Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
511603Bid Award Id
ViewTender No
187/6/ORR/UF/HMDA/2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Cost and fixing of supporing stakes Plumeria Pudica
16000
12
201600
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not(Sports School Nurserie) provided.from Nursery site total lead 25 kms upto 3km lead 545.19 above lead 22 kms x10.58= 542.19+232.76 (8"x12")
16000
774
123992
Item;Planting of individual shrub: Digging the pit of size 0.45x0.45x0.45 m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
16000
194
3105120
Item;Maintenance of Lawns: Watering of the lawns @10-15 Liters/Sqmt/day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) Lawn mowing and edging of the lawns in the following frequency Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Keeping the lawns always in lush green & weed-free condition Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
800
924
44357.28
Item;Maintenance of Individual shrubs: Trimming of shrubs once in 15 days Watering to shrubs once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months) 42 + 514 + 3437 + 46 = 4039 Nos Lanco pots 30 Rectangle pots 12
250
444
13324.2
Item;Maintenance of Hedge/Shrub Planting: Trimming of hedges once in 15 days Watering to hedges once in a day @ 5 litres / per sqmt / per day (sub soil moisture shall be maintained continuously) Formation of basins for each and every plant upto 1 ft away from the plant Application of fertilizers, insecticides, fungicides etc a) with manual watering (for 6 months)
1400
2930
492372.72
Item;Cost of Topiry/Plams
250
2000
500000
Item;cost of Hedge plants
14000
35
490000
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading where-ever departmental vehicleOver and above 3km lead add following rates per kms are not provided lead 22km
14000
404
56666.4
Item;Individual Shrubs Planting: Topiary / Palms / Garden tree planting ? Digging of 75x75x75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20 gms/pit/sqmt)) Plams=20Nos Topiry=20
250
746
186650
Item;Hedge / shrub planting: Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) andplant material
1400
756
1059086
Item;Laying of carpet grass and ramming
800
58
46480
Item;Cost of carpet grass
800
135
108000
Item;Dressing the surface to the desired shape, laying 6? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller, including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass
800
333
267000
Item;Carting of debris and unwanted boulders and vegetation from site including loading and unloading etc complete = 1500 Sqmt X 0.30 = 600 Cum
300
174
52440
Item;Engaging of Men and Women mazdoor for removal of unwanted vegetation, plastic materials Basic rate: 520/- + 20% Municipal limits on labour component
50
520
26000
Item;Engaging of JCB on hire charges including fuel and driver batha as per the direction of the departmental authority
20
850
17000
Item;for Development of Greenery, Soft landscape work at Bongulur to Thukkuguda during the year 2023-24
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements