Endowments Department Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Endowments Department Tender

Works
Civil And Construction
Opening Date1 Oct 2024
Closing Date15 Oct 2024
Tender Amount₹ 37,81,062 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

55.18

27373

151045

... More
Civil Work;Supply and Filling of gravel in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges but excluding seigniorage charges & taxes like GST etc., complet

31.29

622

19481

... More
Civil Work;Impervious coat to exposed RCC roof slab surface with CM (1:3) 20 mm thick with 1 kg of water proof compound/ bag of cement laid over roof when it is in green including cost and conveyance of all materials to site, cost of, all taxes, finishing, curing, scaffolding and all operational, incidental, labour charges, etc., including cutting grooves where ever necessary etc., complete for finished item of work.

49.61

5190

25750

... More
Civil Work;Plastering to CM IN CEILLING WITH 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

111.77

2172

24279

... More
Civil Work;Plastering to CM IN 20mm thick single coat in CM (1:5) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

22.3

2772

6182

... More
Civil Work;Ceiling Padmam

39.29

400

15714

... More
Civil Work;Providing Pushpa Pothikas

25

1400

35000

... More
Civil Work;Oranamentaion to columns

317.44

233

73964

... More
Civil Work;Vyalam

33.2

27354

90817

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

-

-

... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.

1.42

8996

12775

... More
Civil Work;Vyalam on Mandapam

2.42

12983

31420

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

20.05

4141

83044

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

2.27

74531

169485

... More
Civil Work;Kodangai

25.69

1330

34189

... More
Civil Work;Roof Slab 5mm thick

49.61

1356

67298

... More
Civil Work;Roof Beam

5.57

11362

63289

... More
Civil Work;Plinth Beam

2.61

11350

29625

... More
Civil Work;Columns

3.04

11682

35515

... More
Civil Work;Pedastals

1.81

9189

16633

... More
Civil Work;Footings

3.63

8601

31222

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

11.78

4386

51669

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

2.72

1704

4636

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete for ordinary soil- Manual Means upto 3 m depth for foundation - open excavation

34.44

225

7762

... More
Civil Work;Construction of Mandapam

-

-

-

... More
Civil Work;Painting to new walls with 2 coats of synthetic polymer plastic emulsion paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for walls

143.02

1730

24754

... More
Civil Work;Above 20 feet height

360

11

3960

... More
Civil Work;Up to 20'-0" ht

1600

12

19200

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Supply and fixing of Metal Stoopy with sthoopi dandam, brahma randram stone (Gandhapu- Raie) including cost and conveyance of all materials and labour charges etc., complete

1.39

2570

3572

... More
Civil Work;Preparation and fixing of best teak wood/non teak wood ornamental door shuters with tw leaves as pet standard temple design including cost of frame and planks and preparation charges.(i.e. Door shutter with best teak wood frame of 2: thick padmams position locking arrangements etc complete. (5.101) single padmam

34.82

2850

99237

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

8.85

27373

24225

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

12.08

1704

20590

... More
Civil Work;Supply and fixing of black granite stone including fine dressing charges and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials and labour charges etc., complete but excluding seigniorage charges and taxes etc., complete

1

7000

7000

... More
Civil Work;Fixing Charges

1

1600

1600

... More
Civil Work;Palamana Dressing

37.86

405

15333

... More
Civil Work;Cost of Stone

24.5

373

9138

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)

-

-

-

... More
Civil Work;Plastering to CM IN CEILLING WITH 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

6.48

2172

1408

... More
Civil Work;Plastering to CM IN 20mm thick single coat in CM (1:5) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

28.3

2772

7845

... More
Civil Work;Vimanam 2nd Storey

16.21

29607

47994

... More
Civil Work;Vimanam 1st Storey

34.87

27354

95385

... More
Civil Work;Upapeetam

57.17

12582

71932

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.

0.36

8996

3239

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.36

74531

26534

... More
Civil Work;Roof Slab 5" thick

8.03

1356

10893

... More
Civil Work;Plinrth beams

2.94

11350

33371

... More
Civil Work;Lintel

0.11

11845

1303

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Vimanam 2nd Storey

6.43

13297

85502

... More
Civil Work;Vimanam 1st Storey

13.1

12983

170084

... More
Civil Work;Upapeetam

27.52

12669

348667

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

34.2

4141

141652

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

7.13

4386

31274

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

4.09

1704

6971

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete for ordinary soil- Manual Means upto 3 m depth for foundation - open excavation

