Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
526050Bid Award Id
ViewTender No
187/74/HMDA/UF/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Cost and supply of water through water tankers once in a day @ 10 Lites/per smt/ per day (sub soil moisture shall be maintained) = 207Sqmt X 10 X 28 days X 12 months = 27.82
27.82
3352
93260.99
Item;Maintenance of lawns watering of lawns @10-15 ltrs per sqmt lawn moving weeding edging and protection with manual watering
207
792
19675.52
Item;Cost of water for watering the plants through tankers of 5000 ltrs each trip capacity (5) trips per day-25000 ltrs. 20ltrs per plant. =18461X 5 X 64/25000 = 236.30
236.3
3352
792151.17
Item;Trimming once in 30 days (Rate:437.58x15%=65.63)
18461
39
87248.16
Item;Cost of water to plants through tankers for watering 5000 litrs eeach trip capacity 5 trips per day 20 litrs per plant in each watering = 23586Nos X 20 Ltr X 32days= 603.80
603.8
3352
2024124.1
Item;Protection, maintenance, watering, tending the plants upkeep of fencing and removal of unwanted growth
23586
360
1021575.7
Item;2 nd Soil working 10cms deep sing crowbars to a radius of 50 cms around the plant
23586
413
97609.25
Item;2 nd year Circular weeding without application of fertilizers to a radius of 50 cms around the plant
23586
137
32537.36
Item;1st Soil working 10cms deep sing crowbars to a radius of 50 cms around the plant
23586
413
97609.25
Item;1st year Circular weeding without application of fertilizers to a radius of 50 cms around the plant
23586
137
32537.36
Item;Application of chemicals and fertilises 1 dose
64200
251
161745.48
Item;Cost and chemicals & fertilisers @20gms/pit/dose (2 dose)
64200
-
64200
Item;2nd YEAR MAINTENANCE OF AVENUE PLANTATION AND INDIVIDUAL SHRUB PLANTATION
-
-
-
Item;2nd soil working 10cms deep using crowbars to a radius of 50cms aroundthe plant
40614
413
168078.6
Item;2nd Circular weeding without application of fertilizers to a radius of 50cms around the plant
40614
137
56027.83
Item;1st soil working 10cms deep using crowbars to a radius of 50cms aroundthe plant
40614
413
168078.6
Item;1st Circular weeding without application of fertilizers to a radius of 50cms around the plant
40614
137
56027.83
Item;Maintenance of Avenue Plantation: Cost of water for watering the plants through tankers of 5000 liters each trip capacity (5 trips perday-25000) No. of Plants = 40614x20x48/25000 = 1559.57days
1559.58
3352
5228171.99
Item;Cost of water for watering the plants through tankers of 5000 ltrs each trip capacity (5) trips per day-25000 ltrs. 48131 x 5 x15 x/25000 = 12 months 1732.71
1732.72
3352
5808583.85
Item;Indiviual Planting Trimming once in 15 days. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly) Formation of basins for each and every plant upto 1ft away from the plant.Application of fertilizers, insecticides, fungicides @ 20 grms/pit/sqmt etc., (with manual watering).
48131
380
2198816.6
Item;Cost of water for watering the plants through tankers of 5000 ltrs each trip capacity (5) trips per day-25000 ltrs. 20ltrs per plant. 9077.5x5x28 /25000 x 12 =610.01days
610.01
3352
2044929.82
Item;Central Median Maintenance of Hedge/Shrub PlantingTrimming once in 15 days. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly) Formation of basins for each and every plant upto 1ft away from the plant. Application of fertilizers, insecticides, fungicides @ 20 grms/pit/sqmt etc., (with manual watering).
9077.5
2930
3192509.55
Item;MAINTENANCE OF GREENARY CENTRAL MEDIAN PLANTATION) and 1st nd 2nd YEAR MAINTENANCE OF AVENUE PLANTATION AND INDIVIDUAL SHRUB PLANTATION) FROM INDIAN OIL FILLING STATION TO NELLUTLA 75.4 KM TO 86 KM NH 163 STRETCH NO 3 (10.60KM)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements