Engineers India Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Engineers India Limited - EIL Tender

Goods
Eprocure
Opening Date20 Mar 2021
Closing Date5 Apr 2021
Tender AmountRefer Documents 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling of old exchanger including removal & restoration of associated piping, erection of the new exchangers on foundation, Assembly of shells (including welding of interconnecting nozzles), local Post weld heat treatment, NDT (Radiography / TOFD or UT as applicable), local hydrostatic test of site joint, painting, insulation etc as per the enclosed standard specifications, instructions to vendors, job specification, data sheets etc as per MR.

-

-

-

... More
{02}100-E-212A/B/C

-

-

-

... More
Unit Rates for Addition / Deletion:

-

-

-

... More
External support clips per Kg. basis : MOC SA 387Gr 11 Cl.2

-

-

-

... More
External support clips per Kg. basis : MOC SA 516 Gr 70

-

-

-

... More
External support clips per Kg. basis : MOC SA 240 Gr 316L

-

-

-

... More
Supervision for attending site related exigency as notified by Owner as per MR.

-

-

-

... More
{08}100-E-212A/B/C (For Sr. No. 01.01)

-

-

-

... More
Quoted prices for Supply are inclusive of all Mandatory/Commissioning spares, special tools & tackles etc. as applicable, as per Material Requisition.

-

-

-

... More
Bidder must quote the prices in this Price Schedule formats only. The formats shall not be changed and/or retyped. Prices Quoted in this Price Schedule Format shall only be prevail.

-

-

-

... More
The description of items and tag no. provided in this Price Schedule format is indicative only. In case, there is a discrepancy in the Tag no. /Description/ Quantities of items provided in this Price schedule format and the Tag no. /Description/ Quantities of items provided in the Material Requisition, the Tag no. /Description Quantities of items provided in the MR shall prevail.

-

-

-

... More
In case of any discrepancies in unit supply price and total supply price (arrived after multiplied by quantity), unit supply price quoted shall govern and total price shall be corrected.

-

-

-

... More
Unit Rates for addition / deletion shall not be considered for evaluation.

-

-

-

... More
Evaluation/ordering shall be carried out on Bottom-line basis considering Supply+ Transportation+Site work+Supervision. In case Freight is not quoted, same shall be considered as included in supply price. Other Terms and condition shall be as per Enquiry document.

-

-

-

... More
Quoted site work charges shall be minimum 25 % of the quoted supply prices. In case a supplier quotes site work charges lesser than 25% of supply price, the differential charges shall be retained from supply prices and shall be paid along with last 10% payment of site work charges which will be paid after completion of site work.

-

-

-

... More
Quoted price shall be inclusive of prices for raw materials sourced outside India and to be incorporated in the finished product sourced from India - Detailed break up shall be furnished in Form A1.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.