Hyderabad Growth Corridor Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Growth Corridor Limited - HGCL Tender

Civil And Construction
Opening Date7 Jul 2022
Closing Date18 Jul 2022
Tender Amount₹ 1,39,00,000 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Provision for RCC central finial as per standard specifications

1

-

2000

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;b. For Overflow 200 mm Dia DI-K7

3

-

5661

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;a. For Inlet Pipe 300 mm Dia DI-K7

3

-

9718

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;CENTRIFUGALLY CAST (SPUN) DUCTILE IRON PRESSURE PIPES FOR WATER, GAS AND SEWAGE WITH SOCKET SPIGOT ENDS CONFORMING TO I.S.: 8329/2000 IN STANDARD WORKING LENGTHS OF 4, 5 5.5 & 6 METER FOR CLASSIFICATION K9/K7 SUITABLE FOR PUSH-ON-JOINT (RUBBER GASKET D JOINTING) WITH WITH OUTSIDE ZINC COATING. RATES ARE EX-FACTORY, CEMENT MORTAR LINING INSIDE THE PIPES EXCLUDING TRANSPORTATION, TAXES & DUTIES.

-

-

-

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Provision of Sluice at inlet including cost of valve chamber and laying in position and jointing etc.. Complete.

1

-

150000

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of H.D.-35 with 560mm dia clear opening. manhole covers and frames with ISI marking anywhere in T.S., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable

1

-

3149

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded

8.5

-

852679

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;RCM facia 5cm thick in CM (1:3) for drop walls, fins with rabbit wire mesh & nominal reinforcement as directed by Engineer-in-charge with dubara sponge finishing, including cost & conveyance of all materials to site, seigniorage charges, sales & other taxes on all materials, operational & incidental, cost and conveyance of cement, wire mesh, water to work site, centering, scaffolding and form work, lift charges etc., complete for finished items of work but excluding cost of steel & its fabrication charges, for finished item of work. (APSS No.403 & 903)

30.68

-

83136

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Painting Walls with Snowcem or other equal and approved Water Proof Cement Paint over Priming Coat, 2 Coats (All Colours)

123.48

-

20179

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Plastering with CM 2 coats, 12 mm thick, base coat in CM (1:5), 8mm thick and top coat in CM (1:3), 4mm thick with sponze finishing.

418.43

-

175812

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;e. Dome

12.03

-

280347

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;d. Top ring beam

2.54

-

44382

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;c. Haunch portion

0.37

-

7346

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;b. Side wall 150 mm Thick

19.07

-

463290

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;a. Floor slab

36.13

-

567303

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Supply and placing of the Design Mix Concrete corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402)with minimum cement content as per IS code from standard suppliers approved by the department including pumping, centering, shuttering, laying concrete, vibrating, curing etc. complete but excluding cost of steel and its fabrication charges for finished item of work.

-

-

-

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Plain Cement Concrete (1:4:8) using 40 mm metal with concrete mixture. All work upto plinth level.

14.65

-

67743

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Filling Sand in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD & 304 MORTH

14.65

-

4367

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;b. 2m -3 m Depth

109.36

-

26063

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;a. For sump foundation. Up to 2m Depth

195.29

-

46542

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

-

-

-

... More
Design and Construction of 500 KL Over Head Service Reservoir OHSR and 250 KL Under Ground Sump;Design & Construction of Over Head Service Reservior(OHSR) of 50,00,000 its capacity within 20.00 mts stagging with Raft foundation using RCC M30 grade in the site selected by the department as per drawing nos: 1 to 6 including earth work excavation in all kinds of oils in wet or dry conditions for foundations and including cost materials fixures, verticals, values, labour and testing the reservior for ater tightness etc., complete for finished item ofhte work including all taxes, providing and fixing all accessories as mentioned below including giving water tightness test (Technical Specification No. 21 and 29), Electromagnetic bulk flow meter etc., complete for finished item of work and an ditected by enfineer in charge.

-

-

11000000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.