Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Opening Date1 Oct 2024
Closing Date15 Oct 2024
Tender Amount₹ 33,61,303 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

1.58

27358

4323

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

0.72

534

385

... More
Civil Work;Impervious coat with CM(1:3) mix, 20mm thick dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

1.58

5174

818

... More
Civil Work;Vimanam 1st Storey

4.88

27327

13336

... More
Civil Work;Up to Prastharam

8.55

12554

10734

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;Vimanam 1st Storey

0.33

12675

4183

... More
Civil Work;Upapeetam

1.58

12361

19531

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

18.67

4213

78668

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.02

74531

1640

... More
Civil Work;Roof Slab 5mm thick

1.58

1366

2159

... More
Civil Work;Lintel beam

0.03

11926

358

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;P.C.C. (1:2:4) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

4.25

5133

21819

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.13

74531

9459

... More
Civil Work;Grounting of holes with cement slurry including cost and conveyans of all materials and labour charges etc, complete for finished item of work

18.29

148

2722

... More
Civil Work;Dilling of hole with pneumatic compressor of 36mm dia including cost and conveyans of all materials and labour charges etc, complete for finished item of work

18.29

178

3263

... More
Civil Work;Renovation of Garudalayam

-

-

-

... More
Civil Work;Supplying and fixing of SS railing including cost and conveyance of all materials and labour charges etc complete.

60.96

3000

182880

... More
Civil Work;Flooring with supply of Non-Skid red or white full body Ceramic floor tiles of size 300x300mm and thickness between 7-8mm 1st quality confirmng to IS 3711, IS 13712, IS:13630 (Part 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar(1:8),12 mm thick over CC bed already laid or RCC roof slab

120.77

7834

94619

... More
Civil Work;Plastering in Cement Mortor in SINGLE coats 20mm thick (16mm+4mm) in CM (1:6) finished smooth including cost and conveyance of all materials like cement, sand, water etc., tos ite excluding seigniorage charges, sales and other taxes on all materials and all operational, incidetnal charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.

141.91

2756

39111

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

16.64

4468

74357

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

42.48

534

22714

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

25.49

4213

107405

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete for ordinary soil- Manual Means upto 3 m depth for foundation - open excavation

16.99

225

3829

... More
Civil Work;Providing Ramp

-

-

-

... More
Civil Work;Painting to new walls with 2 coats of synthetic polymer plastic emulsion paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for walls

352

1730

60925

... More
Civil Work;Up to 20'-0" ht

1440

12

17280

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

56.69

27358

155095

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

147.27

534

78745

... More
Civil Work;Impervious coat with CM(1:3) mix, 20mm thick dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

48.31

5174

24998

... More
Civil Work;Supply and fixing of MS Iron Welded grills with approved design and drawing including cost and conveyance of all materials and labour charges etc., complete

1638

125

204799

... More
Civil Work;Plastering withCM 12mm thick single coat in CM (1:3)4mm thick) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

112.04

2160

24210

... More
Civil Work;Plastering withCM 20mm thick single coat in CM (1:5)16mm thick and CM(1:4)4mm thick) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

107.74

2756

29694

... More
Civil Work;Celling padmam

19.64

400

7857

... More
Civil Work;Provoding Makharathoranam

202.02

400

80808

... More
Civil Work;Providing Pushpa Pothikas

37.5

1400

52500

... More
Civil Work;Ornamentation to columns

420

233

97860

... More
Civil Work;Vyalam

38.32

27327

104717

... More
Civil Work;Salaharam

34.28

27327

93677

... More
Civil Work;Up to Prastharam

18.27

12554

22938

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.

1.49

8743

13028

... More
Civil Work;Upapeetam walll

3.21

12361

39681

... More
Civil Work;Vyalam on Mandapam

8.94

12675

113320

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:6) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

23.79

4213

100242

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

3.49

74531

259817

... More
Civil Work;Kodangai

31.09

1335

41518

... More
Civil Work;Roof Slab 125mm thick

48.31

1366

66027

... More
Civil Work;Roof Beam

4.81

11443

55045

... More
Civil Work;Plinth Beam

4.25

11764

49998

... More
Civil Work;Plinth Beam

2.49

11432

28466

... More
Civil Work;Footings

16.99

8682

147519

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;P.C.C. (1:2:4) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

3.91

5133

20074

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

1.19

74531

88663

... More
Civil Work;Grounting of holes with cement slurry including cost and conveyans of all materials and labour charges etc, complete for finished item of work

131.67

148

19598

... More
Civil Work;Dilling of hole with pneumatic compressor of 36mm dia including cost and conveyans of all materials and labour charges etc, complete for finished item of work

131.67

178

23487

... More
Civil Work;Renovation of Mandapam

-

-

-

... More
Civil Work;Painting to new walls with 2 coats of synthetic polymer plastic emulsion paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for walls

66.53

1730

11515

... More
Civil Work;Above 20 feet height

360

11

3960

... More
Civil Work;Up to 20'-0" ht

1600

12

19200

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Supply and fixing of Metal Stoopy with sthoopi dandam, brahma randram stone (Gandhapu- Raie) including cost and conveyance of all materials and labour charges etc., complete

1.39

2570

3572

... More
Civil Work;Preparation and fixing of best teak wood/non teak wood ornamental door shuters with tw leaves as pet standard temple design including cost of frame and planks and preparation charges.(i.e. Door shutter with best teak wood frame of 2: thick padmams position locking arrangements etc complete. (5.101) single padmam

10

2850

28500

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

8.85

27358

24212

... More
Civil Work;Vimanam 2nd Storey

21.1

29598

62452

... More
Civil Work;Vimanam 1st Storey

45.43

27327

124147

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;Vimanam 2nd Storey

4.65

12989

60401

... More
Civil Work;Vimanam 1st Storey

15.63

12675

198119

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.