Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Building Construction
Opening Date7 Nov 2024
Closing Soon21 Nov 2024
Tender Amount₹ 34,30,150 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Drilling holes of 25mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. Excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc., and overheads & contractors profit complete for finished item of work.

18.29

180

3292

... More
Civil Work;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc., and overheads & contractors profit complete for finished item of work

18.29

132

2414

... More
Civil Work;Plain Cement concrete (M20) Nominal Mix using 20mm graded metal using concrete mixer - using 20m HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

1.42

6624

9381

... More
Civil Work;P.C.C. (1:3:6) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

3.13

5491

17188

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Footings-F1

2.87

11026

31645

... More
Civil Work;Pedastals

0.91

11829

10764

... More
Civil Work;Columns

1.73

15055

26046

... More
Civil Work;Plinth Beam

1.04

14287

14859

... More
Civil Work;Roof Beam (1st Floor Level)

1.3

13943

18127

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;1st Storey

9.23

1666

15381

... More
Civil Work;Kodangai

12.45

1605

19987

... More
Civil Work;Lintels (G.F) Door fram Top

0.35

12696

4444

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

1.2

83031

99320

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;1st Storey

10.54

14270

150416

... More
Civil Work;2nd Storey

4.7

14584

68549

... More
Civil Work;3rd Storey

3.74

14898

55721

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;1st Storey

31.99

34613

110727

... More
Civil Work;2nd Storey

17.72

34613

61334

... More
Civil Work;3rd Storey

15.75

34613

54516

... More
Civil Work;Plastering to ceiling with 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

5.81

284

1654

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - GF

51.1

642

32808

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 1st Floor

10.4

702

7305

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 2nd Floor

5.99

702

4208

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 3rd Floor

5.2

702

3653

... More
Civil Work;Supply and fixing of Granite stone door frame including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)

-

-

-

... More
Civil Work;Cost of Stone

272

250

68000

... More
Civil Work;Dressing Charges

304

405

123120

... More
Civil Work;Fixing Charges

8

1600

12800

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 18mm thick slabs other than black and regular colours set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

39.07

2700

105489

... More
Civil Work;Supplying and fixing of teak wood temple type Door shutter with 2 leaves as per standard temple design including cost of frame and planks and preparation charges fixing of shutters in position, locking arrangements etc., complete. Double Padmams with padmarekulu & Plain frame

96

3100

297600

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Up to 20'-0" ht

800

12

9600

... More
Civil Work;20'-00" to 30'-00" ht

302

11

3322

... More
Civil Work;Supply and fixing of Brass Stoopi with Stoopidandam upto 2'-0" ht(18 to 20 guage) including cost and conveyance of all materials and labour charges etc., complete

15

2570

38550

... More
Civil Work;Providing Cement Vigrahams using brick bats, sand, cement etc., complete (four hands vigrahams upto 2'-00" ht)

-

-

-

... More
Civil Work;Vrigarhams 4H sitting of 2'-0" to 4'-0" ht

55

1598

87890

... More
Civil Work;Providing Pancha Colour paint two coats over primary coat to vigrahams or temples with ready mixed synthetic enamel paints in all shades grade - I having VOC (Volatile Organic Compound) content less than 50 grams/lit. (Apco light, Asian/Brazer make) as per approved matching colour including cost and conveyance of all materials, labour charges, brushes etc., complete(as per silpi standards). But excluding seigniorage charges and taxes like GST etc.

72.69

15784

114737

... More
Civil Work;Painting to new walls with 1 coat of plastic/ acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ Ltr., or equivalent and shade over priming coat with cement primer water base interior Gr- on new plastered surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc., complete for finished item of work for external walls

56

240

13440

... More
Civil Work;Construction of 3 Storied Raja Gopuramat South Side

-

-

-

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

11.33

315

3575

... More
Civil Work;Earth work excavation for foundation for building in hard rock (blasting prohibited) and depositing on bank for all lifts and with an initial lead of 10m and upto 3m depth including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

5.66

2332

13213

... More
Civil Work;Drilling holes of 25mm dia and 800mm deep in hard rock or sheet rock with pneumatic compressor and placing of 20mm dia Tor steel bars and grouting the holes in CM(1:2) prop. Excluding cost of steel and its fabrication charges but including cost and conveyance of all materials and labour charges etc., and overheads & contractors profit complete for finished item of work.

