For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date15 Apr 2025
Closing Soon29 Apr 2025
Tender Amount₹ 7,96,770 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Pushpa Pothikas

28

1400

39200

... More
Civil Work;Painting with Emulsion paint with approved Colour Cement paint Primer one coat and two coats given shade after throughly brushing the surface to remove all dust and remains of loose powder materials including Cost and conveyance of all materials to work site including taxes, finishing curing scaffolding and all operational incidental labour Charges Etc.,complete for finished item of work as per A.P.S.S.912.

139.46

1730

24138

... More
Civil Work;Supply and fixing of Brass Stoopi with Stoopidandam upto 2'-0" ht(18 to 20 guage) including cost and conveyance of all materials and labour charges etc., complete

1.83

2570

4703

... More
Civil Work;Up to 20'-0" ht

960

12

11520

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Preparation & Fixing of best Teak wood Door shutters with Best Teak wood Frame of 2" thick padmam of 2.5" thick and Best Teak wood rear Flank of thickness 1.5" Finished iteam Two leaves as per standard temple design 2 leaves as per temple design including cost of frame and flanks and preparation charges, fixing of shutters in position, locking arrangements etc., complete, padmam with padmarekulu & plain frame

18

2850

51300

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete

1

25000

25000

... More
Civil Work;Plastering in Cement Mortor in two coats 20mm thick (i.e. CM(1:5) 8mm thick and CM(1:4) 4mm thick) finished smooth including cost and conveyance of all materials like cement, sand, water etc., tos ite excluding seigniorage charges, sales and other taxes on all materials and all operational, incidetnal charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.

21.92

2241

4914

... More
Civil Work;Plastering with Cement Mortor in two coats 12mm thick, (i.e. CM(1:5) 8mm thick and CM(1:3) 4mm thick) finished smooth including cost and conveyance of all materials like cement, sand, water etc., to site excluding seigniorage charges, sales and other taxes on all materials and all operational, incidental charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.

38.16

1896

7238

... More
Civil Work;Ornamental plastering to pillars alround

128

194

24832

... More
Civil Work;Flooring with high polished shabad stones 1st quality 15mm to 18mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

19.48

7445

14503

... More
Civil Work;1st Storey

21.75

26709

58093

... More
Civil Work;Up to Prastharam

57.73

11937

68913

... More
Civil Work;Ornamental Plastering 25mm to 40mm thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;1st Storey

7.29

11727

85494

... More
Civil Work;Up to Prastharam

10.75

11413

122697

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.7

76917

53843

... More
Civil Work;Kodangai

10.66

1315

14022

... More
Civil Work;Roof Slab 125mm thick

19.48

1322

25756

... More
Civil Work;Roof Beam

1.64

11087

18184

... More
Civil Work;Plinth Beam

1.32

11075

14620

... More
Civil Work;Columns

1.02

11407

11636

... More
Civil Work;Footings

1.81

8326

15071

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

12.73

3848

48988

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

4.21

4031

16973

... More
Civil Work;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complet

5.2

446

2323

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

1.8

979

1763

... More
Civil Work;Earth work excavation in all type of soils like BC, Redearth,Ordinary gravels etc with initial lead and lifts etc. complete for foundation

28.1

225

6333



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.