Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
526049Bid Award Id
ViewTender No
187/73/HMDA/UF/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Cost of water to plants through tankers for watering 5000 litrs eeach trip capacity 5 trips per day 20 litrs per plant in each watering = 21951Nos X 20 Ltr X 32days=561.95
561.95
3352
1883810.23
Item;Protection, maintenance, watering, tending the plants upkeep of fencing and removal of unwanted growth
21951
360
950759.27
Item;2 nd Soil working 10cms deep sing crowbars to a radius of 50 cms around the plant
21951
413
90842.9
Item;2 nd year Circular weeding without application of fertilizers to a radius of 50 cms around the plant
21951
137
30281.84
Item;1st Soil working 10cms deep sing crowbars to a radius of 50 cms around the plant
21951
413
90842.9
Item;1st year Circular weeding without application of fertilizers to a radius of 50 cms around the plant
21951
137
30281.84
Item;Application of chemicals and fertilises 1 dose
50130
251
126297.52
Item;Cost and chemicals & fertilisers @20gms/pit/dose (2 dose)
50130
-
50130
Item;2nd soil working 10cms deep using crowbars to a radius of 50cms aroundthe plant
28179
413
116617.1
Item;2nd Circular weeding without application of fertilizers to a radius of 50cms around the plant
28179
137
38873.49
Item;1st soil working 10cms deep using crowbars to a radius of 50cms aroundthe plant
28179
413
116617.1
Item;1st Circular weeding without application of fertilizers to a radius of 50cms around the plant
28179
137
38873.49
Item;Cost of water for watering the plants through tankers of 5000 liters each trip capacity (5 trips perday-25000) No. of Plants = 28179x20x48/25000 =1082.07days
1082.07
3352
3627435.33
Item;Cost and supply of water through water tankers once in a day @ 10 Lites/per smt/ per day (sub soil moisture shall be maintained) = 110 Sqmt X 10 X 28 days X 1 Mo = 1.23 daysX 12 Months
14.78
3352
49546.99
Item;Maintenance of Lawns: i) Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) ii) Lawn mowing and edging of the lawns iii) Edging of the lawns in a such a way that the lawn grass iv) Keeping the lawns always in lush green & weed-free condition
110
825
10891.32
Item;Cost of water for watering the plants through tankers of 5000 ltrs each trip capacity (5) trips per day-25000 ltrs. 50749 x 5 x15 x/25000 = 12 months 1826.96
1826.96
3352
6124531.42
Item;Indiviual PlantingTrimming once in 15 days.Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly)Formation of basins for each and every plant upto 1ft away from the plant. Application of fertilizers, insecticides, fungicides @ 20 grms/pit/sqmt etc., (with manual watering).
50749
380
2318417.32
Item;Cost of water for watering the plants through tankers of 5000 ltrs each trip capacity (5) trips per day-25000 ltrs. 20ltrs per plant. 9912.41x5x28 /25000 x 12 =666.11days
666.11
3352
2233013.8
Item;Central Median Maintenance of Hedge/Shrub Planting 1. Trimming once in 15 days. Watering once in a day@ 5 litrs/per/sqm/perday (sub soil mointure shall be maintained continuosly) Formation of basins for each and every plant upto 1ft away from the plant. Application of fertilizers, insecticides, fungicides @ 20 grms/pit/sqmt etc., (with manual watering).
9912.41
2930
3486143.05
Item;MAINTENANCE OF GREENARY CENTRAL MEDIAN PLANTATION) and 1st nd 2nd YEAR MAINTENANCE OF AVENUE PLANTATION AND INDIVIDUAL SHRUB PLANTATION) FROM SAMART CITY TO INDIAN OIL FILLING STATION 64.6KM TO 75.4 KM NH 163 DURING THE YEAR 2024 to 2025 STRETCH NO 2 (11.00 KM)
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements