Hyderabad Metropolitan Development Authority Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metropolitan Development Authority - HMDA Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date21 Feb 2025
Closing Date7 Mar 2025
Tender Amount₹ 2,32,35,635 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item;Installation of HT Lightening Arresters with earth connection including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

1859

1859

... More
Item;L.T. Metering arrangement with CTs including cable connections and cleat arrangement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

1008

1008

... More
Item;L.T. Metering arrangement with CTs including cable connections and cleat arrangement including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

21487

21487

... More
Item;Installation of L.T.H.G. Fuse sets including connections including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

383

383

... More
Item;Installation of L.T.H.G. Fuse sets including connections including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

1241

1241

... More
Item;Erection of 11 K.V. H.G. Fuse set including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

903

903

... More
Item;Erection of 11 K.V. H.G. Fuse set including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

2329

2329

... More
Item;Construction of RCC Column type DTR Plinth of size 1'X1'X10',topslab 4'x4'x6" & beam size size 1'X1'X10',topslab 4'x4'x6" & beam size 4'X8'X8" including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

25968

25968

... More
Item;Erection of 11 KV AB Switch (200A) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

2264

2264

... More
Item;Erection of 11 KV AB Switch (200A) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Cost of Material for Shifting of TRANSFORMER along with electrical cables , panel board

1

10609

10609

... More
Item;11 KV/433 V 100 KVA CSP Distribution Transformer (Aluminium) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Labour & Transport charges for Shifting of TRANSFORMER along with electrical cables , panel board

1

8932

8932

... More
Item;Providing & Placing on Terrace (at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and overflow pipes but without fittings & base support for tanks FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1500

11

17040

... More
Item;Supply & fixing of tested NP bib taps at all levels of 12.70mm dia of Indian make first quality including cost & conveyance of all materials, labour charges for finished item of work complete for all floors including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

6

312

1874.64

... More
Item;EXTERNAL SEWERAGE: Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. a] Depth up to 0.90M including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

4

4610

18440

... More
Item;SANITARY FITTINGS:- 75 mm dia - 45 Degree Bend - UPVC/SWR Pipe fittings (Prince/Sudhakar or any ISI Brand) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

4

47

188

... More
Item;Supply,fixing of 110 mm deep PVC floor traps of self cleansing design with outlet size of 75mm diameter of approved make, including making connection with PVC soil/waste pipes using rubber gaskets and top shall be cover with removable CP strainer, including contractor profit etcetc., complete 110mm deep PVC floor traps(101.6) including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

4

194

777.12

... More
Item;Providing & fixing UPVC SWR pipes TYPE-B conforming to IS 13592:1992 including necessary specials,jointing with adhesives ,fixing vertical pipes over wooden battens including cost and conveyance of all materials at site complete for finished item of work of 110 mm Dia FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

10

603

6033

... More
Item;S& F GI pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges including contractor profit etc complete 20mm dia. dia.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

50

282

14145

... More
Item;Supply & fixing 580mm x 440mm size white virerous orissa pan with attached footrests of approved make confirming to IS 2556 (part - III) with 'P' or 'S' trap, including 10 lit. low level PVC flusihing system confirming to IS 7231 with all internal fittings, CI brackets, 32mm dia CP flush pipe, 15mm dia 450mm long PVC connerctor, 15mm dia Cp brass strop cock 300 grams of ISI make, cutting and making good the walls and floors wherever required including cost & conveyance of all material to work site, all labour charges for all operations for fixing etc., complete for finished item of work.., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

2

3853

7707.64

... More
Item;Supply, installation, testing and commissioning of C.I. non - return valve of following sizes confirming to IS: 5312 complete with rubber gasket, GI bolts, nuts, washers etc as required Makes: Audco / Kirloskar / BDK / H-Shankar / Leader/ Zolotto / Intervalve / Honeywell./ Kartar including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1

4383

4383.27

... More
Item;Supply and transportation of 20W +/10%, >/ 2000 lumens, 1200mm length LED retro tube light, housing made with alluminium anodised body, wide operating voltage with double side connection, PF=0.9, Surge protection: > 2KV, THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 6500K as desired by the department and as per IS specifications, minimum CRI=80,.etc complete with 5 years warranty with BIS Certification.LUMINAIRE MAKE: Phillips / OSRAM / Wipro / Crompton / Bajaj / Havells / Jaquar / Panasonic / Halonix / HPL / Eveready / Surya / Keselec / Arraystorm / GM / Goldmedal / Goldwyn / Fortune Arrt / Lighting Technologies. LED MAKE : PHILIPS LUMILEDS / CREE / NICHIA / OSRAM / SAMSUNG / LG LEDs.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

12

814

9779.16

... More
Item;Supply of 900 mm (36") / 1200 mm (48") / 1400 mm (56") sweep 230V, A.C 50 Hz.Ceiling fan with 3 Blades and double ball bearings with all standard accessoriesincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..and as per 9.7.2 of Sta revised data of BLD -ELEC FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

6

5300

31803.18

... More
Item;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges, including contractor profit etc etc., complete for small quarters. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1

4986

4986.7

... More
Item;Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 10kA SP MCBs as out going including internal connections and labour charges for surface / flush mounting etc., complete. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1

4007

4007.2

... More
Item;Run of Mains: Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges iincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..and as per 3.1.2 of Sta revised data of BLD -ELEC FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

180

29

5248.8

... More
Item;Supply and fixing of 16A 3pin / 6A 3pin plug socket with indicator lamp and 16Amps fuse unit and 16 Amps switch control (5 in one) on decolam sheet covered board including earth connection and all labour charges, including contractor profit etc etc., complete on wall.and as per 2.1.5 of Sta revised data of BLD -ELEC including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

6

430

2584.98

... More
Item;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges, including contractor profit etc etc., complete..and as per 2.1.4 of Sta revised data of BLD -ELEC-including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

10

175

1753.3

... More
Item;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges, including contractor profit etc etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings and as per 2.1.1 of Sta revised data of BLD -ELEC-2-1 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

40

655

26239.2

... More
Item;Supply and Fixing of 25mm dia 2.00 mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles and decolam board for switches for Light, Fan and separate plug point including all labour charges etc., complete as per 1.3.1 of Sta revised data of BLD -ELEC-1-3 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

30

108

3242.1

... More
Item;Supply and Fixing of 25mm dia 1.5mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges, including contractor profit etc etc., complete for run of mains and as per 1.3.2 of Sta revised data of BLD -ELEC-1-3 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

45

105

4738.95

... More
Item;Supply and Transportation of control panel for three phase submersible motors above 7.5 HP to 12.5 HP @ 415V 50Hz operating fitted with supply and fixing of Direct - on - Line LTLK (L&T) /BCH/ SIEMENS / ROMPTON make 0-500V Volt meter and 0-30A Ammeter, Indication lamps, selector switches, CTS, 32A TP MCB, Single phase preventor,suitable contactor to with stand low voltage pick up and high voltage resistant, with ISI marked capacitors assembled with ISI mark contactors and fitted with Legrand make ISI mark MCB etc.,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1

23291

23291.08

... More
Item;Supply and fixing of 50mm dia nominal bore Medium Class (C) GI Pipe including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

350

783

274379

... More
Item;Supply and fixing of 3 Core2.50Sqm Copper Flat Cable Flat Copper cable of ISI for Submersible Motors. Including contractor profit, overhead charges etc.,complete for finished item of work and as directed by engineer-in charge Makes : Finolex / RR Kabel / Havells / KEI / LK (L&T) / Pawancab including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

400

140

56352

... More
Item;Supply and Transportation of star rated 10 HP 20-30 Stage pumpset of Three phase ISI submersible motor pumpset suitable for 6" Bore well. Makes: Texmo / CRI / KSB / Aryenvarsha / Lubi / Falcon including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

1

82938

82938.95

... More
Item;Manufacture, Supply, Delivery and fixing of 180 mm dia 6kg/cm2 Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3 rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation , contractor profit, overhead charges anywhere in TG excluding Taxes.. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

120

798

95845.2

... More
Item;Drillimg of Bore well of 185mm dia including drilling in all types of soils and transportion and labour charges ect including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

350

500

175000

... More
Item;Providing high yield strength deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending, to required sizes and shapes placing in position with cover blocks of approved size and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and drawings including cost and conveyance of bars from approved sources to site of work, including cost and conveyance of binding wire, cover blocks and all operational, incidental, and labour charges such as cutting, bending, placing in position, tying including contractor profit etc., and Countryes & other taxes,on cost of all materials complete for finished item of work (APSS No.126) in all floors. and as per revised data BLD-CSTN-4-1 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

4.17

77684

323946.2

... More
Item;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coat Primar with Luppam finishing after thouroughky brushing the surface to remove all remains including cost and conveyance of all materials to site, Countryes & other taxes, all operational, incidental and labour charges,including contractor profit etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212). and as per revised data BLD-CSTN-12-5 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

23.4

153

3588.16

... More
Item;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, One Coat (All Colours) in with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc.including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. as per SS 912 for internal walls FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

327.1

274

89716.99

... More
Item;Painting to new walls with 2 coats of water proof cement paint of apporved brand and shade over a base coat of approved cement primer grade I making making 3 coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc. complete for finished item of work as per SS 912 for internal wallsFOR Re Construction of Staff Room, Store Room and Wash Room Facilities

406.57

261

106435.96

... More
Item;Supplying and fixing of Unplasticized Poly Vinyl Chloride (UPVC) 3 track sliding doors with mesh shutter provision ? (2-glass shutters)- 95 -Series duly manufactured using UPVC reinforced profiles(Composition of profile shall consists a minimum of 5.5 PHR of TiO2 and not more than 12 PHR of CaCo3 for every 100 parts of PVC resin) of (108 mm x 45 mm)/(95.50 mm x 60 mm) x 2.20 mm for outer frames, (75 mm x 39 mm)/(66 mm x 42 mm) x 2.20 mm for sliding door shutter frames capable of mounting single glazing system, structurally reinforced with hot dip galvanized up to 50 microns of minimum thickness of 1.2 mm prefabricated & welded through fusion welding the door sash shall be fitted with 6 mm thick clear float glass of reputed make duly fixed with Grey colour TPV Gasket for sash & Glazing bead shall be coextruded with Grey colour soft PVC. Door shall be provided with standard hardware & multi point locking system of Patio/Bent espagulate .the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/ deglazing at site etc., including cost and conveyance of all materials, accessories, labour charges for transportation, erection at site complete for finished item of work. including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

7.56

7749

58587.58

... More
Item;Supply and fixing of Salwod Door Single shutter fully panelled door of size 0.75 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) and as per revised data BLD-CSTN-11-2 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

3

10035

30107.52

... More
Item;Supply and fixing of Salwod Door double shutter fully panelled door of size 0.90 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) and as per revised data BLD-CSTN-11-2 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

2

11267

22535.44

... More
Item;Supply and fixing of Sal wood Door double shutter fully panelled door of size 1.20 x 2.1mt with frame made of well seasoned Teak Wood scantlings of size 100 x 75mm and shutter made of Teak wood side rails 100mm X 32mm, top rail 100 mmX32 mm, bottom rail 100mmX 32 mm and intermediate rails of 100mm x 32 mm and planks s - 5 no's of 25mm thick as per approved design with fixtures of 6 nos of 9" ' z" holdfasts, 300 mm long MS Iron coted aldrop-1 no, 125mm long MS iron butt hinges 6 No's, Door stoppers-2 no, 150mm long MS coated Tower bolts 3- no's MS iron coated fancy handles 150 mm -2nos with necessary screws complete including cost and conveyance of all materials and labour charges etc. complete as per specifications (APSS NO.1001 & 1002) FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

2

13337

26675.62

... More
Item;Flush Pointing to CRS Masonry in CM(1:3) Prop: including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, including contractor profit etc., complete for finished item of work. (APSS 901,906) of AP Revised data BLD -CSTN- 7-2FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

23.75

127

3016.73

... More
Item;Providing Dadooing to internal walls with digital / polished glazed full body porcelain high lighter wall tiles of size 300 x 600 mm with any type of design texture such as marble finish, wooden, bamboo, stone finishes etc., scratch less, stain free and thickness between 6-8 mm 1st quality conforming to IS:15622 - 2017, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including c., complete for finished item of work, but excluding the cost of conveyance of all materials mixing of cement mortar, laying in position, curing, lift charges,including contractor profit etc., complete for finished item of work (APSS No.701 & 707) of AP Revised data BLD -CSTN- 9-18 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

14.08

1092

15382.96

... More
Item;Flooring with 15 to 18mm thick polished shabad stones set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including labour charges for dressing of flooring stones etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

41.99

898

37713.74

... More
Item;Plastering 20 mm thick in two coats with base coat of 16 mm thick in CM (1:6) and top coat of 4 mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For External walls of AP Revised data BLD -CSTN- 8-9 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

303.35

625

189684.76

... More
Item;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing mortar, scaffolding charges, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, finishing, curing,including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. Even Surfaces of Wall for finished item of work. (APSS 901,903 & 904) For Internal walls of AP Revised data BLD -CSTN- 8-10 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

335.85

606

203646.01

... More
Item;Ornamental plastering to ceiling 12mm thick in CM (1:5) with dubara sponge finish including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, finishing, scaffolding, lift charges, including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etcincluding contractor profit ., complete for finished item of work.(APSS 901& 903 ) of AP Revised data BLD -CSTN- 6-1 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

70.72

205

14499.72

... More
Item;Providing impervious coat over RCC roof slab to required slopes with CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS No. 901 & 903). of AP Revised data BLD -CSTN- 10-25 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

53.35

677

36132.89

... More
Item;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labor charges, hire charges of T & P including Contractors profit and Overhead charges but excluding Seignorage charges excluding seignorage. complete for finished item of work and as directed by the Engineer-in-charge. . (APSS NO. 309 & 310) of AP Revised data BLD -CSTN- 2-9

92.16

45

4206.18

... More
Item;Brick Masonry in superstructure with CM (1:6) prop: using second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS No. 501 & 504) of AP Revised data BLD -CSTN- 5-4 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

62.65

8604

539086.96

... More
Item;Plain Cement Concrete corresponding to M10 grade as per IS 456 equivalent to (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete,complete for finished item of work for Bed Blocks and Hold Fasts (APSS No. 402) of AP Revised data BLD -CSTN- 2-10 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge - bed blocks. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

0.35

5720

2002.01

... More
Item;providing Vibrated reinforced cement concrete corresponding M20 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete including contractor profit etc, complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No.402 & 403) FOR SUNSHADE 0.60 M WIDE. of AP Revised data BLD -CSTN- 6-6 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

6.4

618

3959.17

... More
Item;Plain reinforced cement concrete corresponding M15 grade as per IS 456 equivalent to (1:1.5:3) prop: nominal mix (Cement: fine aggregate: coarse aggregate using 20mm size HBG (SS5) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc. to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as centering, shuttering, scaffolding, lift charges, machine mixing, laying concrete, vibrating, curing concrete,including contractor profit etc, complete but excluding cost of steel and its fabrication charges for finished item of workof work and as directed by the Engineer-in-charge. for Lintel (APSS No.402 & 403) FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

0.45

13724

6175.91

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.For Roof Slab(1:1.5:3)prop 125 mm thick FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

53.35

1478

78889.71

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,including contractor profit etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data BLD -CSTN- 3-13 including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for roof beams FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

2.7

12309

33235.27

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. BLD -CSTN- 3-13 Columns Below Ground level plinth beam FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

2.7

14303

38619.86

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. BLD -CSTN- 3-13 for colums below Ground level FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

3.8

12589

47838.96

... More
Item;RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing ,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering.of AP Revised data including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. BLD -CSTN- 3-13 For Column Footings FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

11.15

10852

121003.7

... More
Item;CRS Masonry in CM (1:6) 2nd Sort (Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) GROUND FLOOR of AP Revised data BLD -CSTN- 6-6 FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

30.32

5496

166643.87

... More
Item;RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, 50% sand +50% Rock Sand, water, etc., to site including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615) FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

35.61

4945

176091.81

... More
Item;Plain Cement concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level. nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size HBG (SS5) metal from approved quarry including cost and conveyance of all materials like cement, 50% sand+50% Rock Sand coarse aggregate, water etc. to site, including seigniorage charges, Countryes & other taxes on all materials, all operational, incidental, and labor charges such as mixing, laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Foundations and Flooring Bed (APSS No. 402) FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

17.13

4969

85126.34

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. FOR Re Construction of Staff Room, Store Room and Wash Room Facilities

131.65

131

17334.36

... More
Item;Engauging the JCB including cost of machinory hire charges and fuel charges, Driver patta and for for Dismantling of Compound wall for clearing the site including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

4

9000

36000

... More
Item;Manufacture,supply , erection of I Beam section for instalation of trally crane over the corbel beam including cost fabrication ,transportation ,loading and unloading charges and Labour charges for fabricating all structural steelworks like heavy steel works like Trusses, Stanchions, Heavy Beams and Girders including cost of welding rods, power charges, etc , including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

2292.5

180

414117.2

... More
Item;Provision for Water Measurement Board including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

1

75000

75000

... More
Item;Colouring of Name Plate10x12' with Black back ground and White letter including cost of materials and labour charges etc complete including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. .for Construction of (910 KL Capacity) Sump and Pump House

1

15000

15000

... More
Item;Supplying & fixing 602 x 602 mm CI manhole frame and cover (light weight) 30 Kgst) including cost and fixing of manhole cover including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. complte for Construction of (910 KL Capacity) Sump and Pump House

2

4118

8237.08

... More
Item;Supply of Stainless Steel pipes of grade 304 including Labour charges for Fabrication of stainless steel railing works using stainless steel welding rods including buffing, polishing, lacquer finishing, to present seamless finish including cost and convayance of all materials and labour charges , including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

35

6080

212821.35

... More
Item;Supply & Delivery of Centrifugally Cast ductile Iron K9 pressure pipes with socket spigot ends confirming to I.S.8329/2000 in Standard Working lengths of 4.5, 5.5 & 6 meter for classification K7 suitable for push-on-joint (Rubber Gasket D jointing) with cement mortar lining inside the pipe with outside zinc coating including transportation, all taxes and duties & Jointing of D.I. pipes and fittings with s/s ends and Lowering carefully into the trench and laying them true to alignment and gradient including all sundries, and jointing of required specials like Tees, bends, crosses with or without differential dia., as per BIS No.3114/85 and, filling with water, with a water lead upto 500 m and testing to Pressure gauage including other taxes on all materials including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for 450mm dia for Construction of (910 KL Capacity) Sump and Pump House

105

22422

2354356.2

... More
Item;Supply & Delivery of Centrifugally Cast ductile Iron K9 pressure pipes with socket spigot ends confirming to I.S.8329/2000 in Standard Working lengths of 4.5, 5.5 & 6 meter for classification K7 suitable for push-on-joint (Rubber Gasket D jointing) with cement mortar lining inside the pipe with outside zinc coating including transportation, all taxes and duties & Jointing of D.I. pipes and fittings with s/s ends and Lowering carefully into the trench and laying them true to alignment and gradient including all sundries, and jointing of required specials like Tees, bends, crosses with or without differential dia., as per BIS No.3114/85 and, filling with water, with a water lead upto 500 m and testing to Pressure gauage including other taxes on all materials including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for 300mm dia for Construction of (910 KL Capacity) Sump and Pump House

121

12573

1521451.58

... More
Item;Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/ Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including other taxes on all materials including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

66.61

77684

5174452.06

... More
Item;Supply and application of two coats of Supply of ready mixed Synthetic Enamel paintsin all shades Grade - I (IS - 13213) having VOC (Volatile Organic Compound ) content less than 30 grams/Lit. to internal kerb, pipe railing, crash barrier of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to site, sales & other taxesexcept GST, incidental, operational and all labour charges, scaffolding charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

133.83

127

17106.93

... More
Item;Supply and application of two coats of acrylic emulsion paint weather proof water-based, modified acrylic with silicon additives exterior grade having VOC (Volatile Organic Compound ) content less than 30 grams/Lit of approved brand and shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, all labour charges, scaffolding charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

383.23

228

87384.33

... More
Item;Supply and fixing of pre-painted steel casement/ open able windows base steel as per IS 513 of - 0.58 mm thick 'D quality, galvanized as per IS 277, finish painted with a polyester paint, section for outer frame of 46 x 52 mm section for shutter of 46 x 46 mm section for mullion 46 x 70 mm, and section for beading 18 x 25 mm panelled with 5 mm thick plain float glass fitted with EPDM gaskets, handle made of high radealuminium powder coated frames fixed to the concrete /masonry wall by means of selfexpanding screws including 10 mm square guard bars @ 150 mm pitch for Windows: Double shutter for sizes 2'0 x 4'0 (609.6 x 1219.2 mm ) 3'-0 x 4'-0 (914.4mm x 1219.2 mm) without mullion section including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

3.6

7540

27144

... More
Item;Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled CRCA laths, interlocked together through their entire length and jointed together at the ends by end-locks, mounted on specially designed pipe shaft of 50mm Diameter nominal bore MS B class pipe with brackets, plates, guide channels, stoppers, bottom locking plates and arrangements for inside & outside locking with push-pull operations including cost of hood cover and springs complete, painted with one coat of approved steel primer, locks, ball bearings, all accessories etc complete for finished item of work as per special Spec: 1108 iincluding Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

14.4

5217

75127.68

... More
Item;Providing impervious coat with 12mm thick double coat in CM (1:5) 8 mm thick base coat and CM (1:3) of 4mm thick top coat with dubara sponge finish including c/c of all materials like cement, sand,water etc., to site, other taxes on all materials, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, etc., including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. (APSS 1001,1003 & 1004) (CSSR) for Construction of (910 KL Capacity) Sump and Pump House

665.61

606

403606.54

... More
Item;Providing impervious coat with CM (1:3) prop. 20 mm thick (average) mixed with water proofing compound manufactured by reputed manufacturers as approved by Engineer-in-charge at 1Kg/bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, other taxes on all materials, all operational, incidental and labour charges such as mixing mortar, laying, rounding off at junctions of wall and slab, rendering smooth with thread lining, curing, lift charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. (APSS No. 901 & 903). of AP Revised data BLD -CSTN- 10-25.for Construction of (910 KL Capacity) Sump and Pump House

574.05

368

211457.06

... More
Item;Plastering with CM (1:3) 20mm thick including cost and conveyance of all material, labour charges etc., completecm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..for Construction of (910 KL Capacity) Sump and Pump House

92.48

331

30639.55

... More
Item;Construction of super stucture with brick masonary in (1:6) using Second class bricks from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, other taxes on all materials, all operational, incidental and labor charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge..for Construction of (910 KL Capacity) Sump and Pump House

69.27

8604

596046.75

... More
Item;Supply and placing of the Design Mix M-30 grade Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Top Slab on Sump for Slabs for Sump 200mm thick at 1.1M above GL for Construction of (910 KL Capacity) Sump and Pump House

15.79

11978

189159.73

... More
Item;Supply and placing of the Design Mix M-30 grade Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Top Slab on Sump for Slabs for Sump 150mm thick @ 1.15m above GL for Construction of (910 KL Capacity) Sump and Pump House

30.75

13183

405356.35

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Beams At roof level above GL 4.65 m Pump Room Roof level for Construction of (910 KL Capacity) Sump and Pump House

4.28

13298

56972.02

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Beams for Beams up to 4m below GL for Sump for Construction of (910 KL Capacity) Sump and Pump House

8.63

13081

112908.93

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seignarage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Beams for Beams beyond 4m Below GL for Construction of (910 KL Capacity) Sump and Pump House

0.3

13149

3905.54

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seigniorage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Columns For Below GL for (5.0-5.45M) for Construction of (910 KL Capacity) Sump and Pump House

0.4

13567

5494.68

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seigniorage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Columns For Below GL for Columns in Sump (4.0-5.0M) for Construction of (910 KL Capacity) Sump and Pump House

0.9

13500

12150.08

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but excluding seigniorage charges, cost of steel and its fabrication charges for finished item of work. For M-30 grade using cement qty not less than 400 Kgs of Cement per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Columns for For Below GL for Columns in Sump (0.0-4.0M) and above GL for Construction of (910 KL Capacity) Sump and Pump House

9.11

13433

122375.18

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing etc. complete but including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.. for M-30 grade using cement qty not less than 400 per Cum for Side walls for Construction of (910 KL Capacity) Sump and Pump House

225.29

13733

3094071.6

... More
Item;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm sizegraded machine crushed hard granite metal (coarse aggregate) from approved quarryincluding cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, Shuttering, laying concrete, vibrating, curing excluding seigniorage charges,etc. complete but excluding cost of steel and its fabrication charges for finished item of work. for M-30 grade using cement qty not less than 400 per Cum including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Raft Slab for Construction of (910 KL Capacity) Sump and Pump House

219.42

11918

2615181.41

... More
Item;Plain Cement concrete (1:3:6) using 40 mm gauge HG metal including cost & conveyance of all materials and labour charges ,using concret mixer etc including cost and conveyance of all materials like cement, 50% Sand +50% Rock sand of Concrete coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, centering ,Shuttering Curing and including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

47.09

5618

264584.65

... More
Item;Dewatering from excavated pit with 5 HP Pump Set (Diesel ) including hire charges of Pump Set cost of fuels and labour charges, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

480

351

168840

... More
Item;Carting away unuseful excavated Soils and excavated materilas at site including loading and unloading transportation , (lead upto 7 km) away from the work spot, including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge.for Construction of (910 KL Capacity) Sump and Pump House

2118.59

107

228384.11

... More
Item;Earthwork in excavation for structures in Hard Rock With Blasting prohibited - as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. Up to 3.0M depth for Construction of (910 KL Capacity) Sump and Pump House

423.72

2375

1006529.87

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. beyond 3.0M depth for Construction of (910 KL Capacity) Sump and Pump House

861.33

150

129612.76

... More
Item;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH Up to 3.0M depth including Contractors profit and Overhead charges but excluding Seignorage charges. complete for finished item of work and as directed by the Engineer-in-charge. for Construction of (910 KL Capacity) Sump and Pump House

833.54

131

109752.74



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.