Forest Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 2,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
491481Bid Award Id
ViewTender No
2302/2022/S10Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://forests.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. MS flats 40x5 mm
395.64
109
43152
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. 40x40x5 mm for hold fasts.
181.8
109
19830
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. ISA 65 X 65 X 6 mm vertical posts ,
3715.99
109
405303
Construction of Protection Structure (Chain link fencing);Plain Cement Concrete corresponding to 1:2:4 proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) above GL.
7.56
6348
47996
Construction of Protection Structure (Chain link fencing);Plain Cement Concrete corresponding to 1:3:6 proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) upto GL.
27.61
5265
145395
Construction of Protection Structure (Chain link fencing);Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting,planking,strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS 20B (APSS 308). (Vertical Posts 972/3 =324, Supporting posts for every 15 mt in (2) nos=2x (972/15)= 130, Total 324 + 130 = 454 nos (MS Angular posts)
27.61
225
6223
Construction of Protection Structure (Chain link fencing);Clearing of unwanted growth, grasses, bushes, shrubs, saplings and remove of dead stumps and dispose of unserviceable material upto a lead of 1000 mtrs including removal and disposal.
756
3
2646
Construction of Protection Structure (Chain link fencing);Suppply and fixing of Nuts and bolts including cost & conveyance of all materials and labour charges etc., complete
100
105
10500
Construction of Protection Structure (Chain link fencing);Supply and fixing of GI chainlink fencing of mesh size of 76x76x8 guage including Typing the chain link fencing to this MS IS T bars posts, horizontal ties and vertical struts with 2 mm GI Wire conforming to IS 2781978 and including tack welding of the chain link fencing at 300 mm - 400 mm intervel to the MS Angle of vertical posts, vertical struts and top and bottom hortizonal including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete. for finished item of work.
1134
435
494379
Construction of Protection Structure (Chain link fencing);Painting to New Iron work with two coats of ready mixed Synthetic Enamel paints in all shades Grade - I having VOC (Volatile Organic Compound) content less than 50 grams/ liter first quality all shades over red oxide primer Grade-I making three (3) coats in all to given and even shade after thourughly brushing the surface to remove all dirt and remains of loose powered materials, including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., complete for finished item of work. (APSS No. 1201, 1207 & 1212).in All Floors
138.33
173
24062
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. MS flats 40x5 mm
395.64
109
43152
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. 40x40x5 mm for hold fasts.
181.8
109
19830
Construction of Protection Structure (Chain link fencing);Supply, mouiding, Cutting of required size and length angles , welding wherever required, grinding edges fabrication, hoisting and installation all as per specification at all heights and Labour charges for fabricating all structural steel works like heavy steel works including cost of welding rods powere charges etc., complete for finished item of work. ISA 65 X 65 X 6 mm vertical posts ,
3715.99
109
405303
Construction of Protection Structure (Chain link fencing);Plain Cement Concrete corresponding to 1:2:4 proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) above GL.
7.56
6348
47996
Construction of Protection Structure (Chain link fencing);Plain Cement Concrete corresponding to 1:3:6 proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) upto GL.
27.61
5265
145395
Construction of Protection Structure (Chain link fencing);Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting,planking,strutting, etc. complete for finished item of work excluding dewatering charges etc as per SS 20B (APSS 308). (Vertical Posts 972/3 =324, Supporting posts for every 15 mt in (2) nos=2x (972/15)= 130, Total 324 + 130 = 454 nos (MS Angular posts)
27.61
225
6223
Construction of Protection Structure (Chain link fencing);Clearing of unwanted growth, grasses, bushes, shrubs, saplings and remove of dead stumps and dispose of unserviceable material upto a lead of 1000 mtrs including removal and disposal.
756
3
2646