Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532029Bid Award Id
ViewTender No
627/3/PII/Avenue/UF/H/2024-25Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Item;Maintenance of Hedge 1. Trimming of hedges once in 15 days2.Watering to hedges once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously)3.Formation of basins from 1 ft away to Hedge 4.Application of fertilizers, insecticides, fungicides etc
2000
4103
984745.44
Item;Maintenance of lawns:Watering of the lawns @ 10-15 liters/sqmt / day basing on the season and weather conditions (sub soil moisture shall be maintained continuously) II ) Lawn mowing and edging of the lawns in the following frequenty June to November - once in 15 days December to May - once in 30 days III) Edging of the lawns in a such a way that the lawn grass should not penetrate into the plants and in a defined perfect geometric shapes or smooth curves Application of fertilizers, insecticides, fungicides etc with manual watering
2500
924
277233.6
Item;Terminalia Mentalin 21"X21"
2244
1400
3141600
Item;Pogada 18"18"
1000
200
200000
Item;Putranjeeva Roxburghi 18"X18"
80
250
20000
Item;Bahunia 18"X18"
40
200
8000
Item;Lantana Purple & white with 8"X8" Bag size
1400
35
49000
Item;Lagerstroemia Thai white, pink, Red with 13"X13" Bag size
75
230
17250
Item;Ixora Kerala White & Red with 13"X13" Bag size
75
150
11250
Item;Evolvulus glomeratus with 8"X10" Bag size
400
40
16000
Item;Spiderlilly Blue with 8"X10" Bag size
1000
40
40000
Item;Daniella Grass with 8"X8" Bag size
1000
35
35000
Item;Costus white & Varigated with 8"X10" Bag size
1000
60
60000
Item;Neerium White with 8"X8" Bag size
1000
50
50000
Item;Cost of carpet grass
2500
216
540000
Item;Charges for Board
1
12000
12000
Item;Cost of the Stakes
520
28
14560
Item;Benches
50
6500
325000
Item;Preparation of Shabad stone pathway with Bed preparation and laying of shabad stone, pointing with carpet lawn including the cost of material and laying and labour charges etc complete
500
408
204000
Item;Ground Cover Bed preparation: Dressing the surface to the desired shape, laying 4? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals and grass.
70
244
17132.64
Item;Topiary / Palms / Garden tree planting ? Digging of 0.75x0.75x0.75 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
200
895
179184
Item;Topiary / Palms / Garden tree planting ? Digging of 0.60x0.60x0.60 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
200
462
92558.4
Item;Individual Shrubs:? Digging of 0.60x0.60x0.45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
80
413
33107.52
Item;Individual Shrubs:? Digging of 0.45x0.45x0.45 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
40
232
9315.36
Item;Individual Shrubs:? Digging of 0.30x0.30x0.30 cm pit, filling with soil mixture of red soil, farmyard manure at 4:1 ratio including internal transport, application of fertilizers and chemicals (@ 20 gms/pit/sqmt), internal transportation of plants and planting the plants (excluding cost of plant material, fertilizers and chemicals (@ 20gms/pit/sqmt))
150
155
23362.2
Item;Hedge / shrub planting: Digging the trench of size 45 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) and plant material
2000
1143
2287272
Item;Laying / Tarfing of coarpet and shade grass
2500
69
174300
Item;LAWN :Bed preparation : Dressing the surface to the desired shape, laying 6 ? layer of fine red soil, covered with a thin layer of sand, watering, rolling with hand roller (2.5? thickness after rolling), including the cost of red earth, sand and labour charges etc complete but excluding the cost of fertilizers, chemicals & grass.
2500
267
667500
Item;Charges for Pre Cost CC Kerb with 600X375X100 and Labour charges for Completing for alignment and pointing with CM (1:3) Pro approved rate
220
531
116872.8
Item;Carting of Debries including excavation, loading, unloading and transport up to 10 Km
1200
164
197280
Item;Development of Park at HMDA Layout Jalpally
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements