Endowments Department Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Costs
EMD
₹ 34,271Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
547119Tender No
EE/06/2024-7Tender Authority
Endowments Department ViewPurchaser Address
-Website
http://tender.telangana.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Civil Work;Supply and fixing of Upve 2nd class fully panelled windows using 3" X 2.5" size scatting for frames and 1 1/2" thick styles rails 3/4" thick planks with all necessary fittings and all furniture etc complete for finished item of work and wind appliances
4.46
9875
44044
... More
Civil Work;Plastering to brick masonry with 20mm thick double coat in CM (1:6) 16mm thick base coat and CM(1:4) OF 4mm thick top coat with dubara sponge finish including cost and conveyance of all materials and labour charges, over heads & contractor profit all operationa, incidental such as scaffolding charges, lift charges, including cutting of grroves, finishing, curing but excluding GST and Seigniorage charges, etc., complete for finished item of work
1170.22
4647
543878
... More
Civil Work;Brick Masonry in CM (1:8) with 2nd class bricks treaditional size 23 x 11x 7 cms as per table-I of IS:1077-1992 Non-Modular or traditional size 23 x 11x7 cm, having compressive strength not less than 35kg/cm2,including cost & conveyance of all materials and labour charges. Centering & scafolding charges. Constructing
130.51
8418
1098760
... More
Civil Work;Plastering with Cement Mortor in two coats 12mm thick (8mm +4mm) thick, (i.e. CM(1:5) 8mm thick and CM(1:3) 4mm thick) finished smooth including cost and conveyance of all materials like cement, sand, water etc., to site excluding seigniorage charges, sales and other taxes on all materials and all operational, incidental charges, scaffolding and labour charges, such as mixing cement mortor, curing including cutting grooves wherever necessary etc., complete as a finished item of work.
14.69
4493
6601
... More
Civil Work;Arche in Salaharam
20
400
8000
... More
Civil Work;Pushpa Pothikas
3.75
1400
5250
... More
Civil Work;Pillar
90
194
17460
... More
Civil Work;Ornamental Plastering 25mm to 40mm thick with base plastering 12mm to 20mm in CM (1:3) and top finishing 12mm thick with CM (1:2) to bring the required ornamentation, fine and rendering with neat cement including cost and conveyance of all materials, labour charges,all incidental and operational charges, curing etc., complete. to the required shape and size as per the approved drawing and as per silpi drawing and as per silpi norms. excluding seigniorage charges, operational charges etc., complete
14.88
12108
18018
... More
Civil Work;Ornamental Brick Masonry in CM (1:5) mix, with traditional bricks size 23X11X7 cms using 2nd class bricks from approved source having minimum crushing strength of 35 kg/cm2, including cost and conveyance of all materials, labour charges, operational charges etc., complete but excluding seigniorage charges and taxes
0.97
11910
11553
... More
Civil Work;Providing High Yield Strength Deformed (HYSD/ TMT/MS) Steel bars (Fe 415/Fe 500 D grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forminggrills fro reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including overhead charges & contractor's profit but excluding GST on all materials etc., complete for finished item of work in all floors
1.4
82882
116035
... More
Civil Work;Roof Slab 125mm thick
10.67
1323
14118
... More
Civil Work;Roof Beam
0.88
11225
9878
... More
Civil Work;Plinth Beam
11.9
11213
133441
... More
Civil Work;Columns
0.93
11545
10737
... More
Civil Work;Pedastals
0.45
9052
4074
... More
Civil Work;Footings
1.42
8464
12019
... More
Civil Work;Supply and placing of the VRCC M20 Nominal mix Concrete ( Cement: fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 usign with 20mm size graded machine crushed Hard Granite metal (Coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggreagate(sand), coarse aggreagate, water etc., to site including cost and conveyance of all materials, including all operational, incidental and labour charges such as machine mixing using concrete mixer, laying concrete, curing, including contractor's profit and over head charges etc., complete but excluding cost of steel and its fabrication charges for finished item of work including steel centering & shuttering, laying concrete, vibrating, curing etc., complete but excluding GST charges for finished item of work
-
-
-
... More
Civil Work;Construction of RR masonry in CM (1:8) Cement: Sand using hard granite stones from approved quarry including cost and conveyance of all materials like trap stones, cement, sand,water etc., to site including cost and conveyance of all materials and all operational, incidetnal and labour charges such as cutting stones to required size and shape, mixing of cement mortar, constructing masonry, curing etc., and including over heads & contractor's profit, but excluding GST and seigniorage charges complete for finished item of work for foundation and basement
163.01
3796
618864
... More
Civil Work;P.C.C. (1:4:8) in prop. (Cement:fine aggregate: coarse aggregate) using 40mm size (SS 5) hard granite machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc., to site, labour charges, machine mixing, laying of concrete in foundations and under flooring bed, ramming in layers not exceeding 15cm thick, finishing top surface to the required level, curing etc., but excluding seigniorage charges and GST complete forfinished item of work
17.51
4209
73703
... More
Civil Work;Supply and Filling of Sand in trenches, sides of foundation and basement with initial lead in layers not exceeding 15cms thick, consolidating each deposited layer by watering and ramming including cost, all operational, incidental, labour charges, complete for finished item of work incluiding cost and conveyance of all materials and labour chages, and contractors profit & over heads but excluding seigniorage charges and GST etc., complete
1.06
1240
1315
... More
Civil Work;Earth Work excavation in all type of soils like BC, Redearth, ordinary gravelse etc with intial lead and lifts etc. Complete for foundation
161.31
2253
36357
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements