Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Development Authority - HMDA Tender
Civil And Construction
Excavation
Opening Date22 Oct 2024
Closing Date5 Nov 2024
Tender Amount₹ 2,18,29,738
Costs
EMD
₹ 2,18,300Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
552650Tender No
HMDA/DEV/CE/11/06/2024-25, Dt: 05-10-2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
BOQ;Supply and erection of G.I. chain link mesh 63 mm X 63 mm X 8 guage (2 1/2''x2 1/2 '') hot dipped galvanised iron chain link mesh 8g (4.0 mm) as per IS 2721-1979 incl. Tying the chainlink fencing to the vertical posts, horizontal ties and ISA struts with 2mm GI wire, conforming to IS 278 - 1978 and incl tack welding of the chain link fencing at 300mm - 400mm interval to the MS angle of vertcal posts vertcal struts and top & bottom horizontal welding where ever required. grinding smooth fabrication hosting and installation as per specification including Contractors profit and Overhead charges., complete for finished items of work and as directed by Engineers-in-charge for fencing
1474.2
541
798927.95
BOQ;Fabricating and Fixing railing / fencing using Mild steel tubular sections,angles,channels etc.,cutting and fabricating to required sizes and shapes, placing in position as per approved designs and drawings to be supplied at the time of execution of work, including cost and conveyance of all Mild steel sections and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental, Labour charges for fabrication,cost of welding , power charges, cost of Labour charges for fixing railing in position, and overheads & contractors profit etc. complete for finished item of work as directed by the Engineer-In-Charge. for fencing
9553.59
143
1373615.17
BOQ;Plain Cement Concrete (1:4:8) nominal mix using concrete mixer for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit, excluding Seigniorage Charges, all duties and taxes complete for finished item of work and as directed by Engineer in Charge. (APSS No. 402) for fencing
5.55
5310
29475.33
BOQ;Earthwork in excavation for structures by mechanical means as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including Contractors profit and Overhead charges but excluding Seignorage charges., complete for finished items of work and as directed by Engineers-in-charge for fencing
38.84
131
5114.06
BOQ;Clearing and grubbing including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm by mechanical means in areas of non thorny jungle(light jungle), removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.including Contractors profit and Overhead charges but excluding Seignorage charges., complete for finished items of work and as directed by Engineers-in-charge for fencing
12285
2
32186.7
BOQ;Providing 230mm thick grouting with 1:3:6 prop using 20mm crushed granite metal and pointing 12mm thick in CM (1:6) for the revetment provided including cost and conveyance of all materials to site , all operational,incidental and labour charges for grouting and pointing etc., overheads & contractors profit, excluding Seigniorage Charges, all duties and taxes complete for finished item of work and as directed by Engineer in Charge. for Strengthening and Widening of Main Bund
5555.2
788
4378386.43
BOQ;Providing and constructing 25 cm thick dry rubble stone pitching (rubble stones: 0.275 cum/sqm) including cost and conveyance of all materials to the site, including all operational, incidental, and labour charges such as hand packing, finishing, etc.,overheads & contractors profit, excluding Seigniorage Charges, all duties and taxes complete for finished item of work and as directed by Engineer in Charge. . for Strengthening and Widening of Main Bund
5555.2
412
2292853.25
BOQ;Providing Plain Cement Concrete (M 15) Nominal Mix 1:2.5:5 including cost and conveyance of all materials like cement, fine Aggregate, coarse aggregate, water, etc., to the site, including all operational, incidental, and labour charges such as machine mixing, laying concrete, curing, etc., and overheads & contractors profit, excluding Seigniorage Charges, all duties and taxes complete for finished item of work and as directed by Engineer in Charge. (APSS No. 402) for Strengthening and Widening of Main Bund
219.54
7530
1653254.75
BOQ;Plain Cement Concrete (1:4:8) nominal mix using concrete mixer for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc., and overheads & contractors profit, excluding Seigniorage Charges, all duties and taxes complete for finished item of work and as directed by Engineer in Charge. (APSS No. 402) for Strengthening and Widening of Main Bund
41.64
5310
221144.63
BOQ;Earth work excavation in Ordinary Soil-Mechanical Means for and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and as per Technical Specification 305 MORD / 304 MORTH, including all labour charges, opeartions charge, lead and lifts, Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge for Strengthening and Widening of Main Bund
59.52
131
7837
BOQ;Providing semi-pervious / pervious casing embankment using soil from approved borrow area in layers of 25cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sortingout, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 8 km and all lifts including Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge for Strengthening and Widening of Main Bund
11904
327
3900821.76
BOQ;Clearing and grubbing including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm by mechanical means in areas of non thorny jungle(light jungle), removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH.including Contractors profit and Overhead charges but excluding Seignorage charges for finished items of work and as directed by Engineers-in-charge for Strengthening and Widening of Main Bund
4464
2
11695.68
BOQ;Supply and fixing of Granite Stone Benches of minimum length of 5 feet with flammed finish of approved design and color including the cost of earthwork excavation,laying of PCC 1:2:4 in required dimensions,fixing charges,labour charges, making charges ,incidental and operation charges,contractor profit etc.complete for finished item of work and as directed by the Engineer-In-Charge.' for MS Railing
10
22000
220000
BOQ;Supply of precast concrete blocks for paving of M-35 grade and thickness not less than 60 mm for Light traffic areas conforming to IS 15658:2006 in all shapes and designs as per the manufacturer's Specification to the site including all operational, Incidental and labour charges for loading & unloading, laying to desired lines and levels etc., including Overheads and Contractor's Profit complete for finished item of work and as directed by the Engineer in charge. for MS Railing
744
786
585074.16
BOQ;Supply and spreading of stone crusher dust (HBG stone chips 2.36 mm and below ) not more than 10% passing 0.075 sieve. for resting the pavers and filling the voids and crevices between the pavers, including cost and conveyance of all materials to the site, all Operational, Incidental and labour charges etc., including Overheads and Contractor's complete for finished item of work and as directed by Engineer In Charge. for MS Railing
55.8
1231
68742.81
BOQ;Painting to new iron works with 2 coats of ready mixed Synthetic Enamel in all shades Grade - I / Polyurethane full gloss Enamel (IS - 13213) paints having VOC (Volatile Organic Compound) content less than 30 grams/ Lit. over a base coat of Zinc Chromate Yellow Oxide Primer paint for iron works including cost and conveyance of all materials labourcharges etc., complete for finished item of work and as directed by the Engineer-in-charge. for MS Railing
744
218
162206.88
BOQ;Supply & application of one coat of based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/litre for exterior walls including cost and conveyance of all materials to the site, all incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work. for MS Railing
496
321
159493.76
BOQ;Supplying and Fixing of Precast M20 grade cement concrete kerb of minimum 300mm length for attaining of smooth curves with the dimensions top and bottom width 50mm and 115mm respectively and 350 mm high with Curved Chamfering within a height of 80mm including Jointing with CM 1:3, including cost and conveyance of all materials to the site ,Including all Operational, incidental, Labour Charges for transportation, laying to desired lines etc., complete for finished item of work. for MS Railing
496
340
168912.8
BOQ;Plastering 20mm thick in two coats using screened sand (with 50% river sand and 50% Manufactured sand) with a base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing using river sand including cost and conveyance of all materials like cement, sand, water etc., to the site, including all operational, incidental and labour charges for mixing mortar, finishing, curing, including cutting grooves etc., and overheads & contractors profit complete for finished item of work. for MS Railing
446.4
745
332755.49
BOQ;Supplying and laying of PVC pipes of 100mm dia (Prince/Sudhakar /Kisan / Supreme or any ISI brand) and fixing as per site requirement, including cost and conveyance of all materials to the site, labor charges, overheads & contractors' profit complete for finished item of work. for MS Railing
60.9
375
22875.87
BOQ;RCC M-20 Nominal mix for Railing Beam (Cement:fine aggregate:coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water, etc., to the site, including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete for finished item of work. for MS Railing
44.64
12122
541145.28
BOQ;RCC M-20 Nominal mix for Pedestals (Cement:fine aggregate:coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water, etc., to the site, including all operational, incidental and labor charges such as machine mixing, laying concrete, curing, etc., complete for finished item of work. for MS Railing
16.36
9497
155373.21
BOQ;Supplying and fabricating, erecting, and fixing of MS Solid bars of approved design with structural steel.,complete as per the approved drawing including cost and conveyance of all materials to the site, all Operational, Incidental and labour charges for erecting & fixing all structural steel works in position and overheads and contractor profit etc., complete for finished item of work. for MS Railing
12886.56
134
1735690.77
BOQ;Supplying and fabricating, erecting and fixing of Structural Steel hollow Tubular sections of 240 MPA grade conforming to IS 1161-2014., complete as per the approved drawing including cost and conveyance of all materials to the site, all Operational, Incidental and labour charges for erecting & fixing all structural steel works in position and overheads and contractor profit etc., complete for finished item of work. for MS Railing
9974.38
143
1434116.36
BOQ;Supplying, fitting and placing of Thermo Mechanically Treated (TMT) (Fe 500/500D/550D grade of different diameters for RCC works, including cost and conveyance of all materials to the site, including all incidental, operational, labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire, forming grills for reinforcement work as per approved designs and drawings, and overheads & contractors profit etc., complete for finished item of work for MS Railing
4795.04
66
319541.56
BOQ;Plain Cement Concrete (1:4:8) (cement: fine aggregate: Coarse aggregate) with hand mixing under foundations and flooring bed using coarse aggregate 40mm size hard, machine crushed granite from approved quarry including cost and conveyance of all materials like cement, fine aggregate (with 50% river sand & 50% manufactured sand), coarse aggregate, water etc. to site, including all Operational, Incidental and Labour charges for mixing, laying, Curing of concrete, overheads & contractors profit complete for finished item of work. for MS Railing
116.74
5310
619990.96
BOQ;Earth work excavation in Ordinary Soil-Mechanical Means for and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work. for MS Railing
61
131
8031.87
BOQ;Earth work excavation in Ordinary Soil-Manual Means for foundations and depositing on the bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. and overheads and contractor profit complete for finished item of work. for MS Railing
29.76
321
9568.44