Hyderabad Growth Corridor Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Growth Corridor Limited - HGCL Tender

Works
Opening Date13 Sep 2024
Closing Date27 Sep 2024
Tender Amount₹ 24,13,554 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of Hooters (Audible Alarms): The audible alarm system switches on at the beginning of the pedestrian green phase and switches off at the end of the pedestrian green phase. The alarm shall ring continuously during the green phase and shall ring intermittently for 5 seconds before switching off. The sound level of the alarm shall be higher than the ambient noise level including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

26

1873

48698

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & laying of Unarmoured 3 Core (1.00 sq. mm) Copper Cable with ISI make including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

460

85

39100

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & laying of Unarmoured 8 Core (0.50 sq. mm) Copper Cable with ISI make including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

720

168

120960

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & laying of Unarmoured 12 Core (0.50 sq. mm) Copper Cable (in Mtrs) including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

2090

234

489060

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of RGB Module Graphical Countdown Timers of 8" high digit fixed in MS Enclosure including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

4

21360

85440

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Shifting and installation of countdown timers - includes cable disconnection, removal, cleaning, shifting to another location within distance of 30 km, connection of cables, and erection on new/another pole, complete till putting on operation including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

11

655

7205

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of 300mm Dia LED Pedestrian Aspect with Retrofit with Green Pedestrian Image including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

20

7012

140240

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of 300mm Dia LED Pedestrian Aspect with Retrofit with Red Pedestrian Image including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

20

6648

132960

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of 300mm Dia LED Green Arrow Aspect with Retrofit including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

26

6861

178386

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of 300mm Dia LED Amber Aspect with provision for blinking with Retrofit including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

8

6464

51712

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply & fixing of 300mm Dia LED Red Aspect with Retrofit for Signal poles including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

8

6464

51712

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Shifting and intallation of traffic/pedestrian signal lights - includes cable disconnection, removal, cleaning, shifting to another location within distance of 30 km, connection of cables, and erection on new/ another pole, complete till putting on operation including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

163

350

57050

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Painting of Standard Poles - includes cleaning, removal of unnecessary items on the pole and painting with one coat of metal primer and two coats of enamel including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

1

2725

2725

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Shifting and intallation of 6m long standard pole includes cutting of pole to below ground level leaving no dangerous protrusions onto the road that can damage the road users welding of 1.05 mtrs of Class B MS tubular pole of 100mm dia along with bottom plate of 200×200×10mm base plate shifting to another location within distance of 30 km and grouting in pit with MS concrete as per Clauses 13.1 and 13.2 of IRC93 1985 including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

1

8585

8585

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply and intallation of Standard Poles for Pedestrian Signal, 6 mtrs high, 100mm dia, with 4.5 mm thickness, M.S Tubular pipe, Base Plate: 200mmx200mmx10mm thick welded to the bottom of Signal Pole, Paint: Pole painted with two coats of primer and in addition bituminous painting for other bottom 1.5 mtr portion of pole. Paint colour Viola Blue/Yellow Semi Glossy MRF Polyurethane paint Vapour process and grouting in pit with MS concrete as per Clauses 13.1 and 13.2 of IRC93 1985 including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

26

14164

368264

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Painting of Cantilever Poles - includes cleaning, removal of unnecessary items on the pole and painting with one coat of metal primer and two coats of enamel including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

11

3238

35618

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Shifting and intallation of 9m cantilever pole includes cutting of pole to below ground level leaving no dangerous protrusions onto the road that can damage the road users welding of 1.80mtrs of Class B MS tubular pole of 125mm dia along with bottom plate of 400×400×10mm base plate shifting to another location within distance of 30 km and grouting in pit with MS concrete as per Clause 13.5 of IRC93 1985 including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

11

16684

183524

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply and intallation of Cantilever Signal poles (9 Mtrs high with overhang of 3.5meters, 4.5mm thickness, Inner Dia: 125mmx100mmx75mm Material: MS Tubular Pipe, Base Plate: 400mmx400mmx10mm thick welded to the bottom of Signal Pole, Paint: Pole painted with two coats of primer and in addition bituminous painting for other bottom 1.5M portion of pole. Paint colour Viola Blue/Yellow Semi Glossy MRF Polyurethane paint Vapour process and grouting in pit with MS concrete as per Clauses 13.1 and 13.2 of IRC93 1985 including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

1

41416

41416

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Supply and Installation of 300 Watts Solar Powered Unit supported by 150 AH Battery and 875VA Sinewave UPS Systems of approved brand with necessary cable along with battery with minimum 4 hours Backup and solar power as primary source including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

3

64333

192999

... More
Relocation of Non functional traffic signal systems at unimortant junctions to important junctions;Shifting of existing traffic signal controller - includes moving of the controller within a distance of 30 km, erection of controller on cement base/MS Angular frame and connection of cables including cost of loading, unloading trnasportaion and labour etc., complete as directed by Engineer in charge

3

14160

42480



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.