Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Agriculture or Forestry Works
Opening Date26 Jul 2024
Closing Date31 Jul 2024
Tender Amount₹ 39,30,684 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Maintenance of individual shrubs: i) Trimming once in 15 days.ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously).iii)Formation of basins for each and every plantupto 1 ft. away from the plant.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering

400

444

14212.48

... More
Item;Maintenance of hedge planting: i) Trimming of hedges / shrubs once in 15 days.ii)Watering hedges / shrubs once in a day @ 5 litres/ per Sqmts / per day (sub soil moisture shall bemaintained continuously). iii) Formation of basins 1 ft. away from the hedge.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,

300

2930

70338.96

... More
Item;Maintenance of Lawns : i) Watering of lawns @10-15 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be allowed)ii) Lawn moving and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm.iii) Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shapes or smooth curves.iv) Keeping the lawns always in lush green & weed-free condition.v) Application of fertilizers, insecticide, fungicides etc. a) With Manual watering.

900

924

66535.92

... More
Item;cost of Plants

6000

55

330000

... More
Item;Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) andplant material.

300

756

226947

... More
Item;Transportaion of Gorund cover plants Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are 3km lead total lead 75Km 72x3.02=217.44+338.83

10000

556

55627

... More
Item;Internal transportation of planting of the ground cover

500

30

15450

... More
Item;Ground covers: Bed preparation 6? layer of soil mixture 3:1:1 ratio red soil, farmyard manure and river sand and application of fertilizers, smooth surface as per design including cost of soil mixture, filling of the soil mixture and internal transportation

500

305

152660

... More
Item;Malphigea balls

35

5000

175000

... More
Item;Tabebuea rosea

18

-

-

... More
Item;Terminalia mantaly

20

750

15000

... More
Item;Umbrella topiaries

5

10000

50000

... More
Item;Multi-Head topiaries

22

10000

220000

... More
Item;Planting of individual shrubs: Digging the pit of size 0.75x0.75x0.75m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.

400

746

298640

... More
Item;laying Gass Pavers flooring with ran door white 50.80MM thickness over a base of mud motor of 30MM thickness and pointing to Full depth of sttores with red soil and carpet grass including cost and conveyance of all meterial and logout charges

1400

48

67200

... More
Item;Laying of carpet grass and ramming

900

58

52290

... More
Item;Cost of Carpetgrass

900

135

121500

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass

900

333

300375

... More
Item;Formation of earthen mounds by using the available earth at site to the concave/convex land including water ,rolling with hand roller etc complete including the labour charges, watering charges ,hire charges of hand roller etc complete including all taxes etc

300

49

14775

... More
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer

724.8

22

16308

... More
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks

724.8

94

68450.11

... More
Item;Supply & stacking of gravel at site for the department gauge for premeasurements and it shall be composed of wellgraded course silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 micron is sieve and should have liquid limit and plasticity index not more than 6 as per standard specification no 138 of APSS. the cost including of transportation, loading,unloading,stackinag at the site including all labour charges, taxes & seiniorage chares etc. complete. Lawn area 832 Sqmtsx0..15=124.80 Grond cover & Creepers/Droopers/Grasses= (600Sqm) x1Mtr

724.8

204

148004.16

... More
Item;Supply and fixing of pre cast ACC curb with size 600mm X 375mm X 110 mm semi bated at the top in M30 grade including cost and conveyence to site and labour charges for complete for laying true to aalingment and 200Mtrs X2Sides

400

450

180000

... More
Item;Engaging of back hoe loaders (JCB,s) for clearance of sites.leveling, loading of unwanted cleared materials

50

1000

50000

... More
Item;DEVELOPMENT OF GREENERY WORK WITH LANDSCAPING AT GURIJA KUNTA LAKE,DUNDIGAL,MEDCAHL

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.