Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Pipes and Pipe Related Activities
Opening Date20 Mar 2021
Closing Date25 Mar 2021
Tender Amount₹ 6,81,05,990 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Watering the Potted plants through tankers for watering 5000lts capacity (5 trips per day @ 10lts/alternate Day plant (48 waterings) 223*15*10/25000=1.33x12 days=15.96days

15.96

-

53502.71

... More
Item;Maintenance of Lanco Pots Kokapet =16nos,Kollur & Patancheru=65nos,Dundigal Toll Building =32 Potts,Sulthapur Toll Building =24 Potts,ORR Dundighal under passing=34Potts, Gandimaisamma to Narsapur rotaries =52 pottes Total=223Nos

-

-

-

... More
Item;Cost of chaicals

-

-

55000

... More
Item;Cost and supply of water forshrubs once in alternate day 5 lts per plant (12984 nos x 5 lts x 15 days /25000 lts =38.95 days x6=233.71days

233.71

-

783466.03

... More
Item;With drip

12984

-

157054.46

... More
Item;with Manual watering

12984

-

346002.83

... More
Item;Maintenance of Individual shrus : a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with mannual watering Kokapet TAB=84 nos Dundigal TAB = 1300 nos Dundigal interchange Shrubs=11600nos Total=12984nos

-

-

-

... More
Item;Cost and supply of water forshrubs once in alternate day 5 lts per plant (2404.91 sqmts x 5 lts x 28 days /25000 lts =13.46 days x6=80.80days

80.8

-

270865.84

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

2795.98

-

221250.37

... More
Item;with Manual watering

2795.98

-

491665.81

... More
Item;Maintenance of hedge: i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc., Kokapet TAB=33 sqmts Kollur TAB=96.8sqmts Patancheru TAB=261.27Sqmts Dundigal TAB = 100 sqmts Gandimaisamma Rotary=1345.50sqmts Narsapur Rotary=959.41 Total=2795.98 sqmts

-

-

-

... More
Item;Cost and supply of water for lawn once in a day 10 lts per sqmt 28 days per month for 10 months (28 days) (1149.37sqmts x 10 ltsx28 days /25000 lts=12.87 days x6=77.22days

77.22

-

258864.61

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

1541.47

-

19977.45

... More
Item;with Manual watering

1541.47

-

85469.27

... More
Item;Maintenance of lawns: (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers Kollur TAB=224.33sqmts Patancheru TAB=167.77 Sqmts Dundigal TAB = 125 sqmts Gandimaisamma Rotary=511.27sqmts Narsapur Rotary=513.10 Total=1541.47 sqmts

-

-

-

... More
Item;Maintenance of ground covers: Watering @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously) The watering shall be carried out DAILY during non rainy days, weeding, trimming and keeping the ground cover in healthy condition With Manual watering Kakapet TAB Building =84 sqmts

84

-

9315.03

... More
Item;Maitenanace of TAB Buildings and Rotaries

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant. (October )

2028

-

9791.59

... More
Item;Circular weeding without application of fertlizers to a radius of 50 cms around the plant. (September 1st week)

2028

-

3263.86

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. (12 waterings) (2028 *6*20)/25000= 9.73days April-2021 to March-2022

9.73

-

32617.88

... More
Item;4th year Maintenance of Avenue Plantaion on ORR(2017 planting) : 22.7-39.5-2028 No's

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

6999

-

33792.57

... More
Item;Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

6999

-

11264.19

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 6999*6*20/25000=33.59

33.59

-

112603.76

... More
Item;3rd year Maintenance of Avenue Plantaion on ORR (2018planting) 12-22.7 - IC =2846 No's 22.7-39.5 -IC=4153 No's Total - IC - 6999No's

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. From April-2021 to March-2022 = 12 months Rate =721.88X30%=216.56

302689

-

7866039.58

... More
Item;Protection 1styear+2nd year+3rd year+4th year=178410+2240+44210+77829=302689No's

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant. (October )

77829

-

375773.98

... More
Item;Circular weeding without application of fertlizers to a radius of 50 cms around the plant. (September 1st week)

77829

-

125257.99

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. (12 waterings) (77829 *12*20)/25000= 747 days April-2021 to March-2022

747

-

2504168.1

... More
Item;4th year Maintenance of Avenue Plantaion on ORR(2017 planting) : 0-12-SR+RC-10900+16800+1500- 29200 No's , 12-227.7- SR+RC-14208+11210-25418, 22.7-39.5-16631,39.5 -46km-SR+RC-4956+1624-6580 No's Total - 77829 No's

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

44210

-

213454.72

... More
Item;Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

44210

-

71151.57

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. (12waterings) (44210*12*20)/25000= 424.41days

