Forest Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
₹ 5,000
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
450399Bid Award Id
ViewTender No
1353/A/2023/D1, Dt. 19.08.2023Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://forests.telangana.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Construction of RCC Watch Tower;Flooring with 25.4mm thick Polished Shabad stone of 1st. Quality of size not exceeding 0.457m X0.457m, laid over C.C. Flooring bed set over 20 mm thick C.M. (1:8) prop base coat and neat grey cement slurry of honey like consistency spread at the rate of 3.3 kgs of cement per sqm and jointed with neat cement paste, including seignourage, cost and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as mixing mortar, dressing, laying, lift charges, curring etc, complete for finished item of work as per SS., but excluding cost of C.C.bed.
39.97
542
21686
Construction of RCC Watch Tower;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)
2387.03
86
206385
Construction of RCC Watch Tower;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm, 10mm size Hard Broken Granite (IS383, 1970) Machine Crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing concrete in Concrete Mixer, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for fixing of Doors and Windows and Steps
0.24
5813
1413
Construction of RCC Watch Tower;Plastering 12mm thick in two coats with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, seigniorage charges, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., complete for finished item of work. (APSS 901,903 & 904)
495.27
436
215994
Construction of RCC Watch Tower;Impervious coat 20mm thick average over VRCC roof slabs with CM(1:3) propmixed with approved brand of water proofing compound at the rate of 1.0 Kg / 200 Ml per bag of cement and laid when the slab is green with thread lining and finishing smooth with a floting cement of neat cement as directed including cost & conveyance of materials and water to work site seigniorage and all opeartional, incidental, labour charges such as mixing mortar, laying curing etc complete for finished item of work
34.93
493
17223
Construction of RCC Watch Tower;11.5 cm wide Brick masonry for super-structure on ground floor in cm (1:3) using second class traditional size bricks including cost of all materials, seigniorage harges, labour and all operations for constructing half brick asonry, mixing cement mortar, curing etc., complete for finished item of work, but excluding conveyance charges of materials.
10.6
7792
82603
Construction of RCC Watch Tower;Brick Masonry in superstructure with CM (1:6) prop with 2nd class Bricks traditional size 23 x 11 x 7 cms, including cost and conveyance of all materials, labour charges, seiniorage charges, scaffolding and curing etc.,
28.11
7782
218777
Construction of RCC Watch Tower;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Roof Slab 100mm thick.
114.5
1486
170191
Construction of RCC Watch Tower;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams.
5.14
13898
71408
Construction of RCC Watch Tower;VRCC prop nominal mix using 6 to 20mm(SS-5) graded HBG machine crushed metal for approved quarry as per SS with necessary reinforcement including cost and conveyance of all materials like cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all materials including centering shuttering, machine mix laying concrete vibrations, curing etc complete for finished item of work but excluding cost of steel at its for finished item of work.as per SS , but excluding cost of reinforcement steel and its fabrication charges for Lintels
0.49
13774
6805
Construction of RCC Watch Tower;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth Beam.
1.11
13454
14965
Construction of RCC Watch Tower;VRCC prop nominal mix using 6 to 20mm(SS-5) graded HBG machine crushed metal for approved quarry as per SS with necessary reinforcement including cost and conveyance of all materials like cement, fine aggregate and coarse aggregate water etc to site cost at seigniorage and all materials including centering shuttering, machine mix laying concrete vibrations, curing etc complete for finished item of work but excluding cost of steel at its for finished item of work.as per SS , but excluding cost of reinforcement steel and its fabrication charges for column
3.31
12926
42813
Construction of RCC Watch Tower;Vibrated Reinforced Cement Concrete M20 Grade Nominal Mix corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) including centering, shuttering, laying concrete, vibrating, curing etc. complete for Column Footings.
2.82
9789
27621
Construction of RCC Watch Tower;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310
5.5
321
1772
Construction of RCC Watch Tower;Coursed Rubble stone masonry, in CM (1:6) prop: (Cement: Sand) using Granite stones from approved quarry including cost and conveyance of all materials like Granite stones, cement, sand, water, etc., to site including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., complete for finished item of work for foundation and basement (APSS No. 601 & 615)
7.73
4518
34943
Construction of RCC Watch Tower;Vibrated Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed
2
5022
10036
Construction of RCC Watch Tower;Vibrated Plain Cement Concrete (1:3:6) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including seigniorage charges, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed under Column Footing & CRs Walls
1.83
5364
9811
Construction of RCC Watch Tower;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, seigniorage charges, labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation
14.23
394
5612
Evaluation Notes How It Works ?
Potential Partner