Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Civil Works Others
Opening Date7 Sep 2023
Closing Date22 Sep 2023
Tender Amount₹ 7,87,829 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Retaining wall;Plain Cement concrete Grade M20 - Nominal Mix using 20mm HG Machine Crushed graded metal (Coarse aggregate) using 20mm size HG M/c (SS5) metal from approved quarry, including cost and conveyance of all materials like cement, fine aggregate, coarse aggregate, water etc., to site including all operational operational, incidental and labour charges, such as, hand mixing, laying concrete , curing, including contractor's profit and over head charges etc., complete but excluding seigniorage charges & GST etc. (APSS No.402).

43.97

5889

258978

... More
Retaining wall;RR Masonry in CM (1:8) - Construction of RR Masonry in CM (1:6) Cement: Sand) using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand, water, etc., to site including cost and conveyance of all material and all operational, incidental, and labor charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding seigniorage charges and taxes like GST complete for finished item of work for foundation and basement (APDSS No. 601 & 615)

52.11

3631

189235

... More
Retaining wall;Supply and filling of gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. including cost and conveyance of all materials and labour charges, and contractors profit & over heads but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO. 309 & 310)

195.41

388

75899

... More
Retaining wall;Retaining Wall Base

8.14

10736

87398

... More
Retaining wall;Spply and placing VRCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing, steel centering & steel shuttering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, centering, shuttering, and also excluding seigniorage charges and taxes like GST etc. (APSS 403)

-

-

-

... More
Retaining wall;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m, including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting, etc. complete for finished item of work excluding dewatering charges etc., including cost and conveyance of all material and labour charges, contractors profit & over heads etc., but excluding seigniorage charges & taxes like GST etc. , complete. (APDSS NO.308)

5.95

219

1306

... More
Retaining wall;Grouting of Holes including cost and conveyance of all materials and labour charges, all operational, incidental such as & contractor profit, but excluding seignorage charges and taxes like GST, etc., complete for for finished item of work. 20mmØ

89.15

102

9171

... More
Retaining wall;Drilling of Holes 20mm Ø including cost and conveyance of all materials and labour charges, all operational, incidental such as & contractor profit, but excluding seignorage charges and taxes like GST, etc., complete for for finished item of work.

89.15

144

12918



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.