Hyderabad Growth Corridor Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Growth Corridor Limited - HGCL Tender

Works
Civil And Construction
Opening Date9 Jul 2024
Closing Date22 Jul 2024
Tender Amount₹ 4,65,16,245 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and Fixing MS Rolling Shutter (1.2 x 2.7m) for Pump Room including Labour , Transport including all charges etc., complete for finished item of work and as directed by Engineer in charge.

1

13000

13000

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Painting to new walls ( total 3 coats) of approved shade in 2 coats & 1 coat of priming on New plastered surface including cost and conveyance of all materials to site , labour charges ans as per approed design and as directed by Engineer in charge as per Specification 1701 MORTH in all respects.

92.6

151

14033.53

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and laying in position Plain cement concrete grade M-15 Nominal mix in plinth portection and kerbs using 20mm metal using concrete mixer excluding centering and shuttering complete in all respects.

2

7749

15498.7

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:6) proportion and top coat of 4mm thick in Cm (1:4) proportion with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc. to site including seigniorage charges sales & other taxes on all materials and all operational , incidental charge son materials and including cost of all labour charges for mixing mortar, finishing ,scaffolding , lift charges, curing including cutting grooves as directed by engnieer etc complete for external & Even faces of CRS wall and RCC Exposed faces for finshed item of work

84

511

42999.6

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) proportion and top coat of 4mm thick in CM (1:4) proportion with dubara sponge finsihing with fine rendering including Rabbit wire mesh, water proof Compound, cost and conveyance of all materials like cement sand water etc., to site including seigniorage charges, sales and other taxes on all materials and all opetational incidental charges on materials and including cost of all labour chages for mixing mortar, finishing, scafolding, lift charges curing including cutting grooves as directed by engineer in charge etc. complete for internal & uneven surfaces of CRS wall for finshed item of work.

57

545

31104.9

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Brick masonry work in Cement Mortar 1:3 proportion with bricks traditional size 23x11x7 2nd class complete excluding pointing and plastering as per drawing and technical specifications

12.42

8320

103341.85

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing HYSD/ Mild steel bars HYSD ( FE 415/ FE 500 grade as per IS 1786-1985) of different diameters for RCC work including labour charges for straightening , cutting , bending to required sizes and shapes , placing position with cover blocks of approved materials and size and lap splicing with binding wire of 18 SWG, forming grills for reinforcemtnt work as per approved designs and drawings including cost and conveyance of steel bars incluidng all wastages such as overlaps , couplings, chairs , spacer bars including cost and conveyance of binding wire, cover blocks and all incidental ,operational , labour charges such as cutting, bending , palcing postion, tying including sales and other taxes on all materialas etc, complete for finished item of work for all floors.

1700

78

133195

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;R.C.C. grade M20 using concrete mixer (nominal mix) using 20mm graded metal Providing concrete for plain/reinforced concrete in open foundations using 40mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH

13.74

6671

91665.04

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;RR Masonry in Cement Mortar (1:6) proportion including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones etc., complete for finished item of work as per MORT&H specification and as directed by the Engineer-in-Charge for Foundations.

6.08

5345

32475.74

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing PCC grade M10 concrete for plain/reinforced concrete in open foundations using 40mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH

3.31

5350

17729.88

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earthwork in excavation by mechanical means for structures as per drawing and techincal specifications clause 305.1 including setting out, construction of shoring and braciing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 MORD / 304 MORTH (with all Lift and Lead Charges)

25.98

126

3290.37

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of Pump Room

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing Revetment with Rough Stone (HBG) of not less than 225 mm size grouted with 0.20 cum of stone spalls including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones for revetment etc., complete for finished item of work as per MoRT&H specification 2504 ( 4th revision ) and as directed by the Engineer-in-Charge for revetment. (with all Lift and Lead Charges)

3200

1418

4539840

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Painting to new walls ( total 3 coats) of approved shade in 2 coats & 1 coat of priming on New plastered surface including cost and conveyance of all materials to site , labour charges ans as per approed design and as directed by Engineer in charge as per Specification 1701 MORTH in all respects.

1980

151

300069

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Plastering in CM(1:3) proportion 12mm thick Single coat including cost and conveyance of all materials, seigniorage charges, labour charges, curing etc complete for finished item of work as directed by the Engineer - in -charge

1980

158

313434

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;S& F 32 mm Nominal Bore GI pipe light Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges complete etc including lead nad lift charges as directed by Engineer in charge

7600

493

3747560

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Brick masonry work in Cement Mortar 1:3 proportion with bricks traditional size 23x11x7 2nd class complete excluding pointing and plastering as per drawing and technical specifications

495

8320

4118697

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Pointing to CRS Masonry with Cement Mortar(1:3) including cost, seigniorage charges and conveyance of materials to site and including labour charges etc., complete for finished item of work as per MORT&H specification and as directed by the Engineer-in-Charge.

4560

117

533976

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;CRS Masonry in Cement Mortar (1:4) proportion 2nd sort including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones etc., complete for finished item of work as per MORT&H specification and as directed by the Engineer-in-Charge

1140

5405

6162327

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;RR Masonry in Cement Mortar (1:6) including cost, seigniorage charges and conveyance of materials to site and including labour charges for packing the stones etc., complete for finished item of work as per MORT&H specification and as directed by the Engineer-in-Charge for Foundations.

912

5345

4875369.6

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing PCC grade M10 concrete for plain/reinforced concrete in open foundations using 40mm nominal size graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH

1120

5350

5992896

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of embankment with approved gravel obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 10km as per Technical Specification Clause 301.5 MORD / 305 MORTH (with all Lift and Lead Charges)

1600

193

310160

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures - Hard rock (Requiring blasting)- Upto 3m Depth as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (with all Lift and Lead Charges)

1140

931

1061682

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures - Ordinary rock (Mechanical Means) as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (with all Lift and Lead Charges)

1140

160

182970

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earthwork in excavation by mechanical means for structures as per drawing and techincal specifications clause 305.1 including setting out, construction of shoring and braciing, removal of stumps and other deleterious material and disposal upto a lead of 50m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per technical specification 305 MORD / 304 MORTH (with all Lift and Lead Charges)

1520

126

192508

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH. (with all Lift and Lead Charges)

7600

3

30023.24

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of CRS Compound Wall for open areas

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and refilling soil around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts.

1036.8

393

408032.64

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;25 mm GI pipe

200

401

80290

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Supply, Fixing, Lowering and Jointing G.I. pipes and specials / fittings including excavation of trench of 0.5m width and 0.50 m depth in all soils except rock requiring blasting and refilling trenches after laying and jointing pipes and also including cost of jointing materials including the cost of pipes. Reference to specifications. BIS No.783/85

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;b) 150mm Dia DI-K7 Pipe

200

2343

468600

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;a) 100mm Dia DI-K7 Pipe

800

1641

1312800

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Centrifugally Cast (Spun) Ductile Iron Pressure Pipes For Water, Gas And Sewage With Socket Spigot Ends Conforming To I.S.: 8329/2000 In Standard Working Lengths of 4, 5 5.5 & 6 Meter For Classification K9 & K7 Suitable For Push-On-Joint (Rubber Gasket D Jointing) With Cement Mortar Lining Inside The Pipes With Outside Zinc Coating. Rates Are Ex-Factory, Excluding Transportation, Taxes & Duties

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation Hard Rock (blasting Prohibited ) for structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (with all Lift and Lead Charges)

129.6

2772

359341.92

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures Ordinary Rock - Mechanical Means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (with all Lift and Lead Charges)

129.6

211

27455.76

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures Ordinary Soils - Mechanical Means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (with all Lift and Lead Charges)

1036.8

161

167391.36

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Laying of Water Supply Lines

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and refilling soil around pipes including breaking clods, spreading in layers of 10 to 15 cm, watering, compaction by earth masters to achieve density control of not less than 95 percent etc., complete with lead upto 50 m and all lifts.

283.62

393

111618.18

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of additional man hole 0.100 m depth of 1.20 m (circular) internal size with cement bricks in CM 1:4 prop including cost and fixing plastic steps and fixing FRC cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all

10

1697

16970.5

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of 1.20.Mx1.20.M (circular)sewer man hole of 1.65mts depth with cement bricks in CM 1:4 prop corbellng, including CC bed (1:4:8) prop using 40 mm guage metal 0.23 m thick and CC benching / chanelling in 1:2:4 prop rock with internal plastering 20 mm thick in CM (1:3) prop and external plastering 12 mm thick in CM 1:3 with fine rendering including cost and fixing plastic steps 3 Nos and fixing FRC cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all

20

22094

441891

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of additional man hole 0.100 m depth of 0.90 m (circular) internal size with cement bricks in CM 1:4 prop including cost and fixing plastic steps and fixing FRC cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all

15

879

13192.5

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of 0.9M (circular)sewer man hole of 0.90mts depth with cement bricks in CM 1:4 prop corbellng, including CC bed (1:4:8) prob using 40 mm guage metal 0.23 m thick and CC benching / chanelling in 1:2:4 prop rock with internal plastering 20 mm thick in CM (1:3) prop and external plastering 12 mm thick in CM 1:3 prop with fine rendering including cost and fixing FC/Ci cover and frame but excluding the cost of cover and frame, including the cost and conveyance of all materials at site complete and curing for 21 days complete all

25

9134

228355

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Manufacture as per BIS:12592 (Part 1&2) Supply & Delivery of manhole covers and frames with ISI marking anywhere in A.P., F.O.R. destination including, loading, un-loading & stacking at site but excluding central excise duty, sales tax, octroi and other Govt levies etc., as applicable. with 500mm dia clear opening(MD.10 with 500mm dia)

45

2232

100464.75

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;200 mm dia SWG Pipes

160.6

1130

181477.9

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Supply, Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of Stone Ware Pipes (SWG) including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but including cost of Pipes etc.,

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;150 mm dia SWG Pipes

642.4

738

474444.8

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Supply ,Lowering and laying in ready made trench true to alignment and gradient, jointing, and testing of stone ware pipes (SWG) including cost of jointing material such as cement mortar (1:1) proportion and hemp yarn but including cost of Pipes etc.,

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation Hard Rock (blasting Prohibited ) for structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. (with all Lift and Lead Charges)

71

2772

196861.7

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures Ordinary Rock - Mechanical Means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(with all Lift and Lead Charges)

36

211

7626.6

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Earth work in excavation of foundation of structures Ordinary Soils - Mechanical Means as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.(with all Lift and Lead Charges)

243.87

161

39372.81

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Laying of UGD Lines

-

-

-

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Surveying for demarcation of plots and Roads

5

2000

10000

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Painting two coats including primer coat total 3 coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces as per specification of 1701 MORTH

321.2

151

48677.86

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 408 MORTH

880

363

319968

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing concrete for plain concrete M20 in open foundations using 20 mm nominal size Down Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

9.6

6590

63264.96

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing PCC grade M10 concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.

9.6

5350

51367.68

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of earthen shoulders/median filling with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.2 with lead upto 1000m as per technical specification clause 303 MORD/305 MORTH by using masnory.

472.8

526

248929.2

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Carting away the surplus excavated Rock from the work site with lead of 5.00 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads 1 cum

516.06

273

141245.62

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Carting away the surplus excavated earth from the work site with lead of 5.00 km beyond initial lead including loading, unloading and conveyance but excluding stacking charges etc., complete for roads 1 cum

1003.45

210

210825.58

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and laying Bituminous Concrete(Grade-I) with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

60.05

11418

685671.92

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and laying Dense Graded Bituminous Macadam (Grade - II) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.

120

10087

1210464

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and applying Tack Coat with Bitumen emulsion (RS-1) (Rapid Setting) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD.

4800

14

69360

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM).

2400

51

123120

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN / Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD / MORTH.

524

2896

1517818.4

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of Granular Sub-Base by providing well graded / Close Graded material, mixing in a mechanical mix plant at OMC, carriage of mixed material to work site upto lead of 1000 m spreading in uniform layers with motor grader on prepared surface and compacting with smooth wheel roller 80-100 kN to achieve the desired density, complete as per Technical Specification Clause 401

902.8

2467

2227523.58

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Construction of embankment with approved gravel obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 10km as per Technical Specification Clause 301.5 MORD / 305 MORTH (with all Lift and Lead Charges)

4514

256

1157841

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross-sections, loading and disposal of cut rock with all lifts and leads upto 1000 m as per Technical Specification Clause 302.3.5 MORD / 301 MORTH (with all Lift and Lead Charges)

430.05

480

206510.01

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Excavation for roadway in ordinary rock by deploying a dozer D-50 including cutting and pushing the cut earth to site of embankment upto a distance of 100 m (average lead 50 m), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross-sections with lift upto 3 m as per Technical Specification Clause 301 MORTH / 302 MORD. (with all Lift and Lead Charges)

430.05

93

39994.65

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Excavation for roadwork in soil with mechanical means including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with all lifts and lead upto 1000 m as per Technical Specification Clause 302.3 MORD / 301 MORTH (with all Lift and Lead Charges)

2006.91

80

161355.82

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Supply and fixing of demarcation stone of size 900mmx150mmx150mm duly Excavating pit of size 300mmx250mmx250mm and Numbering the Demaraction stone with synthetic enamel paint complete including all operational, incidental, labour, refilling, transportation, lead ,lift charges,seignorage charges, etc,. as per site conditions.

460

179

82501

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD / MORTH. (with all Lift and Lead Charges)

4840

3

19118

... More
Development of Infrastructure works like laying Roads, Water Supply Sewer Lines for the Sub Divide;Demarcation of Plots and Roads works

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.