Forest Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Forest Department Tender

Works
Civil And Construction
Building Construction
Opening Date5 Mar 2025
Closing Soon12 Mar 2025
Tender Amount₹ 16,48,241 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

23.26

4452

103557

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, etc., complete for finished item of work including Plate compactor/Vibrator

10.27

6280

64501

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and complete for finished item of work. (APSS No. 501 & 504).

23.02

7907

182030

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR Beam

3.7

12835

47490

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR Roof slab 125mmth

88.19

1537

135555

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR Lintel

1.07

14355

15361

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Providing reinforcement steel (HYSD/TMT) ( from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of all materials, steel bars, chairs, spacer bars, overlaps including all wastages, all incidental, operational, charges etc. complete for finished item of work.( APSS No.126)

982.69

68

66823

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and complete for finished item of work. (SS 901,903 & 904).

239.11

549

131338

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Plastering 20mm thick in two coats using screened sand with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and complete for finished item of work .(SS 901,903 & 904).

23.44

577

13534

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supplying and fabricating, erecting and fixing in Mild steel works like Railing, Window Grills, Compound Wall Grills, Iron Doors, Windows, small sheds of approved design including cost & conveyance of welding rods, power charges, all materials, labour charges for fabrication, erecting & fixing all structural steel works in position, one coat of Red oxide primer, all incidental charges etc., complete for finished item of work as directed by the Engineer-in-Charge

6459.31

115

743079

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supplying and fixing MS-Powder Coated Aldrops (IS:2681) 300 mm long (TBSC-P.IV-09).

7

192

1344

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supplying and fixing MS-Powder Coated Butt hinges (IS:205)- 150 mm Long (TBSC-P.II-12).

18

47

846

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 30 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and complete for finished item of work in all floors.

158.14

201

31810

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supply & application of one coat water based cement primer of exterior grade II and two coats of acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 30 grams/ liter for exterior walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and complete for finished item of work in all floors.

104.4

278

29120

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Painting two coats with synthetic enamel paint Grade-I VOC (Volatile Organic Compound) content less than 50 grams/litre to new iron work including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

124.53

127

15930

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Supplying, laying, jointing and testing 152.4 mm SWG SP-1 pipes of ISI make conforming to ISI 651 & 4127 with airtight cement joints in CM 1.5:1 prop. including excavation of trenches and socket pits in any soil (except rock requiring blasting) up to 914.4 mm (3'0")) depth and refilling with watering and tamping (TBSP-A.I-04).

5.48

763

4181

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry. Inspection chamber up to 914.4 mm (3'0") and fitted with light weight 457.2 mm x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg (TBSP-B.II-02).

1

4610

4610

... More
Construction of night houses (4) Nos for Malayan Sun Bear in the premises of Nehru Zoological Park,;Deduct R.R. departmental stone cost.

14.06

505

-7109



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.