2023 to March-2024(Months)
-
-
-
item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 5050x5x15/25000=15.15 Daysx4 Months=60.60
60.6
3352
203149.38
item;Maintenance of Individual plants and shrubs trimming once in 15 days and watering once in a day @ 5 ltrs per plant with manual watering
5050
444
89716.28
item;Maintenance From December-2023 to March-2024(4Months)
-
-
-
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(8"x12")Bags Total lead 25Km =22km x10.58=232.76+542.19
2525
774
19567.49
item;Cost of Shub Plants
2525
50
126250
item;Shrub planting: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
5050
194
980053.5
item;Engaging of JCB for Clening and leveling of sites including the fuel charges and driver batta etc complete 3days X 8 Hours = 24 Hours
24
850
20400
item;Individual Shrub Plantation
-
-
-
item;Engaging of Water tankers for Watering to the Plants through tankers of 5000 Ltrs each trip Capacity 5 trips Per day @ 25000 Ltrs for 3 Month 900x5x28/25000=5.04 Daysx4Months=20.16
20.16
3352
67582.37
item;Maintenance of hedge planting trimming once in 15 days watering once in a day @ 5ltrs per plant with manual watering
900
2930
105508.44
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided.(6"x12")Bags Total lead 25Km =22km x3.02=66.44+338.83
9000
405
36474.3
item;Cost of Hedge Plants
9000
35
315000
item;Hedge planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material 1 Km x0.45x2Sides
900
756
680841
item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete =1000 Sqmt X 0.45x2 = 900 Cum
900
174
157320
item;Hedge Plantation along the Walking Track (1000 RMT @ 45 cm width Both sides = 450 Sq.Mtrs
-
-
-
item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth.From December-2023 to March-2024 (4 months)
224
360
3234.02
item;cost of water to plants through tankers for watering 5000 lts each trip capacity 5 trips per day 20lts per plant in each avenue plants each watering (16 Waterings) From December-2023 to March-2024 =224x20x16/25000=2.86
2.86
3352
9587.58
item;1st soil working 10 cms deep using crowbars to a radious of 50 cms around the plant
224
482
1081.51
item;1st circular weeding without application of fertilizers to radious of 50 cms around the plant
224
160
360.51
item;Replacement of causalities to a maximum of 10% of the planted, including re-opening of pits, transport of plants internal transport and planting. ( 10"x16" Tall plants)
25
2261
565.25
item;Application of fertilizers (2 doses)
224
293
658.4
item;Cost of chemicals and fertilizers 20 grams per pit (2 doses)
224
-
224
item;Cost of supporting stacke of 2.5 mtr long sturdy and straight and minimum 10cm grith at the base (if bamboos are not supplied by Dept) (10"x16")
224
28
6272
item;Planting of bag plants after refilling the pits/support sticks10"x16" bags
224
2139
4791.81
item;Internal transport of bag plants to planting site 10X16 bags
224
608
1362.91
item;10"x16"Bags(10.58x22+735.93)
224
968
2169.87
item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 53Km
-
-
-
item;Cost of Avnue Plants
112
250
28000
item;Application of Folidol dust (10%) @20gms/pit/dose
224
57
127.92
item;Application of Red soil and FYM including internal distribution 75cmt cube pit
224
1233
2763.88
item;Cost of Folidol dust (10%) @20grms/pit
224
-
112
item;Cost and conveyance of well decomposed FYM (0.60 mt pits)
224
2558
5731.56
item;Importation of good quality red earth congenial for plant growth of light textured, crystalline, porous and friable, generally acidic or neutral but not alkaline, fertile, cost, transportation, loading, unloading etc complete 0.60mt pits (0.60X0.60X0.60=0.216x224=48.38 cum x 20%=9.67 cum
9.67
1228
11879.59
item;Digging of pits of size0.60x0.60x0.60 mts
224
6761
15145.12
item;Alignment and Stacking including cost of stacks(45%)
101
97
98.06
item;Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary)
448
65
294.6
item;Avenue Plantation along the Walking Track (1000 RMT @ 3mx3m espacement both sides = 224 Plants
-
-
-
item;Supply and fixing of Granite stone benches of minimum length of 5 feet with flammed finish of approved design and colour including the cost of earth work excavation laying of PCC 1:2:4 in required dimensions fixing chagre labour charges making charges incidental and operation charges contractor profit etc complete for finished item of work and as directed by the engineer
12
11000
132000
item;Signboards
-
-
195000
item;Cost of sculptures (3 Nos)
3
-
2000000
item;Internal Transportation spereading of gravel
500
71
35970
item;Lawn Mounds, Gravel filling
500
204
102100
item;Laying of shabad stone flooring with ran door white 50.80 mm thickness over a base of mud motor of 30mm thickness and pointing of full depth stores with red soil and carpet grass including cost and conveyance of all material and labour chagres 2 feetx2 feet x 125 Rmt= 500
500
4299
214967.5
item;Laying of carpet grass and ramming
1200
58
69720
item;Cost of carpet grass
1200
135
162000
item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass ( 4? thickness after rolling )
1200
333
400500
item;Internal Transportation & application of gravel including spreading
1200
99
119328
item;Supply & stacking of gravel at site to the department guage for permeasurements and it shall be composed for wellgraded coars silicious grains shrp & gritty to touch and free from dirt & other deleteriious matter the cost including of transportation, loading, unloading charges taxes & seiniorage charges etc complete = 600 Sqm x2 M Height =1200 Cum
1200
204
245040
item;Carting of debris including excavation, loading, unloading and transport upto a lead of 10 kms
2000
137
274000
item;ESTIMATE FOR DEVELOPEMNT OF LANDSCAPING WORK AT PANCHATATVA PARK, AMEENPUR DURING THE YEAR 2023-24
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements