For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 36,568Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
587743Tender No
EE/01/2025-30Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Civil Work;Supply and fixing of Metal Stoopy with sthoopi dandam, brahma randram stone (Gandhapu- Raie) including cost and conveyance of all materials and labour charges etc., complete(copper)
2.16
3885
8392
... More
Civil Work;Above 20 feet height
840
11
9240
... More
Civil Work;Up to 20'-0" ht
3900
12
46800
... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete
-
-
-
... More
Civil Work;Supplying and fixing of Best Teak Wooden Ornamental door shutters with two leaves as per temple standard deign including cost of frame and planks and preparation charges fixing of door shutter in posiion including necessary fixtures andfittings including polishing to the shape and dimensions etc., complete including cost and conveyance of all materials and labour charges etc., excluding taxes complete Door Shutter with bEST tEAK wOODEN FRAME OF 2" thick and Dest teak wooden padmams of 2.5" thick and Best Teak Wooden rear flank of thickness of 1.5" thick.(Double Padmam)
19.75
2850
56288
... More
Civil Work;Supply and fixing of black granite stone including fine dressing charges and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials complete somasuthrams nalam type (ordinary) and labour charges etc., complete but excluding seigniorage charges and taxes etc., complete
1
7000
7000
... More
Civil Work;Fixing Charges
1
1600
1600
... More
Civil Work;Dressing
34.5
505
17423
... More
Civil Work;Cost of Stone
18.13
250
4532
... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)
-
-
-
... More
Civil Work;Pushpa Pothikas
30
1400
42000
... More
Civil Work;Ornamental plastering to pillars
627
194
121638
... More
Civil Work;Arches
245
400
98000
... More
Civil Work;Padmams 5 feet Dia
47.14
310
14613
... More
Civil Work;2nd floor
9.06
29261
26511
... More
Civil Work;Second Floor
15.97
29261
46731
... More
Civil Work;First Floor
27.38
26990
73901
... More
Civil Work;Up to Prastharam
68.95
12218
84247
... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete
-
9133
-
... More
Civil Work;Third Floor
1.74
13067
22738
... More
Civil Work;Second Floor
7.12
13067
93042
... More
Civil Work;First Floor
23.26
12753
296652
... More
Civil Work;Up to Prastharam
39.54
12439
491870
... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes
-
-
-
... More
Civil Work;Acco proof plastering in CM (1:3) 20 mm thick with 1 kg of water proof compound/ bag of cement laid over roof when it is in green including cost and conveyance of all materials to site, cost of, all taxes, finishing, curing, scaffolding and all operational, incidental, labour charges, etc., including cutting grooves where ever necessary etc., complete for finished item of work.
96.25
4973
47871
... More
Civil Work;Salaharam Back
40.09
2756
11050
... More
Civil Work;Plastering to Cement Motor in single coats 20mm thick finish smooth including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
41.9
2546
10668
... More
Civil Work;Plastering to Cement Motor with 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
199.89
2017
40324
... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors
4
84075
336301
... More
Civil Work;Kodangai
49.39
1368
67569
... More
Civil Work;Roof Slab 125" thick
114.29
1439
164500
... More
Civil Work;Roof Beam
7.22
12024
86818
... More
Civil Work;Lintle Beams
0.1
12507
1251
... More
Civil Work;Plinth Beam
3.85
12012
46250
... More
Civil Work;Columns
7.24
12344
89377
... More
Civil Work;Pedastals
2.72
9851
26797
... More
Civil Work;Footings
7.02
9263
65029
... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work
-
-
-
... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.
3.31
8846
29283
... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement
83.25
4419
367964
... More
Civil Work;C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work
20.72
5016
103942
... More
Civil Work;Supply and Filling of gravel(excluding rock) in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complet
78.08
469
36638
... More
Civil Work;Supply and Filling of Sand(excluding rock) in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
27.51
1240
34127
... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
140.82
225
31739
Evaluation Notes How It Works ?