57.29

225

12913

... More
Civil Work;Renovation of Sri Shivalayam (Garbhalayam) at Arpanpally

-

-

-

... More
Civil Work;Painting to new walls with 2 coats of synthetic polymer plastic emulsion paint of approved brand and colour over a base coat of appropriate primer of approved brand of first grade making 3 coats in all to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost and conveyance of all materials to work site and operational, labour charges and incidental charges such as SS911 for walls

143.02

1730

24754

... More
Civil Work;Above 20 feet height

360

11

3960

... More
Civil Work;Up to 20'-0" ht

1600

12

19200

... More
Civil Work;Supplying and fixing of scaffolding during execution of work including cost and conveyance of all materials such as Casino poles, bamboos platform, nails and coir rope etc., complete

-

-

-

... More
Civil Work;Supply and fixing of Metal Stoopy with sthoopi dandam, brahma randram stone (Gandhapu- Raie) including cost and conveyance of all materials and labour charges etc., complete

1.39

2570

3572

... More
Civil Work;Preparation and fixing of best teak wood/non teak wood ornamental door shuters with tw leaves as pet standard temple design including cost of frame and planks and preparation charges.(i.e. Door shutter with best teak wood frame of 2: thick padmams position locking arrangements etc complete. (5.101) single padmam

34.82

2850

99237

... More
Civil Work;Flooring with high polished shabad stones 1st quality 16mm to 20mm thick wideth of 2.43m set over base coat of cement mortar (1:8) 20mm thick (joints of stone must be flushed) over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.30 Kgs per sqm., jointed with neat cement to full depth mixed with pigment of matching shade, including cost of all materials like flooring slab, cement, sand, and water etc., to complete excluding seigniorage charges, labour charges for dressing, rubbing and polishing of flooring stoens etc., complete for finished item of work but excluding the cost of conveyance of all materials.

8.85

27373

24225

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

12.08

1704

20590

... More
Civil Work;Supply and fixing of black granite stone including fine dressing charges and polishing to the shape and dimensions as per the approved drawing including cost and conveyance of all materials and labour charges etc., complete but excluding seigniorage charges and taxes etc., complete

1

7000

7000

... More
Civil Work;Fixing Charges

1

1600

1600

... More
Civil Work;Palamana Dressing

37.86

405

15333

... More
Civil Work;Cost of Stone

24.5

373

9138

... More
Civil Work;Supply and fixing of Black Granite stone including fine dressing and polishing to the shape and dimesnions as per the approved drawing including cost and conveyance of all material and labour charges etc., excluding seigniorage charges 7 taxes on all materials complete (Door Frame)

-

-

-

... More
Civil Work;Plastering to CM IN CEILLING WITH 12mm thick single coat in CM (1:3) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

6.48

2172

1408

... More
Civil Work;Plastering to CM IN 20mm thick single coat in CM (1:5) dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work

28.3

2772

7845

... More
Civil Work;Vimanam 2nd Storey

16.21

29625

48023

... More
Civil Work;Vimanam 1st Storey

34.87

27354

95385

... More
Civil Work;Upapeetam

57.17

12582

71932

... More
Civil Work;Ornamental Plastering 1" to 1 1/4" thick with base plastering 1/2" to 3/4" with CM (1:3) and top finishing 1/2" thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete

-

9133

-

... More
Civil Work;Brick Masonry in CM (1:8) prop (Cement: sand) with bricks traditional size 23x11x7cms second class from approved source having minimum crushing strength of 35kg/sqcm including cost and conveyance of all materials, like cement, sand, bricks, water etc., to site excluding seigniorage charges, sales & other taxes on all materials, and such as labour charges, like cement mortar, scafolding charges, constructing masonry, lift charges, curign etc, complete fro finished item of work. Provide brick pillasters of 9"x9" size at 10' c/c.

0.36

8996

3239

... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 500/500D/550 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors

0.36

74531

26534

... More
Civil Work;Roof Slab 5" thick

8.03

1356

10893

... More
Civil Work;Plinrth beams

2.94

11350

33371

... More
Civil Work;Lintel

0.11

11845

1303

... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work

-

-

-

... More
Civil Work;Vimanam 2nd Storey

6.43

13297

85502

... More
Civil Work;Vimanam 1st Storey

13.1

12983

170084

... More
Civil Work;Upapeetam

27.52

12669

348667

... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, using 2nd class bricks including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes

-

-

-

... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement

34.2

4141

141652

... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work

7.13

4386

31274

... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete

4.09

1704

6971

... More
Civil Work;Earth work excavation for foundation and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, labour charges such as shoring, sheeting, planking, strutting ,etc., complete for finished item of work including excluding seigniorage excluding dewatering charges etc., including cost and conveyance of all material and labour charges, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete for ordinary soil- Manual Means upto 3 m depth for foundation - open excavation

57.29

225

12913



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.