424.41

-

1422749.64

... More
Item;3rd year Maintenance of Avenue Plantaion on ORR(2018 planting) : 0-12= SR+RC-1327+10673=12000 No's, 12-22.7- SR+RC- 4617+15037=19654 No's ,22.7-39.5- SR=9868 No's, 39.5 - 46-SR=2688No's Total - 44210 No's

-

-

-

... More
Item;Application of chemicals and fertilizers

2240

-

2558.3

... More
Item;Cost of chemicals and fertilizers @ 40gms per plant in two equal doses

2240

-

2240

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

2240

-

10815.17

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

2240

-

3605.06

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

2240

-

10815.17

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

2240

-

3605.06

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 2240*32*15/25000= 43Days avenue plants

43

-

144148.9

... More
Item;2nd year Maintenance of Avenue Plantaion on ORR (2019planting) 39.5-46-SR=2240nos,

-

-

-

... More
Item;Application of chemicals and fertilizers

178410

-

203762.06

... More
Item;Cost of chemicals and fertilizers @ 40gms per plant in two equal doses

178410

-

178410

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

178410

-

861399.16

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

178410

-

287133.05

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

178410

-

861399.16

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

178410

-

287133.05

... More
Item;Trimming of shrubs once in 30 days FromApril-2021 to March-2022 =12 months

60229

-

332030.43

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 118181*48*15/25000= 3403 Days avenue plants 60229*5*96/25000 =1156 days for shrubs Total= 4559Days

4559

-

15283135.7

... More
Item;1st year Maintenance of Avenue Plantaion on ORR (2020planting) 0-12 RC -SR =6000, S Shrubs-15690nos 12-22.7 - SR =9972, S Shrubs-20000 Nos 22.7-39.5 -SR =10300, RC -40800No's, R shrubs - 10000 , 39.5-46-SR=5656nos, Shrubs-7539nos,RC-45453Nos,Shrubs=7000Nos Total - RC,SR - 118181No's ,Shrubs-60229No's

-

-

-

... More
Item;Maintenance of Avenue Plantations on ORR Service roads, Railway corridor from Kokapet to Dundigal (0 km to 46 km)

-

-

-

... More
Item;Cost of Chemicals

-

-

552000

... More
Item;Tractor provision for lift the Trimming material

1

-

384000

... More
Item;ORR Main Carriage way Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx46000 =230000sqmts MCW shrubs =77088x(22/7)x0.30x0.30=21805Sqmt. MCWAvenue =20213x(22/7)x0.50x0.50=15881Sqmt. Total area=230000-21805-15881=192314sqmts

192314

-

513478.38

... More
Item;Central Median Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx46000 =207000 sqmts Individual shrubs=31558x(22/7)x0.30x0.30=8926Sqmt. Hedge=41418sqmts. Empty area=46000x0.30x2=27600sqmts Total area=207000-8926-41418-27600=129056sqmts

129056

-

339417.28

... More
Item;Cost and supply of water forshrubs once in alternate day 5 lts per plant (249sqmts x 5 lts x 28 days /25000 lts = 1.39 days x6=8.34days

8.34

-

27958.18

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

249

-

19703.77

... More
Item;with Manual watering

249

-

43786

... More
Item;Maintenance of hedge / shrub planting i.Patancheru=249sqmts i)Trimming of hedges / shrubs once in 15 days. ii)Watering hedges / shrubs once in a day @ 5 litres / per Sqmts / per day (sub soil moisture shall be maintained continuously). The watering shall be carried out DAILY during non rainy days. iii)Formation of basins 1 ft. away from the hedge. iv)Application of fertilizers, insecticides, Fungicides (@ 20 gms/pit/sqmt) etc.,

-

-

-

... More
Item;Cost and supply of water forshrubs once in alternate day 5 lts per plant (2326 nos x 5 lts x 15 days /25000 lts = 6.97 days x 6=41.86days

41.86

-

140327.28

... More
Item;With drip

2326

-

28135.3

... More
Item;with Manual watering

2326

-

61984.18

... More
Item;Maintenance of Individual shrus and Topairy plants i.Patancheru=300nos ii.Dundigal=450+150+1305+121=2026Nos TOTAL=2326nos a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc.

