Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Furnitures and Fixtures
Opening Date26 Aug 2023
Closing Date2 Sep 2023
Tender Amount₹ 11,01,793 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Maintenance of all play equipments for 3rd year @4%

1

30850

30850

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Maintenance of all play equipments for 4th year @5%

1

37020

37020

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Maintenance of all play equipments for 5th year @6%

1

43190

43190

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Earthwork in excavation for structures by Mechanical means as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH, including all operational, incidental and labor charges, lead and lifts Complete for finished item of work and as directed by Engineer in charge.

81

130

10559.16

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Filling with River Sand at Childrens Play Area with initial lead in layers not exceeding 15 cm thick, including cost and conveyance of all materials to site, all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. (APSS NO. 309 & 310)

81

3122

252906.3

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Brick masonry in CM (1:8) prop: (Cement: Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water, etc., to the site, and such as labor charges for mixing cement mortar, constructing masonry, curing, etc.,and overheads & contractors profit complete for finished item of work. (APSS No. 501 & 504).

4.55

8376

38148.81

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Plastering 20mm thick in two coats using screened sand with a base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water, etc., to site and all operational, incidental charges on materials and including the cost of all labor charges for mixing mortar, finishing, curing, including cutting grooves as directed by Engineer-in-charge, etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904).

57

576

32874.75

... More
Providing 3 Pillar Multistation Children Play Equipment, Seesaw including Maintenance for 5 Years at;Painting to new walls with 2 coats of water proof cement paint of shade as approved by the Engineer-In-Charge over a base coat of aproved white cement base coat making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work as per SS 912 in all floors

57

255

14564.07



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.