Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Opening Date13 Jul 2024
Closing Date20 Jul 2024
Tender Amount₹ 53,45,876 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Laying of carpet grass and ramming

1500

58

87150

... More
Item;Cost of carpet grass

1500

135

202500

... More
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labor charges etc complete but excluding the cost of fertilizers, chemicals and grass 300 Rmt x 5m = 1500 sqmt

1500

333

500625

... More
Item;Internal transport of bag plants to planting site for 8"X 15" Bag plants

28800

332

95762.88

... More
Item;Cost, transport and fixing of support sticks for tall plants

1500

28

42000

... More
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmentaal vehicles are not provided. For 8"x15" Bag plants

28800

682

196617.6

... More
Item;Digging of 0.45x0.45x0.45 cm pit & filling with soil mixture of Red soil and Farmyard mannure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals @ 20grms/pit/Sqmt & internal transportation of plants and planting the plants (excluding the cost of the fertilizers and chemicals@20grms/pit/Sqmt. (3mx3m espacemt)

4900

194

950943

... More
Item;Digging of 0.60x0.60x0.60cm pit & filling with soil mixture of Red soil and Farmyard mannure, sand at 3:1:1 ratio including internal transport, application of fertilizers and chemicals @ 20grms/pit/Sqmt & internal transportation of plants and planting the plants (excluding the cost of the fertilizers and chemicals@20grms/pit/Sqmt. (3mx3m espacemt)

1350

385

520641

... More
Item;Hedge/Shrub Planting Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@ 20 gms/pit/sqmt) complete but excluding the cost of the fertilizers 1x2 1600 Rmt x 0.6 = 1920 sqmt

1850

756

1399506.5

... More
Item;Clearence of un-wanted jungle growth (Bushes, shrubs etc., whever necessary) 1x1 1600 Rmt x 12m = 19200 sqmt

18900

56

10652.04

... More
Item;Supplying and fixing of AAC brick kerbs with 100mm thick, 600mm long and 300mm width including cost and conveyance to site and labour charges for laying true to alignment and pointing with CM(1:3) prop etc complete 1x2 1600 rmt = 3200 Rmt

3000

225

676500

... More
Item;DEVELOPEMT OF GREENERY WORK AT SURARAM LAKE

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.