Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date4 Feb 2025
Closing Soon10 Feb 2025
Tender Amount₹ 82,78,737 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Pilgrims shed;Roofing will be provided with 1.00 mm thick galvanized / prepainted GI profied sheets fixed to the purlins with 14 size self drilling screws with neoprene washer, side laps are stitched withself tapping/drilling screws end laps are to be sealed with 25x3 mm butyl tape. the sheets are provided with anti capilary groove.

886.01

1391

1232856

... More
Pilgrims shed;Providing Nutbolts for fitting the purlins to trusses including cost and conveyance of all materials an labour charges etc. Complete, including jointing and fixing in position etc.

168

60

10080

... More
Pilgrims shed;Providing cleat patty (152.4mmx63.5x6mm)

25.28

124

3159

... More
Pilgrims shed;Fitting and fixing of 3" length 5/8" size bolts the vertical pole to base plate at top and bottom including cost and conveyance of all materials and labour charges etc complete.

56

100

5600

... More
Pilgrims shed;Supplying and fixing of the base plates at top and bottom of the vertical pole for connecting to base pipe and trusses at top including cost and conveyance of all materials and labour charges etc complete.240x240x10 mm

216

124

26996

... More
Pilgrims shed;2"x2" dia Square pipes

1605.69

124

200679

... More
Pilgrims shed;1 1/2 " dia inclined Verticle pipes 3.20mm thick

183.54

124

22939

... More
Pilgrims shed;2" dia inclined Verticle pipes 3.20mm thick

415.93

124

51983

... More
Pilgrims shed;4" dia Horizontal pipes

5250.16

124

65616

... More
Pilgrims shed;Providing MS Pipe trusses using MS Pipes including cost and connveyance of all materials and labour charges including welding jointing and fixing in position etc complete.

-

-

-

... More
Pilgrims shed;Flooring with high polished granite slabs 16 mm to 20 mm thick width of 2.43m set over base coat of cement mortar (1:8) 20 mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including near cement slurry of honey like consistency spread @ 3.30 kgs per sqm. Jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., complete, including seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stones etc., complete for finished item of work, but excluding the cost of conveyance of all materials.

747.68

27451

2052458

... More
Pilgrims shed;Plastering in Cement Mortor in two coats 20mm thick (16mm+4mm) thick (i.e. CM(1:6) 16mm thick and CM(1:4) 4mm thick) finished smooth including cost and conveyance of all materials like cement, sand, water etc., tos ite excluding seigniorage charges, sales and other taxes on all materials and all operational, incidetnal charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.

42.71

4761

20337

... More
Pilgrims shed;Plastering with Cement Mortor in two coats 12mm thick (8mm +4mm) thick, (i.e. CM(1:5) 8mm thick and CM(1:3) 4mm thick) finished smooth including cost and conveyance of all materials like cement, sand, water etc., to site excluding seigniorage charges, sales and other taxes on all materials and all operational, incidental charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.

327.49

4640

151957

... More
Pilgrims shed;Brick Masonry in CM (1:6) mix, with traditional bricks size 23X11X7 cms using 2nd class bricks from approved source having minimum crushing strength of 35 kg/cm2, including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

40.82

8777

358278

... More
Pilgrims shed;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges but excluding seigniorage charges & taxes like GST etc., complet

430.47

391

168658

... More
Pilgrims shed;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

91.08

3868

352371

... More
Pilgrims shed;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 415/Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

9.33

74245

692707

... More
Pilgrims shed;Columns above plinth beam

10.2

13194

134587

... More
Pilgrims shed;Plinth Beam

29.62

12901

382150

... More
Pilgrims shed;Columns below plinth beam

4.59

13194

60564

... More
Pilgrims shed;Pedastals

11.33

10554

119582

... More
Pilgrims shed;Footings

34.62

9928

343723

... More
Pilgrims shed;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Pilgrims shed;P.C.C. (1:5:10) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

78.8

5218

411215

... More
Pilgrims shed;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

19.75

5456

107767

... More
Pilgrims shed;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

250.24

237

59507



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.