Hyderabad Growth Corridor Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Hyderabad Growth Corridor Limited - HGCL Tender

Machinery and Tools
Opening Date31 May 2021
Closing Date18 Jun 2021
Tender Amount₹ 5,82,63,832 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Engaging, running and maintaining route vehicles (TATA XENON ) or equivalent of capacity of more than 2000 CC with VTS/GPS equipment, seating capacity of 5 members in the cabin & carriage space back side with staff as per scope of work, including fuel, driver, Helper and staff wages etc complete

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;1 X 30 days X 18 Months

540

-

370440

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Providing and supply of Superviors, Gangman for supervising all the works and reporting to client as per instruction of the Engineer.

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;2 No. X 10 labour X 30 days X18 Months

10800

-

7030800

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Providing and supply of Man / Women Mazdoor manpower for misc. work as and when required basis where ever required with all necessary safety jackets, shoes, helmets and cleaning equipment etc., complete and only can be done with labour as per instruction of the Engineer.

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;2 Tractors X 18 months

36

-

1152000

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Providing Tractor with trolley in running condition on hire basis including running and maintenance charges as per requirement and instructions of the Engineer including VTS/GPS equipment P.O.L., salaries of Driver and Cleaner, saftey equipement like cones, ribbons barricading etc., complete. (Rate for net working hours / day at site as per the log book/GPS Report certified by Engineer in Charge which ever applicable)

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Reach 4: Neo Polis to Patancheru (KM 5.00 to 23.70) = (18.7 KM x 8)+ (Interchanges, VUPs and Ramps) 8 KM = 157.6 KM X 5 times=788 KM = Say 800KM X 18 Months

14400

-

4766400

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Reach 3: Gachibowli to Neo Polis (KM 150.00 to 158.00 + Km 0.00 to KM 5.00) = (13 KM x 8)+ (Interchanges, VUPs and Ramps) 8 KM = 112 KM X 7 times =784 KM = Say 800KM X 18 Months

14400

-

4766400

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Operation & Maintanance of ORR Main Carriage Way both sides (LHS and RHS) and Service Roads both LSR & RSR including ramps, toll plazas, VUPs, Cleaning of expansion joints on MCW .,etc. with 2 Nos Suction of Brooming Machines with VTS/GPS equipment including its fuels, Driver, Helpers salaries, cost of consumables for maintenance of the Brooming Machine etc. and taking all precautionary ROAD SAFETY measures such as arrenging cones, Baricades, safety Jackets, flags during progress of work etc. complete for finished item of work and as per direction of Engineer in Charge

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Part B- After BOT Period (From January 2023 to June 2024)

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Reach 4: Neo Polis to Patancheru (KM 5.00 to 23.70) = (18.7 KM x 8)+ (Interchanges, VUPs and Ramps) 8 KM = 157.6 KM X 5 times=788 KM = Say 800KM X 18 Months

14400

-

4766400

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Reach 3: Gachibowli to Neo Polis (KM 150.00 to 158.00 + Km 0.00 to KM 5.00) = (13 KM x 8)+ (Interchanges, VUPs and Ramps) 8 KM = 112 KM X 7 times =784 KM = Say 800KM X 18 Months

14400

-

4766400

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Operation & Maintanance of ORR Main Carriage Way both sides (LHS and RHS) and Service Roads both LSR & RSR including ramps, toll plazas, VUPs, Cleaning of expansion joints on MCW .,etc. with 2 Nos Suction of Brooming Machines with VTS/GPS equipment including its fuels, Driver, Helpers salaries, cost of consumables for maintenance of the Brooming Machine etc. and taking all precautionary ROAD SAFETY measures such as arrenging cones, Baricades, safety Jackets, flags during progress of work etc. complete for finished item of work and as per direction of Engineer in Charge

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Part A- Upto BOT Period i.e., up to December 2022

-

-

-

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;2 No. of Vehicle suction sweeping machines

2

-

21696000

... More
Supply of Self Propelled Suction Sweeping machines including 3 years Comprehensive Operation;Supply of Self Propelled Mechanical sweeping machines of 5 to 6 Cum. dust collecting capacity (Dry & Wet) with Vacuum suction system along with (BS-VI) Including Chassis, Registration, Insurance & Transportation etc., complete for finished item of work or as directed by Engineer In charge.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.