Endowments Department Tender

... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date18 Feb 2025
Closing Date5 Mar 2025
Tender Amount₹ 9,65,439 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Supply and fixing of Metal Stoopy with sthoopi dandam, brahma randram including cost and conveyance of all materials and labour charges etc., complete

1.83

3885

7110

... More
Civil Work;Fixing Charges

1

1600

1600

... More
Civil Work;Dressing

29.63

505

14963

... More
Civil Work;Cost of Stone

11.44

250

2859

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)

-

-

-

... More
Civil Work;Supply and fixing of black granite stone including fine dressing charges and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials and labour charges etc., complete but excluding seigniorage charges and taxes etc., complete

1

7000

7000

... More
Civil Work;Pushpa Pothikas

4

1400

5600

... More
Civil Work;Ornamental Plastering to Pillars

70.13

120

8416

... More
Civil Work;Arches

20

400

8000

... More
Civil Work;Padmams 5 Feet Dia

1.77

400

708

... More
Civil Work;1st Storey

21.87

12929

28276

... More
Civil Work;Ground floor

38.98

11908

46418

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;First Floor

7.62

12000

91443

... More
Civil Work;Ground floor

10.26

11686

119903

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Flooring with high polished shabad stones (Tandur blue) 1st quality 15mm to 18mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

9.76

743

7253

... More
Civil Work;Plastering to Cement mortor 2 coats 20mm thick single coat finished smooth including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

253.9

237

60398

... More
Civil Work;Plastering to Cement mortor 2 coats to 12mm thick single coat finished smooth including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

35.32

189

6680

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.52

73338

38137

... More
Civil Work;Kodangai

9.15

1344

12303

... More
Civil Work;Roof Slab 125mm thick

14.87

1387

20627

... More
Civil Work;Roof Beam

0.92

11607

10679

... More
Civil Work;Plinth Beam

2.64

11595

30612

... More
Civil Work;Columns

0.67

11927

7991

... More
Civil Work;Pedastals

0.45

9434

4245

... More
Civil Work;Footings

0.91

8845

8050

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.

11.01

8257

90920

... More
Civil Work;Construction of RR masonry in CM (1:6) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

33.36

4271

142483

... More
Civil Work;C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

20.02

4633

92759

... More
Civil Work;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complet

31.1

381

11861

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

8.28

1066

8831

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

65.68

225

14804



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.