Hyderabad Metropolitan Development Authority Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Housekeeping Services
Opening Date4 Apr 2022
Closing Date11 Apr 2022
Tender Amount₹ 3,92,83,548 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Watering the Potted plants through tankers for watering 5000lts capacity (5 trips per day @ 10lts/alternate Day plant 241*15*10/25000=1.45x2 months=2.90 days

2.9

-

9721

... More
Item;Maintenance of Lanco Pots Kandlakoya toll plaza - 34 nos,shameerpet toll plaza - 34, Keesera rotaries - 72 Potts Medchal ramp road=+34+34+72+101=241 Noi's

-

-

-

... More
Item;Maintenance of ground covers: Watering @ 10 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be maintained continuously) The watering shall be carried out DAILY during non rainy days, weeding, trimming and keeping the ground cover in healthy condition With Manual watering Keesera Rotary -I & II- 1426.85+1426.85=2853.7 Sqmt Tab builiding- 72 sqmt Total = 2925.57 Sqmt

2925.57

-

54070

... More
Item;with Manual watering

-

-

324470

... More
Item;Maintenance of Individual shrus : a) Trimming once in 15 days b) Watering once in a day 5 lts per plant per day sub soil moistue shall be maintened conenuesly the watering shall be carried out daily during non-rainy days c) Formation of basins each and every plant upto 1 feet away from the plant d) Application of fertilizers and pesticides etc. with mannual watering 1)Keesera Rotary - I & II Shrubs- 40 No's 2) Hedge plantation along central median keera - 175 No's 3) Neerium plants at keesera orr bridge side half ring both sides ORR - 380 No's 4) Landscape in tab buldling keesera - 225 no's 5)Ghatkesar interchange-4959 no's 6)Ghatkesar vup-96 no's 7) Keesera interchange -213 no's Total -6088 No's

6088

-

-

... More
Item;with Manual watering

-

-

111667

... More
Item;Maintenance of lawns: (i) watering the lawns 10-15 lts sqm day basing on the season and weather conditions ( Sub soil moisture shall be maintened continusely) (ii) Lawn mowing and edging of the lawns in the following freequency (iii) Edging of the lawns in such away that the lawn grass should not penetrate into plants and in a defind perfect geameatric shapes or smooth cruves (iv) Keeping the lawns always lush green and weed free condition (v) Application of fertilizers 1) keesera Rotary -I & II -839.96 Sqmt 2)Ghatkesar interchange -167.02 sqmt Total = 1006.98 Sqmt

1006.98

-

-

... More
Item;with Manual watering

-

-

1517362

... More
Item;1) Keesera Rotary - 1180.60Sqmt 2) Hedge plantation along central median keera - 315 Sqmt 3) Landscape in Tab at keesra - 96.83 sqmt 4)Ghatkesar VUP-247 sqmt 5)Ghatkesar-1275 sqmt 6Keesera intechange -1200 sqmt total-4314.43 sqmt

-

-

-

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously) only during non - rainy days

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

4314.43

-

-

... More
Item;Maintanance of Hedge/Shrub planting

-

-

-

... More
Item;Hedge & Tab Buliding and Rotaries:

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

21882

-

105648.48

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant

21882

-

35216.89

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant (September)

21882

-

105648.48

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

21882

-

35216.89

... More
Item;Keesera interchange -12623 no's+8500=21123 no's Ghatkesar -759 total - 21123+759=21882 no's

-

-

-

... More
Item;1st Year Maintenance

-

-

-

... More
Item;III. Interchanges, Rotaries & TAB buildings

-

-

-

... More
Item;Protection, maintenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. 12 months Rate =721.88X30%=216.56

132013

-

3430648.23

... More
Item;Protection 1styear+2nd year =109064+22949=132013 No's

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

22949

-

110802.36

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

22949

-

36934.12

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

22949

-

110802.36

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

22949

-

36934.12

... More
Item;Trimming of shrubs once in 30 days FromApril-2022 to March-2023 =12 months

65462

-

360878.91

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 22949*32*15/25000= 440.62 Days avenue plants 65462*5*64/25000 =837.91 days for shrubs Total= 1278.53 Days

1278.53

-

4286016.12

... More
Item;2nd year Maintenance of Avenue Plantaion on ORR (2020planting) 62-72 SR =9705, S Shrubs-39846 Nos 72-83 SR =13244, S Shrubs-25616 Nos Total - SR - 22949 No's ,Shrubs-65462 No's

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant

109064

-

526582.8

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

109064

-

175527.6

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant.

109064

-

526582.8

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50 cms around the plant.

109064

-

175527.6

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering. Avenue plants (48 waterings) 109064*20*48/25000= 4188 Days avenue plants

4188

-

14039432.4

... More
Item;1st year Maintenance of Avenue Plantaion on ORR (2021planting) RC- 62-72-29831 No's, 72-82-79233 No's Total=109064 Nos

-

-

-

... More
Item;II. Service Road, Railway Corridor etc.

-

-

-

... More
Item;Cost of Chemicals

-

-

276000

... More
Item;Tractor provision for lift the Trimming material

1

-

384000

... More
Item;ORR Main Carriage way (4 times) Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total MCW area=2.5widthx2sidesx20300 =101500 sqmts MCW shrubs 40017x(22/7)x0.30x0.30=11319 Sqmt. MCWAvenue =40596x(22/7)x0.50x0.50=31896 Sqmt. Total area=101500-11319-31896=58285 sqmts

58285

-

155620.95

... More
Item;Central Median Clearing of unwanted light Jungle growth (bushes, shrubs etc., wherever necessary) Total Cenral median area=4.50widthx20300 =91350 sqmts Individual shrubs=16643x(22/7)x0.30x0.30=4707 Sqmt. Hedge=19170 sqmts. Empty area=20300x0.30x2=12180 sqmts Total area=91350-4707-19170-12180=55293 sqmts(4 times)

55293

-

145420.59

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant

8723

-

42115.52

... More
Item;Circular weeding without application of fertlizers to a radius of 50cms around the plan

8723

-

14038.8

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2022 to March-2023 (4 Waterings) 8723x20x4/25000=27.91 Days

27.91

-

93562.69

... More
Item;61.7-72-1833 , 72-82 - 6890 Total-8723 No's

-

-

-

... More
Item;5th year Maintenane of MCW Avenue Plantation from Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;Soil working 10cms deep using crowbars to a radius of 50cms around the plant

4870

-

23512.85

... More
Item;Circular weeding without application of fertlizers to a radius of 50cms around the plan

4870

-

7837.78

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2022 to March-2023 (4 Waterings) 4870x20x4/25000=46.75 Days

15.58

-

52228.83

... More
Item;61.7-72-3500,72-82-1370 Total-4870 No's

-

-

-

... More
Item;3rd year Maintenane of MCW Avenue Plantation from Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant( January)

6666

-

32184.11

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant( December)

6666

-

10728.26

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant ( October)

6666

-

32184.11

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

6666

-

10728.26

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2022 to March-2023 (8 Waterings) 6666 x 20x8/25000=42.66 Days

42.66

-

143009.12

... More
Item;62-72-6666 No's

-

-

-

... More
Item;2nd year Maintenane of MCW Avenue Plantation from Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;2nd Soil working 10cms deep using crowbars to a radius of 50cms around the plant( January)

20337

-

98189.07

... More
Item;2nd Circular weeding without application of fertlizers to a radius of 50cms around the plant( December)

20337

-

32730.37

... More
Item;1st Soil working 10cms deep using crowbars to a radius of 50cms around the plant ( October)

20337

-

98189.07

... More
Item;1st Circular weeding without application of fertlizers to a radius of 50cms around the plant(August)

20337

-

32730.37

... More
Item;Watering the plants through tankeers for watering 5000lts capacity (5 trips per day @ 20lts/plant in each watering) April-2022 to March-2023 (6 Waterings) 20337 x 20x6/25000=97.62 Days

97.62

-

327251.53

... More
Item;62-72-Vepa-7360,72-83-Rela+Vepa=5000+5096+2881=20337 No's

-

-

-

... More
Item;1st year Maintenane of MCW Avenue Plantation from Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained) 168 x 5x28/25000=0.94x2 months =1.88 Days

1.88

-

6302.32

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

-

-

22156.85

... More
Item;with Manual watering

-

-

9847.45

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

-

-

-

... More
Item;Formation of basins 1ft away from the hedge

-

-

-

... More
Item;watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)April-2022 to March-2023 (12 Months) only during non - rainy days Ghatkesar ramp-123+45=168 Sqmt

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

168

-

-

... More
Item;Maintanance of Hedge/Shrub planting

-

-

-

... More
Item;Cost and supply of water through water tankers@10 litres/Sqm/day basing on the season and weather conditions (Sub soil moisture shall be allowed)28 days =634.80*10*28/25000=7.11*2 Months=14.22 Days

14.22

-

47669.71

... More
Item;-

-

-

12797.57

... More
Item;-

-

-

-

... More
Item;i) Watering of lawns @10-15 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be allowed) ii) Lawn moving and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm. a) June to November - once in 15 days b) December to May - once in 30 days iii) Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shapes iv) Keeping the lawns always in lush green & weed-free condition v) Application of fertilizers, insecticide, fungicides etc.

-

-

11732.5

... More
Item;Maintenance of Lawns

634.8

-

-

... More
Item;Ghatkesar interchange Toll Plaza Up ramps -Lawn-634.80 sqmt

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from (2 months) permitted only on non rainy days 75049x 5x15/25000 =225 daysx2 Months=450 Days

450

-

1508535

... More
Item;With drip Rate=144x40%=

-

-

1512987.84

... More
Item;with Manual watering

-

-

666645.26

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins for each and every plant upto 1ft away from plant

-

-

-

... More
Item;watering shrubs once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)

-

-

-

... More
Item;Trimming once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from April-2022 to March-2023 (12 Months)

75049

-

-

... More
Item;61.7- 72 =18800+16069=34869 Nos, 72-83=21217+18963=40180 Nos Total=75049 Nos

-

-

-

... More
Item;MCW Shrubs Miantenance Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;Cost and supply of water through water tankers. Once in a day @5 Litres/plants (sub soil moisture shall be maintained) 19170 x 5x28/25000=107x2 months =214 Days

214

-

717392.2

... More
Item;With Drip ( 45% rate on 372 (3) item No. I,III, IV

-

-

2528254.62

... More
Item;with Manual watering

-

-

1123664.89

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.,

-

-

-

... More
Item;Formation of basins for each and every plant upto 1ft away from plant

-

-

-

... More
Item;watering hedges/shrubs once in a day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)April-2022 to March-2023 only during non - rainy days

-

-

-

... More
Item;Trimming hedges/Shrubs once in 15days

19170

-

-

... More
Item;Maintanance of Hedge/Shrub planting

-

-

-

... More
Item;61.72 =9270 Sqmt, 72-82= 9900 Sqmt Total=19170 Sqmts

-

-

-

... More
Item;Cost and supply of water through water tankers. Once Alternate day@5 Litres/plants (sub soil moisture shall be maintained)from permitted only on non rainy days 16443x 5x15/25000 = 49.32x2 Months =98.65days

98.65

-

330704.4

... More
Item;With drip

-

-

331490.88

... More
Item;with Manual watering

-

-

146059.88

... More
Item;Application of fertilizers, insecticides, fungicides @20 gms/pit/sqmt etc.

-

-

-

... More
Item;Formation of basins for each and every plant upto 1ft away from plant

-

-

-

... More
Item;watering once in alternate day @5litres/per Sqmt (sub soil moisture shall be maintained continuously)

-

-

-

... More
Item;Trimming once in 15days

-

-

-

... More
Item;Individual shrubs: Maintanance of individual shrubs flowering plants topiaryornamental bamboo, palms etc., with manual watering from

16443

-

-

... More
Item;Maintanance of Individual shrubs: April-2022 to March-2023 (12 Months)

-

-

-

... More
Item;61.7- 72 =7272 Nos, 72- 83 =9171 Nos Total=16443 Nos

-

-

-

... More
Item;ORR Central Median from Shameerpet to Ghatkesar (61.70 Km to 82 km)

-

-

-

... More
Item;Estimate for the Maintanance Greenery on ORR from Shamripet to Ghatkesar (61.7 Km to 82.0 km) from APRIL - 2022 TO MARCH -2023 (12 Months) during the year 2022-2023

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.