Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Opening Date14 Nov 2024
Closing Soon28 Nov 2024
Tender Amount₹ 3,99,62,788 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
BOQ;S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro- compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc., for Construction of Pump House of Size 3 X 3 Mtr

0.81

755

611.99

... More
BOQ;Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x 15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved make and manufacture. M.S. frame shall be covered with 5mm thick heat molded PVC ?C? channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail. Paneling of 5mm thick PVC sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide x 5mm thick PVC sheet beading on either side, and joined together with solvent cement adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the interior side of the ?C? Channel using PVC solvent adhesive. Complete as per direction of Engineer-in- charge, manufacturer?s specification & drawing for finished item of work for Construction of Pump House of Size 3 X 3 Mtr

1.5

2604

3906.09

... More
BOQ;Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded Particle Board as per IS 14276 (Bison Panel or Equivalent) : Providing and fixing of door frame made from cold roll formed sections made of galvanized (Base steel as per IS277 with zinc of 120 Gms/sqm) colour coated steel sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7 microns thick, finish paint with polyester paint of 12-16 microns. The Section for door frame is to be filled with polyurethane (P.U) form of 40kg/m3. Overall size of frame section should be of 50mm x 50mm. With necessary corner brackets, stiffeners, hinges, and screws. Cement Bonded particle board shutter (Bison Panel or Equivalent) ?Single Leaf? with all round styles ?U? section of size 12m x 18m x 12mm made from 0.6 mm thick galvanized, colour coated cold rolled steel profiles with 16mm thick Cement Bonded particle Board (Bison Panel or Equivalent) with necessary screws fixed at every 1?-0? (304.8mm) intervals. The cost inclusive of MS nickel coated Aldrop of size 250mm long 2nos. 200mm long tower bolt 1no., 125mm handles 2nos., cost and conveyance of all materials at site and applying one coat primer , one coat of luppum and two coats of synthetic enamel paint as per approved design for Construction of Pump House of Size 3 X 3 Mtr

2.4

4674

11217.89

... More
BOQ;TBSC-M.II-01 : Providing and fixing 2 Track 2 glass shutter sliding Windows fabricated from roll formed sections made of Galvanized Steel Colour Coated/ Powder Coated (Base Steel as per IS 513 ?D? quality, Galvanized as per IS 277 with Zinc of 120 GM/Sq.mtr) with total coated thickness of 0.58 mm. Primer coat with epoxy primer of 5?7 micron thick, finish painted with polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or Powder Coated with pure Polyester Powder up to 50-60 microns thick. Section for external frame should be of 44x 59mm, Section for glass shutter should be of 35x 49 mm Section for euro groove should be 25 x 24mm( Aluminium/Plastic)and Lap Strip should be of 30 x 41mm(Aluminium/Plastic).shutter should be provided with a glass of 5mm Plain Float Glass. Corner bracket for External frame made of Steel/Polypropylene, Corner Bracket for Internal frame made of Steel/Polypropylene, Touch Lock, Rollers, wool pile for lap strip & euro groove, Bump Stop Base & Rubber for shutter stopper. Ethyl Propylene Diamine Monomer (EPDM) Gasket should be used all around glass in shutter. The Frame Section should be cut to length and mitre joined with Corner brackets & Shutter Sections should be cut to length and mitre joined with Corner Bracket. Window Frame should be fixed to brick/ concrete masonry by using Nylon self-expanding caps and driving MS electroplated 80mm long screws into the caps through frames.10mm square guard bars with 6? pitch (152.4mm) max to be fixed wall to wall and all taxes complete for finished item of workand all taxes etc., complete for finished item of work for Construction of Pump House of Size 3 X 3 Mtr

3.6

9199

33117.88

... More
BOQ;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) bars (Fe-500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126) for Construction of Pump House of Size 3 X 3 Mtr

740.65

84

62807.12

... More
BOQ;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, seigniorage charges, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work for Construction of Pump House of Size 3 X 3 Mtr

12.96

602

7810.08

... More
BOQ;Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 911 for internal walls for Construction of Pump House of Size 3 X 3 Mtr

37.62

150

5648.27

... More
BOQ;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) making 2 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912. for Construction of Pump House of Size 3 X 3 Mtr

47.03

156

7354.08

... More
BOQ;White washing Two coat with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials for Construction of Pump House of Size 3 X 3 Mtr

9.27

32

301.92

... More
BOQ;Plastering with 12mm thick in single coat in CM (1:3) finished smooth including cost and conveyance of all materials , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm.Ceiling for Construction of Pump House of Size 3 X 3 Mtr

9.27

202

1878.94

... More
BOQ;Plastering with 12mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm. for Construction of Pump House of Size 3 X 3 Mtr

37.62

192

7240.72

... More
BOQ;Plastering with 15mm thick in single coat in CM (1:4) finished smooth including cost and conveyance of all materials , finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). per 10 Sqm. for Construction of Pump House of Size 3 X 3 Mtr

27.6

207

5738.87

... More
BOQ;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, labour and all operations for constructing half brick masonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials. for Construction of Pump House of Size 3 X 3 Mtr

13.09

1033

13532.18

... More
BOQ;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:6 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., excluding Seigniorage charges on all materials, including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work for Construction of Pump House of Size 3 X 3 Mtr

6.31

8297

52354.2

... More
BOQ;Using Concrete mixture up to Plinth Level Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 12mm size Hard Granite Machine Crushed Graded Metal excluding cost and conveyance of all materials like cement, sand, coarse aggregate water etc., labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Construction of Pump House of Size 3 X 3 Mtr

0.08

6009

480.76

... More
BOQ;Construction of CRS Masonary 2nd Sort in Cement Mortor ( 1:6 ) Prop using hard granite stone including cost & Conveyance of all materials like Cement, Sand , Water, Granite Stones, excluding Seigniorage Charges on all Materials, ,labour charges for cutting Stones to required size and shape, mixing of Cement Mortor, Construction, Scaffolding Charges curing etc., complete for finished item of Work . for Construction of Pump House of Size 3 X 3 Mtr

6.36

5047

32099.56

... More
BOQ;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for Sun shades of 0.60 Mts wide and 75mm thick at fixed end and 50mm thick at free end for Construction of Pump House of Size 3 X 3 Mtr

12.45

1153

14363.69

... More
BOQ;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. ffor Roof Beams for Construction of Pump House of Size 3 X 3 Mtr

1.01

12894

13023.3

... More
BOQ;Supply and placing of the M-20 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for 125mm thick roof slab GF for Construction of Pump House of Size 3 X 3 Mtr

2

12342

24684.38

... More
BOQ;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for lintels for Construction of Pump House of Size 3 X 3 Mtr

0.26

14292

3716.03

... More
BOQ;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for clomuns for Construction of Pump House of Size 3 X 3 Mtr

0.91

14075

12808.63

... More
BOQ;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for plinth beams for Construction of Pump House of Size 3 X 3 Mtr

0.88

13740

12091.75

... More
BOQ;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for pedestals for Construction of Pump House of Size 3 X 3 Mtr

0.49

11393

5582.73

... More
BOQ;Supply and placing of the M-25 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for footings for Construction of Pump House of Size 3 X 3 Mtr

1.4

10767

15074.23

... More
BOQ;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) for Construction of Pump House of Size 3 X 3 Mtr

5.85

39

232.25

... More
BOQ;Using Concrete mixture all works up to Plinth Level Plain Cement concrete nominal mix (1:5:10) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. for Construction of Pump House of Size 3 X 3 Mtr

2.28

4644

10589.85

... More
BOQ;EXCAVATION IN RESTRICTED PLACES Ordinary Soil-Manual Means-Upto 3 m depth Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). for Construction of Pump House of Size 3 X 3 Mtr

3.85

458

1763.3

... More
BOQ;BLD-CSTN-2-7 - (15) - Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) Hard rock (blasting prohibited)-Upto 3 m depth Earth work excavation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). for Construction of Pump House of Size 3 X 3 Mtr

2.15

1612

3466.02

... More
BOQ;Earthwork excavation for structures in all types of soil as per drawing and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH. for Sumps,Thrust blocks, Chambers and Man Holes etc. by manual means, for Construction of Pump House of Size 3 X 3 Mtr

7.78

279

2175.75

... More
BOQ;Construction of I No. 1700 KL ELSR of suitable design in a single compartment with a staging of 15.00 mts and with dead storage of 0.15 Mts and 0.45 Mts free board above MWL and below bottom of roof beam. The ruling levels i.e., MWL,LWL,GL shall be adopted as per hydraulic designs.

1700000

15

25935200

... More
BOQ;Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD. For Laying of Mains Pipe of 300 dia DI K7

2.25

7095

15964.56

... More
BOQ;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) For Laying of Mains Pipe of 300 dia DI K7

2.25

1226

2758.52

... More
BOQ;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for road restoration works as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete For Laying of Mains Pipe of 300 dia DI K7

4.5

279

1258.47

... More
BOQ;Manufacturing ,Supplying and errection of air valve gaurd cabins of size 0.90 x0.90 x 0.90 m made with 4 nos vertical and 8 nos horizontal MS flats of size 50x8 mm and 12mm dia MS round bars fixed at 10 cm c/c with door and locking arrangements as per approved drawing and as directed by the departmental officers and painting both sides with Anti corrosive paint two coats over one coat of red oxide primer coat including cost and conveyance of all materials, Labour charges for fabrication and fixing, welding, including cost of earth work excavation, fixing in position duly embodying in PCC M10 concrete (by 0.45 mts) and all other incidental and operational charges etc complete for finished item of work For Laying of Mains Pipe of 300 dia DI K7

2

11621

23243.36

... More
BOQ;PHE-CCIP-23 : Cutting C.I./ DI Pipes without water in mains whereever required for complete work as directed by the Departmental officers.For Laying of Mains Pipe of 300 dia DI K7

1

477

477.01

... More
BOQ;Carting of surplus excavated Earth or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.

129.1

102

13237.91

... More
BOQ;Carting of surplus excavated Rock or any other unwanted material from the site to a distance of 5kms including loading, unloading, idle hire charges of machinery suitable, dumping, labour charges for all leads & lifts and other incidental and operational charges etc., complete as directed by the Engineer in Charge.for for 250mm dia to 350 Sluice valves For Laying of Mains Pipe of 300 dia DI K7

21.04

102

2157.44

... More
BOQ;Construction of Valve chambers of size (1.5mx1.5mx1.5m height- clear dimensions) with Reinforced Cement Concrete vertical walls of 150mm thickness and RCC slab of 100mm thick fitted with RCC man hole cover and frame, laying in M20 grade concrete with reinforcement including cost and conveyance of material, labour charges, curing, centering charges etc., complete as per standard specifications and standard drawings and as directed by the Engineer in Charge for 250mm dia to 350mm dia valves.for 250mm dia to 350 Sluice valves.For Laying of Mains Pipe of 300 dia DI K7

1

23056

23056.29

... More
BOQ;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete as directed by the Engineer in Charge for 200mm dia air valve For Laying of Mains Pipe of 300 dia DI K7

1

738

738.5

... More
BOQ;Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete as directed by the Engineer in Charge for 80mm dia air valve For Laying of Mains Pipe of 300 dia DI K7

1

357

357.89

... More
BOQ;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality. Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the department DI Air Valves - PN-16 - Test Pressure For Laying of Mains Pipe of 300 dia DI K7

1

75735

75735.68

... More
BOQ;Manufacture, supply and delivery of Single Chamber DI Air Valve with Body and cover in Ductile Iron of grade GGG-40/SG-400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions. All internal parts such as float, shell etc., all cover bolts, of stainless steel, and Gaskets and seals of EPDM food grade quality. Epoxy powder coating (EP-P) inside and outside colour blue. Drilled as per requirement of the department DI Air Valves - PN-16 - Test Pressure For Laying of Mains Pipe of 300 dia DI K7

1

48651

48651.13

... More
BOQ;Jointing CI/ DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete as directed by the departmental officers. (Reference to specifications. BIS No.3114/1994.) for 300mm dia Sluice Valves for 300mm to 450mm dia pipes For Laying of Mains Pipe of 300 dia DI K7

3

710

2132.64

... More
BOQ;Lowering, keeping in position and fixing C.I./ DI sluice valves (with cap / with hand wheel & reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces as directed by the Engineer in charge for 300mm dia Sluice Valves for 300mm to 450mm dia pipes For Laying of Mains Pipe of 300 dia DI K7

1

1059

1059.58

... More
BOQ;Manufacture, Supply and Delivery of CI Dismantling joints with both side flange end siutable for installations in between flange end pipes including loading, unloading, conveyance excluding all taxes etc., complete as directed by the Engineer in Charge. for 300mm dia Sluice Valves for 300mm to 450mm dia pipes For Laying of Mains Pipe of 300 dia DI K7

1

32964

32964.29

... More
BOQ;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/SG- 400/15 or GGG-50/SG-500/7 or equivalent grade as per I.S.3896-part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163-89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per requirement of the department. For PN-16 - Test Pressure for 300mm dia Sluice Valves for 300mm to 450mm dia pipes For Laying of Mains Pipe of 300 dia DI K7

1

80774

80774.44

... More
BOQ;Manufacture, Supply and Delivery of Centrifugally cast (spun) Ductile Iron Fittings conforming to IS:9523/2000 having dimensions as per table. The rates mentioned here under are for fittings, zinc coated externally with inside mortar lining (with finishing as per class 13/IS 9523/2000) (ex-works) including loading, unloading, Transportation, stacking at site as directed by the departmental officers excluding Taxes (Diameter upto 500mm dia) for Total weight of Cast (spun) ductile iron fittings - Up to 500mm dia For Laying of Mains Pipe of 300 dia DI K7

265.2

151

40265.32

... More
BOQ;PHE-JCIR-4: Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket, including the cost of the gasket, all sundries, filling with water, with a water lead upto 500 m and testing to required pressure etc., complete as per BIS No.3114/85. For Laying of Mains Pipe of 300 dia DI K7

55

625

34401.4

... More
BOQ;PHE-LCIS-1 : Lowering C.I. / D.I. Pipes (all classes) and specials (fittings) with s/s ends carefully into trenches and laying them true to alignment and gradient including all sundries but excluding cost and conveyance of pipes from source of supply (Ref to specifications. BIS No.3114/1994). For Laying of Mains Pipe of 300 dia DI K7

250

196

49072.5

... More
BOQ;Manufacture, supply and delivery of Centrifugally cast (spun) Ductile Iron pressure pipes for water, Gas and sewage with socket spigot ends confirming to I.S.: 8329/2000 in standard working lengths of 4,5,5.5 & 6 meter for classification K7 suitable for push on joint ( Rubber Gasket D jointing) with cement mortar lining inside the pipes with out side Zinc coating. Rates are including Transportation etc,. complete including cost, coveyance and stacking at site as directed by the Departmental officers For Laying of Mains Pipe of 300 dia DI K7

250

4787

1196885

... More
BOQ;Filling with HBG stone chips of 2.36mm and below in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310) For Laying of Mains Pipe of 300 dia DI K7

1.88

1226

2304.9

... More
BOQ;Barricading, hoarding, lighting and watching etc., for water supply and sewerage works for trenches of depths upto 6?-0? (2 Meter) below G.L as directed by the departmental officers For Laying of Mains Pipe of 300 dia DI K7

250

222

55575

... More
BOQ;Hard rock (blasting prohibited) - upto 3.00 Mts. below GL (Using Air Compressor and Jack Hammers) : Excavation in Hard Rock in habitant areas where conventional blasting can not be done for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete as directed by the Engineer in charge For Laying of Mains Pipe of 300 dia DI K7

9.77

1612

15750.22

... More
BOQ;Earth work excavation in hard rock (blasting prohibited) (Using Hydraulic Excavator with breaker attachment) upto 3m depth using hydraulic brakers for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding seigniorage excluding dewatering charges etc as per SS - 20 B (APSS 308) as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including diversion of traffic and disposal of rock upto a lead of 50 m, including all incidental and operational charges etc., complete For Laying of Mains Pipe of 300 dia DI K7

9.77

1008

9851.48

... More
BOQ;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means. In ordinary soils, by Manual means for Pipe line Trenches where depth is < 1.5 times width For Laying of Mains Pipe of 300 dia DI K7

9.77

458

4474.66

... More
BOQ;In ordinary soils, up to 3.00 Mts depth below GL by Manual means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material , dressing of sides and bottom as per Technical Specification 305 MoRD / 304 MoRTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water pipe lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Line trenches by manual means.For Laying of Mains Pipe of 300 dia DI K7

19.54

279

5464.56

... More
BOQ;In ordinary soils up to 3.00 Mts depth below GL by Mechanical means: Earthwork excavation in all kinds of soil for Pipe line trenches as per drawings and technical specifications including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom as per Technical Specification 304 MORTH and as directed by the departmental officer including protecting the existing utility services wherever it is possible during the execution and taking all precautionary measures in the restricted areas for laying sewer/water lines including divertion of traffic and backfilling in trenches with excavated suitable material and disposal of remaining earth upto a lead of 50 m, including all incidental and operational charges etc., complete for Pipe Lines by mechanical means. For Laying of Mains Pipe of 300 dia DI K7

146.53

127

18710.42

... More
BOQ;Cutting Water Bound Macadam/ Wet Mix Macadam road including soiling and stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers.For Laying of Mains Pipe of 300 dia DI K7

28.13

327

9204.42

... More
BOQ;Cutting open BT road surface including stacking of excavated materials for pipe line trench work including labour charges and all incidental and operational charges etc., complete as directed by the departmental officers. For Laying of Mains Pipe of 300 dia DI K7

1.5

1280

1920.66

... More
BOQ;Construction of Valve chambers with M20 Grade RCC base slab, side walls and top Slab,reinforced with HYSD Bars with inside Plastering including cost and conveyance of all material, centering charges, labour charges, curing and including earth work,back filling and carting of excated earth,etc., as per approved specifications and drawings and as Directed by Engineer in Charge for-Cost of valve chambers for- Construction of valve chambers for 250 to 350mm Valve for Construction of 1700KL RCC Sump

2

23056

46112.58

... More
BOQ;Supply and fixing of precast RCC chambers having the size of 910mm at bottom and 530mm at top with tapers along with FRC cover and frame, laying in CC (1:2:4) prop including cost of material, labour charges, curing, conveyance etc., complete as per standard specifications and approved drawings as directed by the Engineer-in-Charge.-For up to 200mm dia Sluice valves for Construction of 1700KL RCC Sump

1

6644

6644.24

... More
BOQ;Manufacture, supply and delivery of centrifugally cast (spun ) ductile iron fittings conforming to IS No. 9523/2000 having dimentions as per table. , zinc coated externally with inside mortor lining (with finishing as per class 13/IS 9523/2000 as per Code No 1 ) including transportation, for Construction of 1700KL RCC Sump

14113.44

151

2142843.6

... More
BOQ;Supply and erection of lightning arrestor of standard type reputed make including all its accessories including earthing and all labour charges for erection etc., complete as per SS for Construction of 1700KL RCC Sump

1

10000

10000

... More
BOQ;Supply and erection of water level indicator of reputed make including all its accessories and all labour charges for erection etc., complete as per SS for Construction of 1700KL RCC Sump

1

5000

5000

... More
BOQ;Supply and erection of RCC Finial of standard type including all its accessories and all labour charges for erection etc., complete as per SS for Construction of 1700KL RCC Sump

1

5000

5000

... More
BOQ;Supply and erection of DI Swan nect ventilators with mosquito proof of standard type including cost and conveyance to work spot and all labour charges for erection etc., complete as per SS for Construction of 1700KL RCC Sump

4

5000

20000

... More
BOQ;Carting of surplus excavated Earth/ rock from the site to a distance suitable including loading, unloading charges, cost & conveyance, dumping, labour charges, all leads & lifts and other incidental and operational charges etc., complete. for Construction of 1700KL RCC Sump

1765

102

180983.1

... More
BOQ;Manufacture, Supply and Delivery of M.S. Dismantling Joints with both side flange end suitable for installation in between flange end pipes. Thickness as per IS: 7322. These rates are excluding Excise duty, Taxes but including transportation charges etc., complete for 350 mm dia Sluice Valve for outlet for Construction of 1700KL RCC Sump

2

78182

156365.4

... More
BOQ;Manufacture, Supply and Delivery of D.I/CI Dismantling Joints with both side flange end suitable for installation in between flange end pipes. These rates are excluding Excise duty, Taxes but including transportation charges etc., complete for 150 mm dia DI D/F Sluice Valve for Scour for Construction of 1700KL RCC Sump

1

12204

12204.3

... More
BOQ;Jointing DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.).for 350 mm dia Sluice Valve for outlet for Construction of 1700KL RCC Sump

4

1029

4118.76

... More
BOQ;Jointing DI pipes, fittings and valves with flanged ends including cost of jointing materials such as bolts, rubber insertion, white lead including filling with water, with lead up to 500 meters and testing to required pressure complete. (Reference to specifications. BIS No.3114/1994.)for 150 mm dia DI D/F Sluice Valve for Scour for Construction of 1700KL RCC Sump

2

433

866.88

... More
BOQ;Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & Reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces..for 350 mm dia Sluice Valve for outlet for Construction of 1700KL RCC Sump

2

1789

3578.88

... More
BOQ;Lowering, keeping in position and fixing C.I. sluice valves (with cap / with hand wheel & Reflex valves) excluding cost of bolts, nuts, rubber insertion, sluice valve and tail pieces. for 150 mm dia DI D/F Sluice Valve for Scour for Construction of 1700KL RCC Sump

1

317

317.45

... More
BOQ;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896- part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163- 89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538.for 350 mm dia Sluice Valve for outlet for Construction of 1700KL RCC Sump

2

244559

489118.44

... More
BOQ;Manufacture, Supply and delivery of DI D/F Gate Valves (Soft Seated) Resilient seated soft sealing gate valves (Sluice valves) with body bonnet of ductile cast iron of grade GGG40/ SG 400/12 or equivalent grade as per I.S.3896- part2-1985 and subsequent revisions, wedge fully rubber lined with EPDM food grade quality and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face to face dimensions as per BS5163- 89/IS14846-2000/DIN 3202 F 4. All the valves should be with Electrostatic powder coating both inside and outside pocket less body passage. Drilled as per IS:1538. for 150 mm dia DI D/F Sluice Valve for Scour for Construction of 1700KL RCC Sump

1

23221

23221.26

... More
BOQ;TBSC-R.I-22 :S&F of pre-cast RCC Grills of any design of 50 mm thick manufactured with M-30 grade of concrete using vibro- compaction process using joint less FRP moulds to achieve shuttering finish and adequately reinforced for long use and to prevent damage during handling, transportation & erection etc., for Construction of 1700KL RCC Sump

9.43

755

7124.74

... More
BOQ;supply and fixing of 125 micron Ldpe sheet per aprooved drawing and as directed by the departmental officers including cost of all materials and all other incidental and operational charges etc., complete for finished item of work. for Construction of 1700KL RCC Sump

452.2

25

11305

... More
BOQ;Manufacturing, supply and erection of Aluminum ladders with per aprooved drawing and as directed by the departmental officers and painting both sides with anti corrosive paint two coats over one coat of primary coat including cost of all materials fabrication, taxex and duties, fixing in position duly embodying in CC (1:1.5:3) prop., and all other incidental and operational charges etc., complete for finished item of work. for Construction of 1700KL RCC Sump

7.5

16420

123150

... More
BOQ;Supplying and fixing of MS manhole 3mm thick MS plate alround and frame with 60 x 60 x 6 mm L angle shaped MS frame including fixing with 2 Nos of MS Z holdfasts making to original surface neatly and painting grill with one coat of red oxide primer including and conveyance of all materials ,cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work. for Construction of 1700KL RCC Sump

0.64

3316

2122.63

... More
BOQ;White washing two coats with whiting of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work, but excluding conveyance charges of materials for Construction of 1700KL RCC Sump

352.63

51

18075.81

... More
BOQ;Plastering with 12mm thick in single coat in CM (1:3) using Warer proof cement paint, finished smooth including cost and conveyance of all materials to site, finishing, curing, scaffolding and all operational, incidental, labour charges etc., including cutting grooves where ever necessary etc., complete for finished item of work. (As per SS 903). for Construction of 1700KL RCC Sump

1170.13

202

237173.65

... More
BOQ;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) bars (Fe-500/500D/550D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying etc., complete for finished item of work.( APSS No.126) for Construction of 1700KL RCC Sump

19699.3

84

1670500.64

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. S for B1 Outer Ring Beam & B2 beams for Construction of 1700KL RCC Sump

26.9

13178

354499.5

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for ventilator 3m Dia for Construction of 1700KL RCC Sump

1.56

11727

18294.37

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete for finished item of work (APSS No. 402) with minimum cement content as per IS code including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for Top Dome for Construction of 1700KL RCC Sump

75.41

18175

1370592.59

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code ffor Columns for ventilator for Construction of 1700KL RCC Sump

0.24

14189

3405.37

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code for Side Wall avg 300 mm thick circular & walls for suction pump for Construction of 1700KL RCC Sump

118.88

15167

1803070.79

... More
BOQ;Supply and placing of the M-30 Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code . for Base slab for Construction of 1700KL RCC Sump

146.97

10880

1599170.28

... More
BOQ;Brick Masonary 2nd Class Ground moulded or treditional size 23x11x7 Cm in Cement Mortor 1:4 Prop including Cost & conveyance of all Materials like Cement, Sand, Bricks, Water, etc., including all labour charges like mixing Cement Mortor, scaffoding charges lift charges , curing charges etc., complete for finished item of work for Construction of 1700KL RCC Sump

11

8433

92766.96

... More
BOQ;Using Concrete mixture all works up to Plinth Level : Plain Cement concrete nominal mix (1:3:6) prop (Cement : fine aggregate: coarse aggregate ) using 40mm size Hard Granite Machine Crushed Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work.for foundation and under flooring bed. for Construction of 1700KL RCC Sump

3.67

5271

19347.03

... More
BOQ;Using Concrete mixture up to Plinth Level: Plain Cement concrete nominal mix m-20 (Cement : fine aggregate: coarse aggregate ) using 20mm size Hard Granite Machine Crushed Graded Metal including cost and conveyance of all materials like cement, sand, coarse aggregate water etc., to site , labour charges , for mixing , laying, concrete , ramming in 15 cm layers, finishing top surface to the required level curing etc., complete for finished item of work with nomonal reinforcement for Construction of 1700KL RCC Sump

49.17

6009

295489.08

... More
BOQ;Excavation in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with initial lift of 3 mts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 MORD / 301 MORTH ( for all lifts by machanical means) for Construction of 1700KL RCC Sump

941.09

1019

959074.23

... More
BOQ;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH for Sumps, Thrust Blocks and Man Holes etc,. for Construction of 1700KL RCC Sump

1411.64

127

180252.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.