Endowments Department Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 21,201Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
588863Tender No
EE/01/2025-34Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Civil Work;Painting to new walls 2 coats of Synthetic Polymer Plasthic Emulsion Paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for Ground Floor
111.15
1730
19238
... More
Civil Work;Plastering 12mm thick in single coat in CM (1:3) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work
22.99
1932
4443
... More
Civil Work;Providing High Yeild Strength Deformed Bars of Fe 500 Grade of different diameters including cost & conveyance of steel including cost of binding wire and labour charges for fabrication such as cutting, bending and cranking rods, tying grills with binding wire etc., complete
1.07
73338
78325
... More
Civil Work;Arches
33
400
13200
... More
Civil Work;Pushpa Pothika
6.75
1400
9450
... More
Civil Work;Pillars
126
120
15120
... More
Civil Work;Kudangai, Vyalam & Salaharm
38.55
26779
103233
... More
Civil Work;Upto Prastaram
20.1
12006
24133
... More
Civil Work;Ornamental Plastering 25mm to 40m thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine render with neat cement, cost and conveyance of all materials, labour charges, all incidental and operational charges, curing etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution.
-
-
-
... More
Civil Work;1st Storey
4.46
12249
54632
... More
Civil Work;Upto Prastaram
4.05
11935
48338
... More
Civil Work;Ornamental Brick Work in (1:5) using 2nd class well burnt bricks from approved source using bricks, bats and flat tiles including cost & conveyance of all materials like cement, sand, bricks etc., to site, seigniorage charges, importation of silpi labour, excluding scaffolding for construction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing, etc.,complete
-
-
-
... More
Civil Work;Kodangai
17.68
1317
23286
... More
Civil Work;Slab 5" thick
2.79
1325
3699
... More
Civil Work;Beam
1.41
11117
15676
... More
Civil Work;Columns
2.04
11437
23333
... More
Civil Work;Pedastals
2.72
8945
24330
... More
Civil Work;Footings
3.06
8356
25571
... More
Civil Work;VRCC Nominal mix M20 using 20mm size HBG graded chips SS-5 using necessary quantity of steel per cum of concrete including cost and conveyance of all materials and all labour charges, cutting, centering (using steel) etc., complete as per APSS No.403 with BIS 456-200 But, excluding the cost of steel and its fabrication charges
-
-
-
... More
Civil Work;Random Rubble Masonry in CM (1:8)mix, using rough stone from approved quarry including cost, seigniorage, conveyance of all materials like cement, sand, granite stone, water etc., to work site from approved sources and all labour charges, curing, centering, etc., complete for levelling course concrete
3.17
3735
11840
... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete
2.04
4139
8444
... More
Civil Work;Sand with Filling sand from approved sources in layers not exceeding 15cm thick, consolidating each deposited layers basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidental, labour charges
1.02
1240
1265
... More
Civil Work;Earth work excavation and depositing on banks with an initial lead of 10 Mts and initial lift of 2m in soils like in rock like shales, ordinary gravel, stoney earth and earth mixed with fair sized boulders etc., complete which do not require blasting etc., complete for foundations
14.27
225
3216
... More
Civil Work;ARCH GATE
-
-
-
... More
Civil Work;Above 20'-0" to 35'-0" height
840
11
9240
... More
Civil Work;Up to 20'-0" height
3160
12
37920
... More
Civil Work;Supply and Fixing of Scaffolding during execution of work including cost and conveyance of all materials such as casurina poles, bamboos bamboo mats, coir rope etc., including labour charges etc., complete
-
-
-
... More
Civil Work;Providing Stainless Steel railing 304 grade pipes as per ISI 786-1979 of different diameters for work including labour charges for straightening cuting, bending to required sizes and shapes, placing in position with approved materials and size forming grills work as per approved design and drawings including cost and conveyance and al incidental and all operational charges such as cutting, bending, placing in position, tying excluding taxes on all materials etc., complete for finished item of work
529.72
718
380339
... More
Civil Work;Supplying and fixing of Best teak wood ornamental Door shutter with two leaves as per temple standard desing including cost of frame and planks, and preparation charges and fixing door shutters in position including necessary fixtures and fittings including polishing to shape and dimensions etc., complete including cost and conveyance of all materials and labour charges etc., excluding taxes, complete door shutter with best teak wooden frame of 2" thick and best teak wooden Padmams of 2.5" thick and best Teak Wood rear plank of thickness 1.5" . (Single pamam)
31.72
2850
90395
... More
Civil Work;Fixing Charges - Above 7'-0" ht
2
3200
6400
... More
Civil Work;Palamana Dressing
111.14
505
56126
... More
Civil Work;Cost of Stone
74.25
250
18563
... More
Civil Work;Supply and fixing of Black Granite Stone Door Frame including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete
-
-
-
... More
Civil Work;Painting to new walls 2 coats of Synthetic Polymer Plasthic Emulsion Paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for Ground Floor
325.31
1730
56305
... More
Civil Work;Flooring with High Polished Shabad stone slabs of size not less than 45cmx30cm set over base coat of cement mortar (1:8) 12 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.
46.48
7463
34690
... More
Civil Work;Plastering 20mm thick in single coat in CM (1:5) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work
45.91
2436
11185
... More
Civil Work;Plastering 12mm thick in single coat in CM (1:3) thick with dubara sponge finishing including cost and conveyane of all materials like cement, sand, water etc., to site including sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding lift charges, curing, including cutting grooves as directed by Engineer-in-Charge and overheads & contractors profit complete for finished item of work
56.02
1932
10825
... More
Civil Work;Brick Masonry in CM (1:8) propotion (Cement:Sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35Kg/ sqcm including cost & conveyance of all materials like cement, sand, bicks to site excluding seigniorage charges including sales & other taxes on all materials and such as labour chrges like mixing cement mortar, scaffolding charges, constructing masonry lift charges, curing etc. complete for finished item fo work
3.31
8453
27981
... More
Civil Work;Supply and fixing of Copper Sthoopy with Sthoopi Dandam, Brahma Randram stone (Gandhapu Raie) including cost and conveyance of all materials and labour charges etc., complete
1.06
2570
2724
... More
Civil Work;Supply and fixing of Black Granite Stone Balipeetam including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete
1
3500
3500
... More
Civil Work;Supply and fixing of Black Granite Stone Somasutram including fine dressing and polishing to the shape and dimensions as perthe approved drawing including cost and conveyance of all materials and labour charges etc., complete
1
7000
7000
... More
Civil Work;Kudangai, Vyalam & Salaharm
46.7
26779
125058
... More
Civil Work;Pushpa Pothika
8
1400
11200
... More
Civil Work;Pillars
125.6
120
15072
... More
Civil Work;Mandapam
41.64
12006
49996
... More
Civil Work;2nd Storey
8.61
29050
25012
... More
Civil Work;1st Storey
15.48
26779
41454
... More
Civil Work;Upto Prastaram
67.38
12006
80901
... More
Civil Work;Ornamental Plastering 25mm to 40m thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation including fine render with neat cement, cost and conveyance of all materials, labour charges, all incidental and operational charges, curing etc., complete for finished item of work in site for external surface as per approved drawings and as directed during execution.
-
-
-
... More
Civil Work;Vyalam & Salaharam
7.04
11935
84025
... More
Civil Work;Mandapam
12.1
11935
144418
... More
Civil Work;2nd Storey
1.87
12563
23493
... More
Civil Work;1st Storey
7.2
12249
88195
... More
Civil Work;Ornamental Brick Work in (1:5) using 2nd class well burnt bricks from approved source using bricks, bats and flat tiles including cost & conveyance of all materials like cement, sand, bricks etc., to site, seigniorage charges, importation of silpi labour, excluding scaffolding for construction of masonry but including lift charges and soaking the bricks in clean water atleast an hour immediately before use, curing, etc.,complete
-
-
-
... More
Civil Work;Random Rubble Masonry in CM (1:8)mix, using rough stone from approved quarry including cost, seigniorage, conveyance of all materials like cement, sand, granite stone, water etc., to work site from approved sources and all labour charges, curing, centering, etc., complete for levelling course concrete
5.44
3735
20319
... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete
27.3
4139
112996
... More
Civil Work;Plain Cement Concrete (1:4:8)proportion using 40mm size HBG Metal from approved quarry including cost, seigniorage, conveyance of all material from approved source and all labour charges, curing, centering, etc., complete for leveling course concrete
1.25
4139
5174
... More
Civil Work;Sand with Filling sand from approved sources in layers not exceeding 15cm thick, consolidating each deposited layers basement with Sand with watering and ramming with heavy rammers including all water leads, including charges for all operations, incidental, labour charges
1.2
1240
1489
... More
Civil Work;Earth work excavation and depositing on banks with an initial lead of 2 Mts in soils like in rock like shales, ordinary gravel, stoney earth and earth mixed with fair sized boulders etc., complete which do not require blasting etc., complete for foundations
9.57
225
2157
... More
Civil Work;RECONSTRUCTION OF TEMPLE
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%