Endowments Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 8,804Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
532720Tender No
EE/04/2024-3Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Civil Work;Up to 20'-0" ht
2140
12
25680
... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete
-
-
-
... More
Civil Work;Supplying fixing of Teak Wood temple type door shutters with 2 leaves as per stnderd temple design including cost o frame and fkanks and preparation charges fixing of shluttersl in position, locking arrangement etc., complete, padmam with (single padmam) and conveyance of all materials and labourcharges etc.,
10.86
2850
30951
... More
Civil Work;Labour Charges
25
32
800
... More
Civil Work;Dressing
25
479
11975
... More
Civil Work;Cost of Stone
8.25
200
1649
... More
Civil Work;Flooring with hard Granite stones , including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.
-
-
-
... More
Civil Work;Flooring with Polished Shabad Stones thick slabs other than black and regular colours set Over base of cement mortar (1:8) 20mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials. (Mirror polished of all shades)
18.05
750
13543
... More
Civil Work;Supply and fixing of Granite stone door frame of requiredsize and shaper as per plan including cost and conveyance of stone, dressing charges and fixing charges etc., complete
1
25000
25000
... More
Civil Work;Plastering to brick masonry with 20mm thick single coat in CM (1:5) with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
37.98
226
8616
... More
Civil Work;Plastering to celling with 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
31.82
191
6096
... More
Civil Work;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complet
7.08
381
2700
... More
Civil Work;Brick Masonry in CM (1:8) with 2nd class bricks treaditional size 23 x 11x 7 cms as per table-I of IS:1077-1992 Non-Modular or traditional size 23 x 11x7 cm, having compressive strength not less than 35kg/cm2,including cost & conveyance of all materials and labour charges. Centering & scafolding charges. Constructing
2.24
8120
18190
... More
Civil Work;Ceiling Padmam
4.91
310
1522
... More
Civil Work;Pushpa Pothikas
8
1400
11200
... More
Civil Work;Pillars
112
194
21728
... More
Civil Work;1st Storey
39.74
26755
106326
... More
Civil Work;Upto Prastharam
45.63
11983
54679
... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete
-
-
-
... More
Civil Work;1st Storey
6.61
11849
78325
... More
Civil Work;Upto Prastharam
10.67
11535
123084
... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, with traditional bricks size 23X11X7 cms using 2nd class bricks from approved source having minimum crushing strength of 35 kg/cm2, including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes
-
-
-
... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 415/Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors
0.71
80496
57152
... More
Civil Work;Lintels
0.11
12123
1334
... More
Civil Work;Kodangai
13.71
1346
18460
... More
Civil Work;Roof Slab 125mm thick
20.74
1391
28857
... More
Civil Work;Roof Beam
1.32
11640
15366
... More
Civil Work;Plinth Beam
3.23
11629
37562
... More
Civil Work;Columns
1.19
11961
14234
... More
Civil Work;Pedastals
0.91
9468
8616
... More
Civil Work;Footings
1.81
8879
16072
... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work
-
-
-
... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement
19.37
3658
70870
... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work
4.58
4590
21024
... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
8.72
1101
9604
... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
33.28
225
7501
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements