Endowments Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Civil Works Others
Building Construction
Opening Date10 Apr 2025
Closing Date24 Apr 2025
Tender Amount₹ 35,41,011 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Supplying and fixing of teak wood temple type Door shutter with Best teak wood frame of 2" thick, Padmams of 2.5" thick and best Teak Wood rear plank of thickness 1.5" thick 2 leaves as per standard temple design including cost of frame and planks and preparation charges fixing of shutters in position, locking arrangements etc., complete. Double Padmams with padmarekulu & Plain frame

20

2850

57000

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete

1

25000

25000

... More
Civil Work;Plastering with 20mm thick double coat in CM (1:6) 8mm thick base coat and CM(1:4) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

79.09

4733

37440

... More
Civil Work;Plastering with 12mm thick double coat in CM (1:5) 8mm thick base coat and CM(1:3) of 4mm thick top coat with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

250

4553

113845

... More
Civil Work;Ornamental plastering to pillars alround

645.12

120

77414

... More
Civil Work;3rd Storey

14.17

31584

44755

... More
Civil Work;2nd Storey

24.36

29313

71407

... More
Civil Work;1st Storey

84.21

27042

227721

... More
Civil Work;Up to Prastharam

129.21

12269

158537

... More
Civil Work;Ornamental Plastering 25mm to 40mm thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;3rd Storey

2.64

12967

34235

... More
Civil Work;2nd Storey

7.6

12653

96169

... More
Civil Work;1st Storey

24.27

12339

299489

... More
Civil Work;Up to Prastharam

39.62

12025

476469

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

10

74531

745315

... More
Civil Work;Kodangai

51.66

1346

69551

... More
Civil Work;Roof Slab 125mm thick (First Floor)

45.92

1442

66248

... More
Civil Work;Roof Slab 125mm thick (Ground Floor)

64.32

1390

89468

... More
Civil Work;Roof Beam (First Floor)

9.47

12080

114398

... More
Civil Work;Roof Beam (Ground Floor)

9.47

11638

110212

... More
Civil Work;Plinth Beam

3.51

11626

40808

... More
Civil Work;Columns (First Floor)

6.36

12597

80123

... More
Civil Work;Columns (Ground Floor)

8.76

11958

104755

... More
Civil Work;Pedastals

3.62

9465

34264

... More
Civil Work;Footings

9.87

8876

87614

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

28

4209

117879

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

10.75

4606

49522

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

3.74

1240

4640

... More
Civil Work;Earth work excavation in all type of soils like BC, Redearth,Ordinary gravels etc with initial lead and lifts etc. complete for foundation

100.98

2253

22760



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.