18.29

180

3292

... More
Civil Work;Grouting the holes with neat cement slurry excluding cost of steel but including cost and conveyance of all materials and labour charges etc., and overheads & contractors profit complete for finished item of work

18.29

132

2414

... More
Civil Work;Plain Cement concrete (M20) Nominal Mix using 20mm graded metal using concrete mixer - using 20m HG metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

1.42

6624

9381

... More
Civil Work;P.C.C. (1:3:6) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

3.13

5491

17188

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Footings-F1

2.87

11026

31645

... More
Civil Work;Pedastals

0.91

11829

10764

... More
Civil Work;Columns

1.73

15055

26046

... More
Civil Work;Plinth Beam

1.04

14287

14859

... More
Civil Work;Roof Beam (1st Floor Level)

1.3

13943

18127

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;1st Storey

9.23

1666

15381

... More
Civil Work;Kodangai

12.45

1605

19987

... More
Civil Work;Lintels (G.F) Door fram Top

0.35

12696

4444

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

1.2

83031

99320

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;1st Storey

10.54

14270

150416

... More
Civil Work;2nd Storey

4.7

14584

68549

... More
Civil Work;3rd Storey

3.74

14898

55721

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;1st Storey

31.99

34613

110727

... More
Civil Work;2nd Storey

17.72

34613

61334

... More
Civil Work;3rd Storey

15.75

34613

54516

... More
Civil Work;Plastering to ceiling with 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

5.81

284

1654

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - GF

51.1

642

32808

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 1st Floor

10.4

702

7305

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 2nd Floor

5.99

702

4208

... More
Civil Work;Plastering with CM(1:4), 12mm thick single coat dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work for internal walls/ Even surface walls - 3rd Floor

5.2

702

3653

... More
Civil Work;Supply and fixing of Granite stone door frame including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)

-

-

-

... More
Civil Work;Cost of Stone

272

250

68000

... More
Civil Work;Dressing Charges

304

405

123120

... More
Civil Work;Fixing Charges

8

1600

12800

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 18mm thick slabs other than black and regular colours set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

39.07

2700

105489

... More
Civil Work;Supplying and fixing of teak wood temple type Door shutter with 2 leaves as per standard temple design including cost of frame and planks and preparation charges fixing of shutters in position, locking arrangements etc., complete. Double Padmams with padmarekulu & Plain frame

96

3100

297600

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Up to 20'-0" ht

800

12

9600

... More
Civil Work;20'-00" to 30'-00" ht

302

11

3322

... More
Civil Work;Supply and fixing of Brass Stoopi with Stoopidandam upto 2'-0" ht(18 to 20 guage) including cost and conveyance of all materials and labour charges etc., complete

15

2570

38550

... More
Civil Work;Providing Cement Vigrahams using brick bats, sand, cement etc., complete (four hands vigrahams upto 2'-00" ht)

-

-

-

... More
Civil Work;Vrigarhams 4H sitting of 2'-0" to 4'-0" ht

55

1598

87890

... More
Civil Work;Providing Pancha Colour paint two coats over primary coat to vigrahams or temples with ready mixed synthetic enamel paints in all shades grade - I having VOC (Volatile Organic Compound) content less than 50 grams/lit. (Apco light, Asian/Brazer make) as per approved matching colour including cost and conveyance of all materials, labour charges, brushes etc., complete(as per silpi standards). But excluding seigniorage charges and taxes like GST etc.

72.69

15784

114737

... More
Civil Work;Painting to new walls with 1 coat of plastic/ acrylic emulsion paint exterior grade with silicon additives having VOC (Volatile Organic Compound) content less than 50 grams/ Ltr., or equivalent and shade over priming coat with cement primer water base interior Gr- on new plastered surface after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges but excluding GST etc., complete for finished item of work for external walls

56

240

13440



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.