Hyderabad Metropolitan Development Authority Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Hyderabad Metropolitan Development Authority - HMDA Tender
Civil And Construction
Civil Works Others
Opening Date9 Sep 2024
Closing Date23 Sep 2024
Tender Amount₹ 1,17,49,030
Costs
EMD
₹ 1,17,500Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
543102Bid Award Id
ViewTender No
HMDA/DEV/CE/07/03/2024-25, Date:04-09-2024Tender Authority
Hyderabad Metropolitan Development Authority ViewPurchaser Address
-Website
http://https://hmda.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
BOQ;Manufacturing, Supply, Fabrication, Erection and Fixing of Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979 - - 4"x4" (102 mm x 102 mm) - 8 Gauge including Labour charges for fixing in position power charges, cost and conveyance of all materials. Including lead and lift charges, contractor profit and overhead charges etc., complete for finished item of work and as directed by the Engineer-in-charge
46696.73
134
6275106.58
... More
BOQ;Manufacturing, Supply, Mouldimg, Welding, Fabrication, Erection and Fixing of angular posts 75 X 75 X 5 mm at an espacement of 2.62 mts with patties (40x5 mm) and bending goose neck 45 angle (0.4m height) with horizontal ties with MS angles 45 X 45 X 5 mm at top of 3.0 m length and welding th hold fast, as per the drawing including Nut and bolts,including Labour charges for fabricating steel works like Compound Wall Grills including cost of welding rods,Labour charges for fixing Grills in position power charges, cost and conveyance of all materials ,allowances. Including lead and lift charges, contractor profit and overhead charges etc., complete for finished item of work and as directed by the Engineer-in-charge
5070
364
1846950.3
... More
BOQ;Random Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Hard Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing Contractors profit and Overhead charges etc., excluding Seignorage charges complete for finished item of work for foundation and basement (APSS No. 601 & 615)
162
4629
749933.64
... More
BOQ;Plain Cement Concrete (1:3:6) proportion by machine mix (cement: fine aggregate: Coarse aggregate) using 20mm and down size Hard Granite macine crushed metal from approved quarry and with minimun quantity of cemnet of 220 kg/cum including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, all operational, incidental, and labour charges such as machine mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, Contractors profit and Overhead charges etc., including lead and lift charges, contractor profit and overhead charges excluding Seignorage charges etc., complete for finished item of work and as directed by the Engineer-in-charge (APSS No. 402)
54.29
6154
334133.78
... More
BOQ;Plain Cement Concrete (1:4:8) proportion by HAND mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Granite macine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water Contractors profit and Overhead charges etc. to site, , sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying and ramming concrete in 150mm layers , finishing top surface, curing concrete, etc.,exlcuding seigniorage charges complete for finished item of work for Foundations and Flooring Bed (APSS No. 402)
14.49
4995
72382.04
... More
BOQ;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring ,sheeting, planking, strutting, lead and lifts, Contractors profit and Overhead charges etc. complete for finished item of work excluding dewatering charges etc as per SS - 20 B (APSS 308). Ordinary soils-Mechcanical Means-Upto 3 m depth. Complete for finished item of work and as directed by the Engineer-in-charge.
90.31
127
11530.78
... More
BOQ;Engaging Dozer 50 hp for levelling and jungle clearance all along the boundary of the land, complete incl cost of Hire, fuel, crew charges Contractors profit and Overhead charges etc., complete for finsihed item of work and as directed by Engineer In Charge.
288
2197
632825.28
... More
BOQ;Engaging JCB along the boundary of the land for clearance of boulders and levelling etc., Complete incl cost of diesel, driver batha, Contractors profit and Overhead charges etc., Complete for finsihed item of work and as directed by Engineer In Charge.
80
9000
720000
... More
BOQ;Engaging Hydraulic excavator of 0.9 cum bucket capacity along the boundary of the land for removal of boulders and levelling by mechanical means including Contractors profit and Overhead charges. Complete for finished item of work and as directed by the Engineer-in-charge.
144
4042
582059.52
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements