For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Metro Rail Limited - HMRL Tender

Works
Civil And Construction
Opening Date3 Aug 2024
Closing Date19 Aug 2024
Tender Amount₹ 12,70,698 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Maintenance;Proving Mild Steel MS Tubes & pipes of all Diameters as per IS-1161 by cutting and fabricating to required sizes, placing in position as per approved designs and drawings to be supplied at the time of execution of work, including cost and conveyance of all Mild steel plate and all wastages such as overlaps, couplings, welded joints, etc., and all operational, incidental, Labour charges for fabricating steel works in position etc. complete for finished item of work.

1157.42

185

214481.5

... More
Maintenance;Disposal/carting of excavated surplus earth available at site with a lead of 10 KM including transporting ,loading and unloading (by manual means including idle charges of trucks) charges etc.,complete as directed by Engineer-in-charge.

178.49

290

51797.8

... More
Maintenance;Supply and fixing of precast CC bollards of size of 1000mm tall 200mm diameter natural moulded with M20 grade of concrete for barrication including labour charges, cost and conveyance of all materials etc.,

76

2547

193572

... More
Maintenance;Supplying and fixing Hot dipped Galvanized Iron Chain link mesh 8 gauge - (4.0 mm) as per IS: 2721-1979: 2"x2" (50 mm x 50 mm) - 8 Gauge including cost and conveyance and complete item of work.

73.29

685

50210.98

... More
Maintenance;Supplying and spreading of HBG stone chips 2.36m & below including cost and conveyance of all material complete item of work.

8.71

1057

9212.65

... More
Maintenance;Supply, laying & fixing of 60 mm thick cement concrete pavers of grade M-35 and above including labour charges, loading & unloading, laying to desired lines and levels complete including cost of cement, sand (24mm), water, electricity, diversion of traffic etc as per drawing and technical specification clause 1504 MRD etc., in complete for finished item as directed by the Engineer-in-charge.

87.06

926

80700.27

... More
Maintenance;Flooring with Shahabad / Tandur Rough Stone slabs of all sizes between 25 mm - 30 mm thickness set over base coat of cement mortar (1 : 8) 12 mm thick over CC bed already laid or RCC roof slab, including pointing with cement mortar 1:3 duly filling joints nearly, including cost of all materials like flooring stone, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

16.92

939

15903.62

... More
Maintenance;Flooring with High strenth cement concrete terazzo / prepolished chequered step tiles as approved by the Engineer in Charge with edge rounded or grooved confirming to IS13801 with 25mm thick laid on cement mortar (1:6) 12mm thick over CC bed already laid or RCC roof slab including neat cement slurry of honey like consistency spread at 3.3 kgs per sqm & jointed with neat cement to full depth mixed with pigment of matching shade including cost of all materials like cement sand water and tiles etc., of size 300x300, 300x200, 200x200 as directed by the Engineer-in-Charge complete for finished item of work.

316.54

1220

386387.72

... More
Maintenance;Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundation levelling courses and below flooring beds using 20mm size (SS5) hard Granite metal upto Plinth level from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, excluding seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in foundations ramming in 15 cm layers finishing top surface to the required level curing etc., complete for finished item of work. (APSS No. 402) for:-Hand Mix-PCC (1:4:8) NOMINAL MIX (For Base Corse Below Tiles)

19.49

5872

114445.28

... More
Maintenance;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work per SS 20B (ApSS 308) in Ordinary Soil-Manual Means-Upto 3M depth

16.96

479

8128.25

... More
Maintenance;Fixing of pre cast kerb stones carefully true to alignment and gradient jointing the kerbs with cement joints including curing the cost of materials., i.e., cement mortar (1:3) as specified, seignorage charges all taxes and labour charges for mixing complete for finished item of work.

33.75

60

2025

... More
Maintenance;Supply & delivery of precast Cement Concrete Blocks of size 600 x 110 x 400mm of half batter kerb stone of approved design for kerbing made of M20 grade concrete using rubberized mouldes, including cost and conveyance of all materials, labour charges etc complete for kerbing, for finished item of work.

33.75

346

11694.38

... More
Maintenance;Dismantling of Flat stones/tiles/Paver blocks in roof or floors inclusive of cost and conveyance of all men and machinery involved etc complete .

355.04

27

9681.94

... More
Maintenance;Cutting open CC road surface including stacking of excvated materials & etc., complete for paver work (PH Item 25(b))

9.87

2664

26296.34



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.