Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
523925Bid Award Id
ViewTender No
187/45/HMDA/UF/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Cost and supply of water through water tankers every alternate day @ 5 Lites/Plants per day (sub soil moisture shall be maintained ) (12 months) 2666x5x15/25000= 7.99x12months= 95.88 days
105.48
3352
353600.6
Item;Maintanance of individual shrubs. flowering plants topiaryornamental bamboo, palms etc., with manual watering (12 months) 1)Trimming hedges/Shrubs once in 15days. 2) watering hedges/shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) 3) Formation of basins 1ft away from the hedge. 4) Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. As and when drip/water pipe is provided this item will not be paid,
2930
444
133854.12
Item;Cost of pesticides and Fertilizers
-
-
4873
Item;Cost and supply of water to the hedge plants 5Litre/sqmt/once in a day 28 times/month through the tankers (12 months) 6188.06x5x28/25000= 34.65 x 12 months = 415.80 days
324.96
3352
1393886.34
Item;Maintenance of Hedge Planting: i)Trimming of hedges once in 15 days ii)Watering to hedges once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously)Formation of basins for each and every plant upto 1 ft away from the plant iii)Application of fertilizers, insecticides, fungicides etc.for from April 2024 to March 2025
4836
2930
2176309
Item;Cost and supply of water through water tankers every alternate day @ 5 Lites/Plants per day (sub soil moisture shall be maintained ) (12 months) 2666x5x15/25000= 7.99x12months= 95.88 days
95.88
3352
321418.52
Item;Maintanance of individual shrubs. flowering plants topiaryornamental bamboo, palms etc., with manual watering (12 months) 1)Trimming hedges/Shrubs once in 15days. 2) watering hedges/shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) 3) Formation of basins 1ft away from the hedge. 4) Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc. As and when drip/water pipe is provided this item will not be paid,
2666
444
121793.54
Item;Maintenance of Central Median from Shankarpally to Chevella
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements