Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date26 Jan 2025
Closing Soon10 Feb 2025
Tender Amount₹ 3,56,507 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Balance work;Painting to new walls with 2 coats of plastic emulsion/ Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 (making three coats) on New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., but excluding taxes like GST etc, complete for finished item of work as per SS 911 for internal walls

153.06

1809

27698

... More
Balance work;Plastering to brick masonry wall with 12mm thick single coat in CM (1:3) with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) (CSSR) for Even Surface/ Internal Walls.

13.01

162

2111

... More
Balance work;Plastering to brick masonry wall with 20mm thick single coat in CM (1:5) with dubara sponge finish including cost and conveyance of all materials and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, over heads & contractor profit, but excluding seignorage charges and taxes like GST, etc., complete for for finished item of work. (APSS 901 & 903 ) for uneven surface / outer Walls.

15.79

244

3867

... More
Balance work;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms as per Table - I of IS:1077-1992 Non-Modular or traditional size 23x11x7cm, having compressive strength not less than 35kg/cm2, including cost & conveyance of all materials and labour charges, centering & scafolding charges, constructing masnory, lift charges, curing, overhead charges & Contractors profit etc., complete. But excluding seignorage chages and taxes like GST. (APSS No.501 & 504) for Super structure. IN GROUND FLOOR

2.28

8227

18759

... More
Balance work;IMPROVEMENTS WORKS TO EXISTING SHED

-

-

-

... More
Balance work;Synthetic Enamel paints - Two Coats for New Iron Work Over Primary Coat total 3 coats including cost and conveyance of all materials and labour charges etc., complete for finished item of work.

29.36

2315

6799

... More
Balance work;Painting to new walls with 2 coats of plastic emulsion/ Acrylic emulsion paint interior grade having VOC (Volatile Organic Compound ) content less than 50 grams/ Lit. or Equivalent and shade over Priming Coat with Cement Primer Waterbase Interior Gr- 1 (making three coats) on New Plastered Surfaceafter thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., but excluding taxes like GST etc, complete for finished item of work as per SS 911 for internal walls

106

1809

19182

... More
Balance work;Supply, fabricating and fixing hand railing / Iron grill in position using MS tubes & pipes, flats as per IS 1161 including cost & conveyance of materials to site, fabrication, labour charges for fixing etc., in position complete, excluding taxes like GST etc. A] MS 50mmx250mmx4mm thick Square Pipe B] Truss C] 40mmx 40mm x4.00mm thick Square Pipe D] M/s Sheet 3mm thick

632

126

79739

... More
Balance work;Plastering to brick masonry wall with 12mm thick single coat in CM (1:3) with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) (CSSR) for Even Surface/ Internal Walls.

48.68

162

7899

... More
Balance work;Plastering to brick masonry wall with 20mm thick single coat in CM (1:5) with dubara sponge finish including cost and conveyance of all materials and labour charges, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, over heads & contractor profit, but excluding seignorage charges and taxes like GST, etc., complete for for finished item of work. (APSS 901 & 903 ) for uneven surface / outer Walls.

74.97

244

18359

... More
Balance work;Cement Flooring with 12mm thick single coat in CM (1:3) with dubara sponge finish including cost and conveyance of all material and labour charges, over heads & contractor profit, all operational, incidental such as scaffolding charges, lift charges, including cutting of Grooves,finishing, curing, but excluding seigniorage charges and taxes like GST etc., complete for for finished item of work. (APSS 901 & 904) (CSSR) for Even Surface/ Internal Walls.

74.32

166

12375

... More
Balance work;Plain Cement concrete (M 20) Nominal Mix using 20mm graded metal using concrete mixer - using 20mm HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., including all operational, incidental and labour charges such as, machine mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & taxes like GST etc. (APSS 402)

7.47

5214

38951

... More
Balance work;Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms as per Table - I of IS:1077-1992 Non-Modular or traditional size 23x11x7cm, having compressive strength not less than 35kg/cm2, including cost & conveyance of all materials and labour charges, centering & scafolding charges, constructing masnory, lift charges, curing, overhead charges & Contractors profit etc., complete. But excluding seignorage chages and taxes like GST. (APSS No.501 & 504) for Super structure. IN GROUND FLOOR

11.63

8227

95686



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.