Endowments Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date16 Apr 2025
Closing Soon30 Apr 2025
Tender Amount₹ 21,20,124 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Painting to new walls 2 coats of Synthetic Polymer Plasthic Emulsion Paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for Ground Floor

111.15

1730

19238

... More
Civil Work;Plastering 12mm thick in single coat in CM (1:3) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work

22.99

1932

4443

... More
Civil Work;Providing High Yeild Strength Deformed Bars of Fe 500 Grade of different diameters including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc., complete

1.07

73338

78325

... More
Civil Work;Arches

33

400

13200

... More
Civil Work;Pushpa Pothika

6.75

1400

9450

... More
Civil Work;Pillars

126

120

15120

... More
Civil Work;Kudangai, Vyalam & Salaharm

38.55

26779

103233

... More
Civil Work;Upto Prastaram

20.1

12006

24133

... More
Civil Work;Ornamental Plastering 25mm to 40m thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine render with neat cement, cost and conveyance of all materials, labour charges, all incidental and operational charges, curing etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution.

-

-

-

... More
Civil Work;1st Storey

4.46

12249

54632

... More
Civil Work;Upto Prastaram

4.05

11935

48338

... More
Civil Work;Ornamental Brick Work in (1:5) using 2nd class well burnt bricks from approved source using bricks, bats and flat tiles including cost & conveyance of all materials like cement, sand, bricks etc., to site, seigniorage charges, importation of silpi labour, excluding scaffolding for construction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing, etc.,complete

-

-

-

... More
Civil Work;Kodangai

17.68

1317

23286

... More
Civil Work;Slab 5" thick

2.79

1325

3699

... More
Civil Work;Beam

1.41

11117

15676

... More
Civil Work;Columns

2.04

11437

23333

... More
Civil Work;Pedastals

2.72

8945

24330

... More
Civil Work;Footings

3.06

8356

25571

... More
Civil Work;VRCC Nominal mix M20 using 20mm size HBG graded chips SS-5 using necessary quantity of steel per cum of concrete including cost and conveyance of all materials and all labour charges, cutting, centering (using steel) etc., complete as per APSS No.403 with BIS 456-200 But, excluding the cost of steel and its fabrication charges

-

-

-

... More
Civil Work;Random Rubble Masonry in CM (1:8)mix, using rough stone from approved quarry including cost, seigniorage, conveyance of all materials like cement, sand, granite stone, water etc., to work site from approved sources and all labour charges, curing, centering, etc., complete for levelling course concrete

3.17

3735

11840

... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete

2.04

4139

8444

... More
Civil Work;Sand with Filling sand from approved sources in layers not exceeding 15cm thick, consolidating each deposited layers basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidental, labour charges

1.02

1240

1265

... More
Civil Work;Earth work excavation and depositing on banks with an initial lead of 10 Mts and initial lift of 2m in soils like in rock like shales, ordinary gravel, stoney earth and earth mixed with fair sized boulders etc., complete which do not require blasting etc., complete for foundations

14.27

225

3216

... More
Civil Work;ARCH GATE

-

-

-

... More
Civil Work;Above 20'-0" to 35'-0" height

840

11

9240

... More
Civil Work;Up to 20'-0" height

3160

12

37920

... More
Civil Work;Supply and Fixing of Scaffolding during execution of work including cost and conveyance of all materials such as casurina poles, bamboos bamboo mats, coir rope etc., including labour charges etc., complete

-

-

-

... More
Civil Work;Providing Stainless Steel railing 304 grade pipes as per ISI 786-1979 of different diameters for work including labour charges for straightening cuting, bending to required sizes and shapes, placing in position with approved materials and size forming grills work as per approved design and drawings including cost and conveyance and al incidental and all operational charges such as cutting, bending, placing in position, tying excluding taxes on all materials etc., complete for finished item of work

529.72

718

380339

... More
Civil Work;Supplying and fixing of Best teak wood ornamental Door shutter with two leaves as per temple standard desing including cost of frame and planks, and preparation charges and fixing door shutters in position including necessary fixtures and fittings including polishing to shape and dimensions etc., complete including cost and conveyance of all materials and labour charges etc., excluding taxes, complete door shutter with best teak wooden frame of 2" thick and best teak wooden Padmams of 2.5" thick and best Teak Wood rear plank of thickness 1.5" . (Single pamam)

31.72

2850

90395

... More
Civil Work;Fixing Charges - Above 7'-0" ht

2

3200

6400

... More
Civil Work;Palamana Dressing

111.14

505

56126

... More
Civil Work;Cost of Stone

74.25

250

18563

... More
Civil Work;Supply and fixing of Black Granite Stone Door Frame including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete

-

-

-

... More
Civil Work;Painting to new walls 2 coats of Synthetic Polymer Plasthic Emulsion Paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for Ground Floor

325.31

1730

56305

... More
Civil Work;Flooring with High Polished Shabad stone slabs of size not less than 45cmx30cm set over base coat of cement mortar (1:8) 12 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

46.48

7463

34690

... More
Civil Work;Plastering 20mm thick in single coat in CM (1:5) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work

45.91

2436

11185

... More
Civil Work;Plastering 12mm thick in single coat in CM (1:3) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work

56.02

1932

10825

... More
Civil Work;Brick Masonry in CM (1:8) propotion (Cement:Sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35Kg/ sqcm including cost & conveyance of all materials like cement, sand, bicks to site excluding seigniorage charges including sales & other taxes on all materials and such as labour chrges like mixing cement mortar, scaffolding charges, constructing masonry lift charges, curing etc. complete for finished item fo work

3.31

8453

27981

... More
Civil Work;Supply and fixing of Copper Sthoopy with Sthoopi Dandam, Brahma Randram stone (Gandhapu Raie) including cost and conveyance of all materials and labour charges etc., complete

1.06

2570

2724

... More
Civil Work;Supply and fixing of Black Granite Stone Balipeetam including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete

1

3500

3500

... More
Civil Work;Supply and fixing of Black Granite Stone Somasutram including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete

1

7000

7000

... More
Civil Work;Kudangai, Vyalam & Salaharm

46.7

26779

125058

... More
Civil Work;Pushpa Pothika

8

1400

11200

... More
Civil Work;Pillars

125.6

120

15072

... More
Civil Work;Mandapam

41.64

12006

49996

... More
Civil Work;2nd Storey

8.61

29050

25012

... More
Civil Work;1st Storey

15.48

26779

41454

... More
Civil Work;Upto Prastaram

67.38

12006

80901

... More
Civil Work;Ornamental Plastering 25mm to 40m thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine render with neat cement, cost and conveyance of all materials, labour charges, all incidental and operational charges, curing etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution.

-

-

-

... More
Civil Work;Vyalam & Salaharam

7.04

11935

84025

... More
Civil Work;Mandapam

12.1

11935

144418

... More
Civil Work;2nd Storey

1.87

12563

23493

... More
Civil Work;1st Storey

7.2

12249

88195

... More
Civil Work;Ornamental Brick Work in (1:5) using 2nd class well burnt bricks from approved source using bricks, bats and flat tiles including cost & conveyance of all materials like cement, sand, bricks etc., to site, seigniorage charges, importation of silpi labour, excluding scaffolding for construction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing, etc.,complete

-

-

-

... More
Civil Work;Random Rubble Masonry in CM (1:8)mix, using rough stone from approved quarry including cost, seigniorage, conveyance of all materials like cement, sand, granite stone, water etc., to work site from approved sources and all labour charges, curing, centering, etc., complete for levelling course concrete

5.44

3735

20319

... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete

27.3

4139

112996

... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete

1.25

4139

5174

... More
Civil Work;Sand with Filling sand from approved sources in layers not exceeding 15cm thick, consolidating each deposited layers basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidental, labour charges

1.2

1240

1489

... More
Civil Work;Earth work excavation and depositing on banks with an initial lead of 2 Mts in soils like in rock like shales, ordinary gravel, stoney earth and earth mixed with fair sized boulders etc., complete which do not require blasting etc., complete for foundations

9.57

225

2157

... More
Civil Work;RECONSTRUCTION OF TEMPLE

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.