Hyderabad Metropolitan Development Authority Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Development Authority - HMDA Tender
Agriculture or Forestry Works
Opening Date15 May 2025
Closing Soon22 May 2025
Tender Amount₹ 41,86,419
Costs
EMD
₹ 1,05,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
596635Tender No
376/7/UF/HMDA/2025Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Item;Supply & stacking of gravel at site for the department gauge for premeasurements and it shall be composed of wellgraded course silicious grains sharp & gritty to touch and free from dirt & other deleterious matter. Further it shall not contain lumps larger than 20 mm and the finer shall not exceed 10% passing through 75 micron is sieve and should have liquid limit and plasticity index not more than 6 as per standard specification no 138 of APSS. the cost including of transportation, loading,unloading,stackinag at the site including all labour charges, taxes & seiniorage chares etc. complete. lawn area=500Sqmtsx Hedge area=480SQmts Total=480Sqmtsx0.15
147
204
30017.4
... More
Item;CLEARANCE
-
-
-
... More
Item;Protection, maitenance, watering, tending the plants, upkeep of fencing & removal of unwanted growth. 12months
1
9320
93200
... More
Item;Internal transport & application of red earth,gravel,soil mixture plantation areas parks
147
94
13882.68
... More
Item;Digging the trench of size 30 cm depth, refilling the trench with red soil including cost of red soil and farmyardmanure at 4:1 ratio, internal transportation ofplants and planting the plants including theapplication of fertilizers and pesticides etc., (@20 gms/pit/sqmt) complete but excluding thecost of the fertilizers (@ 20 gms/pit/sqmt) andplant material. =800x0.30x2sides
480
756
363115.2
... More
Item;cost of Hedge Plants(per Sqmts 20Nos)
9600
55
528000
... More
Item;Malphigea balls
35
5000
175000
... More
Item;Graval for lawn & Hedge Area
-
-
-
... More
Item;Maintenance of hedge planting: i) Trimming of hedges / shrubs once in 15 days.ii)Watering hedges / shrubs once in a day @ 5 litres/ per Sqmts / per day (sub soil moisture shall bemaintained continuously). iii) Formation of basins 1 ft. away from the hedge.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,
480
2930
140677.92
... More
Item;Transport of plants from nursery site to planting site upto a lead of 3km including loading and unloading wherever departmental vehicles are not provided from Nursery total lead 23 kms upto 10"x16" 734.93+10.58x20Km
1500
946
14197.95
... More
Item;cost of Plants
-
-
-
... More
Item;Cost of Carpetgrass
500
135
67500
... More
Item;laying Gass Pavers flooring with ran door white 50.80MM thickness over a base of mud motor of 30MM thickness and pointing to Full depth of sttores with red soil and carpet grass including cost and conveyance of all meterial and logout charges
300
48
14400
... More
Item;Multi-Head topiaries
22
10000
220000
... More
Item;Terminalia mantaly
20
750
15000
... More
Item;Planting of individual shrubs: Digging the pit of size 0.75x0.75x0.75m, refilling the pit with red soil including cost red soil and farmyard manure at 4:1 ratio, internal transportation of plants and planting the plants including the application of fertilizers and pesticides (@ 20 gms/pit/sqmt) etc., complete but excluding the cost of the fertilizers (@ 20 gms/pit/sqmt) and plant material.
1600
746
1194560
... More
Item;Umbrella topiaries
5
10000
50000
... More
Item;Engaging of back hoe loaders (JCB,s) for clearance of sites.leveling, loading of unwanted cleared materials
50
1000
50000
... More
Item;GST @ 12%
-
-
448545
... More
Item;Tabebuea rosea
18
-
-
... More
Item;Hedge planting
-
-
-
... More
Item;Maintenance of Lawns : i) Watering of lawns @10-15 litres / Sqm. / day basing on the season and weather conditions (Sub soil moisture shall be allowed)ii) Lawn moving and edging of the lawns in the following frequency. Keeping the lawn grass blade not more than 2 cm.iii) Edging of the lawns in such a way that the lawn grass do not penetrate into the plants and in a defined perfect geometric shapes or smooth curves.iv) Keeping the lawns always in lush green & weed-free condition.v) Application of fertilizers, insecticide, fungicides etc. a) With Manual watering.
500
924
46205.5
... More
Item;Maintenance of individual shrubs: i) Trimming once in 15 days.ii)Watering once in a day @ 5 litres / per plant / per day (sub soil moisture shall be maintained continuously).iii)Formation of basins for each and every plantupto 1 ft. away from the plant.iv)Application of fertilizers, insecticides,Fungicides (@ 20 gms/pit/sqmt) etc.,(a)With Manual watering
1600
444
71062.4
... More
Item;Maintenace for 12months
-
-
-
... More
Item;Laying of carpet grass and ramming
500
58
29050
... More
Item;Spreading of red soil,gravel or sand including watering and rolling with hand roller irrespective of thickness in layer
147
22
3307.5
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%