Forest Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Forest Department Tender

Works
Civil And Construction
Building Construction
Opening Date5 Feb 2025
Closing Soon19 Feb 2025
Tender Amount₹ 11,54,802 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Providing reinforcement steel (HYSD/TMT) ( from Primary producer TATA, SAIL, VSP, JSW &Shyam Steel etc as per IS 1786-2008) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of all materials, steel bars, chairs, spacer bars, overlaps including all wastages, all incidental, operational, charges etc. complete for finished item of work.( APSS No.126)

1050

68

71400

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick using screened sand, mixed with integral cement water proofing liquid confirming to IS: 2645-2003 laid over roof when it is green/wall surface including cost and conveyance of all materials, all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work (APSS No. 901 & 903).

118.94

611

72679

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and complete for finished item of work. (SS 901,903 & 904).

159.8

549

87775

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:5) and top coat of 4mm thick in CM (1:3) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including , and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and complete for finished item of work. (SS 901,903 & 904).

66.22

549

36373

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR ROOF SLAB

65.46

1537

100617

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR ROOF BEAM

1.35

12835

17328

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and , centering using Steel scaffolding pipes , jack props , wallers , Foot plates , brackets , steel centering plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc., and complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). FOR LINTELS

0.32

14355

4623

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Brick masonry for panel walls in superstructure with CM (1:8) prop: (Cement : Screened sand) using common burnt clay bricks of class as per Table- I of IS:1077-1992, Non- Modular or traditional size 23 x 11 x 7 cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, screened sand, bricks, water etc., to site, including and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc.,and complete for finished item of work. (APSS No. 501 & 504).

25.98

7907

205436

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Plain Cement Concrete M 20 nominal mix using WEIGH BATCHER / MIXER, 20mm size hard granite machine crushed graded metal (coarse aggregate - as per IS 383 - 1970 and IS 2386 Part 1 to Part 8) from approved quarry, using a minimum quantity of 330 kgs. of cement per 1 cum of concrete including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site including steel centering, shuttering, machine mixing, lift charges, laying concrete,vibrating, curing, etc., complete for finished item of work including Plate compactor/Vibrator

7.91

6280

49679

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Random Rubble stone masonry in CM (1:8) prop: (Cement: Screened sand) using hard granite stones carted from approved quarry including cost and conveyance of all materials like cement, screened sand, water, stones etc., from approved quarry, to site, including labour for cutting stones to required size and shape, mixing, of cement, mortar, construction, curing etc.,and complete for finished item of work in foundation and basement. (APSS No. 601 & 615)

24.75

4452

110191

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Plain Cement Concrete (1:5:10) (cement: fine aggregate: Coarse aggregate) for foundations and under flooring bed using coarse aggregate 40mm size hard , machine crushed granite from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, and including all charges for machine mixing, laying concrete in foundations and under flooring bed, ramming in 15 cm layers finishing top surface to the required level curing etc.,and complete for finished item of work. (APSS No. 402)

2.58

5094

13145

... More
Construction of night house for Olive Baboon and Sacred Baboon in the primate area in the premises o;Earth work excavation for foundations (Mechanical Means) for buildings/structures in ordinary soils and depositing on bank for all lifts and with an initial lead of 50m and up to 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting etc., and complete for finished item of work excluding dewatering charges etc., as per SS 20 B(APSS 308).

23.21

115

2686



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.