-

-

-

... More
Item;Cost and supply of water for lawn once in a day 10 lts per sqmt 28 days per month for 10 months (15 days) (1573sqmts x 10 ltsx28 days /25000 lts=17.61 days x6=105.70days

105.7

-

354338.11

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

-

-

20386.08

... More
Item;with Manual watering

-

-

87217.5

... More
Item;Maintenance of lawns: ( 12 Month) i.Patancheru=523+345=868Sqmts ii.Dundigal=355+350=705 sqmts (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (i) June to November -once in 15 days (ii) December to may once in -30 days (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers

1573

-

-

... More
Item;Miaintenanace of Up and down Ramps from Kokapet to Dundigal ( 0km to 43 km)

-

-

-

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2021 to March-2022 (12 Waterings) 17519x20x16/25000= 224.24Days

224.24

-

751719.75

... More
Item;0-12 =6300Nos, 12-23 = 3090Nos , 23-31= 3480 Nos,31-43=4055Nos,43-46=594Nos Total=17519 nos

-

-

-

... More
Item;6th year Maintenane of MCW Avenue Plantation from Kokapet to Dundigal ( 0km to 46 km)

-

-

-

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2021 to March-2022 (12 Waterings) 1900x20x16/25000= 24.32Days

24.32

-

81527.94

... More
Item;23-31= 1900 Nos,

-

-

-

... More
Item;5th year Maintenane of MCW Avenue Plantation from Kokapet to Dundigal ( 0km to 46 km)

-

-

-

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2021 to March-2022 (12 Waterings) 8550x20x16/25000=109.44Days

109.44

-

366875.71

... More
Item;0-12 =3900Nos, 31-43=2586Nos,43-46km=2064nos Total=8550nos

-

-

-

... More
Item;4th year Maintenane of MCW Avenue Plantation from Kokapet to Dundigal ( 0km to 46 km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant( January)

13498

-

65169.69

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant( December)

13498

-

21723.68

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant ( October)

13498

-

65169.69

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

13498

-

21723.68

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2021 to March-2022 (16Waterings)13498 x 20x16/25000=172.77 Days

172.77

-

579176.87

... More
Item;0-12 =2453Nos, 23-31= 3700 Nos,31-43=6400Nos ,43-46=945nos Total=13498 nos

-

-

-

... More
Item;2nd year Maintenane of chain link mesh MCW Avenue Plantation from Kokapet to Dundigal ( 0km to 46 km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant( January)

6715

-

32420.69

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant( December)

6715

-

10807.12

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant ( October)

6715

-

32420.69

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

6715

-

10807.12

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2021 to March-2022 (24Waterings) 6715 x 20x24/25000=128.92Days

128.92

-

432178.52

... More
Item;0-12 =5500Nos, 43-46=1215Nos Total=6715Nos

-

-

-

... More
Item;1st year Maintenane of chain link mesh MCW Avenue Plantation from Kokapet to Dundigal ( 0km to 43 km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from April-2021 to March-2022 (12 months) permitted only on non rainy days 77088x 5x15/25000 =231.26 daysx6 Months=1387.56 Days

1387.56

-

4651517.39

... More
Item;With drip Rate=144x40%=

77088

-

932456.45

... More
Item;with Manual watering

77088

-

2054271.86

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) 6 months

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from April-2021 to March-2022 (12 Months)

-

-

-

... More
Item;0-12 =21500Nos, 12-23 = 18200Nos , 23-31= 13200 Nos,31-43=18500Nos,43-46km=5688Nos Total=77088Shurbs

-

-

-

... More
Item;MCW Shrubs Miantenance from Kokapet to Dundigal (0 Km to 46 km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)41418 x 5x28/25000=231.94x6 months =1391.64 Days

1391.64

-

4665194.77

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

41418

-

3277472.61

... More
Item;with Manual watering

41418

-

7283247.61

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)April-2021 to March-2022 (12 Months) only during non - rainy days

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

-

-

-

... More
Item;Maintanance of Hedge/Shrub planting

-

-

-

... More
Item;0-12 = 10800Sqmts , 12-23 = 10530 Sqmts , 23-31= 6570 Sqmts,31-43=10800Sqmts 43-46=2718 sqmts Total= 41418 Hedge

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from permitted only on non rainy days 31558x 5x15/25000 = 94.67x6 Months =568.02days

568.02

-

1904173.45

... More
Item;With drip

31558

-

381725.57

... More
Item;with Manual watering

31558

-

840970.21

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) 6 months

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from

-

-

-

... More
Item;Maintanance of Individual shrubs: April-2021 to March-2022 (12 Months)

-

-

-

... More
Item;0-12 = 7200Nos, 12-23 = 7000 Nos , 23-31= 4380 Nos,31-43=7200Nos,43-46=1737Nos=27517nos New Pogada Plants 0-12=1013Nos,12-23=55Nos,23-31km=800Nos,31-43km=2173nos=4041Nos Total=27517+4041=31558

-

-

-

... More
Item;ORR Central Median from Kokapet to Dundigal (0 Km to 46 km)

-

-

-

... More
Item;Estimate for the Maintanance of ORR Central Median , MCW,Services roads,Railway corridor, Interchnges,TAB bulildings,Rotaries from Kokapet to Dundigal (0 Km to 46 km) from April-2021 to March-2022(12 Months) during the year 2021-2022 Forest Manager V

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.