Cement Corporation Of India Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Cement Corporation Of India Limited - CCI Tender

Services
Civil And Construction
Civil Works Others
Machinery and Tools
Eprocure
Opening Date31 Jul 2024
Closing Date17 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Notice Inviting Tender for Supply of Annual contract for Plant Maintenance Jobs Pre clinkerisation works
Supply of Annual contract for Plant Maintenance Jobs Pre clinkerisation works
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Replacement of Head drum sprocket & bearing with coupling (includes dismantling and assembly of coupling and bearing )

1

-

-

... More
Replacement of Tail drum sprocket/ bearing (includes releasing/adjustment of counter weight arrangement, De linking of chains)

1

-

-

... More
LS Crusher & stacker

-

-

-

... More
Revival and Commissioning of Bag Filter - Type III

6

-

-

... More
Hammers replacement

1

-

-

... More
grate bars/Segment (2 1/4') replacement

1

-

-

... More
Stacker wheels replacement ( NDE & DE/ bogie guide roller/ bogie alignemnt )

1

-

-

... More
Raw mill main gear box

-

-

-

... More
Raw mill main gear box input coupling torsion shaft/ input coupling flexible element (Rubber) replacement (motor side)/ input coupling bolts decoupling and re coupling replacement

1

-

-

... More
Input coupling spring plate replacement ( gear box side & motor side)

1

-

-

... More
Rawmill main gear box complete oil replacement (including cleaning of tank, etc)

1

-

-

... More
Raw mill, Hydraullic cylinder & rocker arm

-

-

-

... More
Mill body liners replacement

1

-

-

... More
Hydraulic cylinder /Seal cylinder/ cylinder bottom/ yoke bearing/yoke/yoke half nut replacement

1

-

-

... More
Nitrogen cylinder/ spare cylinder bladder replacement

1

-

-

... More
Rocker arm thrust plate replacement of thrust plate/ bolts.

1

-

-

... More
Rocker arm axle bearing replacement

1

-

-

... More
Dam ring

-

-

-

... More
Dam Ring Replacement

1

-

-

... More
Dam Ring removal and fitment of Segment

1

-

-

... More
Dam ring broken bolt removal and new bolt fixing/vertical plate replacement / Scattering ring replacement

1

-

-

... More
Tripple gate feeder

-

-

-

... More
Triple gate cylinder replacement

1

-

-

... More
Tripple gate feeder bearings replacement

1

-

-

... More
Tripple gate feeder flap replacement

1

-

-

... More
Tripple gate feeder body liner replacement

1

-

-

... More
Classifier

-

-

-

... More
Classifier shaft/bearing replacement

1

-

-

... More
Classifier vanes replacement

1

-

-

... More
Classifier cardan shaft /diaphragm coupling replacement

1

-

-

... More
Mill fixed dampers repair/replacement

1

-

-

... More
Expansion Joints of various sections like: rawmill, coal mill & preheater fan outlet

-

-

-

... More
Expansion Joints fabric replacement

1

-

-

... More
Replacement of Silo extraction gate, kiln feed bin gate & SFF dosing valve

1

-

-

... More
S.S/Alloy steel Anchor

-

-

-

... More
Fabrication of anchor

1000

-

-

... More
Fixing of anchor (SS304)

1000

-

-

... More
Air blaster maintenance work

-

-

-

... More
Replacement of air blaster (include cutting, welding, dismantling, erection works, levelling & finishing works to start the plant smoothly & etc.,)

1

-

-

... More
Replacement of air blaster internals spares

100

-

-

... More
Preheater all Cyclone flaps Maintenance work

-

-

-

... More
Cyclone stage 1 (twin), 2-1, 2-2, 3-1 & 3-2 flaps replacement (including cutting of SS plate, dismantling /assembly of plate, fixing/tightening of SS bolt)

1

-

-

... More
4-1 & 4-2 cyclone flap replacement (including cutting of SS plate, dismantling /assembly of plate, fixing/tightening of SS bolt)

1

-

-

... More
Preheater all Cyclone feed pipe & cyclone Maintenance work

-

-

-

... More
Redspot patch box work (includes Anchor welding, castable & welding etc.,) / Feed pipe Patch replacement (includes Anchor welding, castable, welding & finishing works etc.,)

20

-

-

... More
Feed pipe replacement work 600 -800mm (approx) with castable up to 25Mtr (include cutting, welding, dismantling, erection works & finishing works to start the plant & etc.,)

15

-

-

... More
All Feed pipe expansion joint replacement Dia:600

-

-

-

... More
Cyclone 2-1, 2-2, 3-1, 3-2, 4-1 & 4-2 expansion joint replacement

1

-

-

... More
Fabrication of 2-1, 2-2, 3-1, 3-2, 4-1 & 4-2 cyclone expansion joint with supports, flanges and matching flanges.

1

-

-

... More
Fabrication/ Fixing of inspection door box type as per site condition size: range 400mm to 800mm square with SS anchor welding

1

-

-

... More
Replacement of immersion tube in all cyclones (2-1, 2-2, 3-1, 3-2 & 4-1 & 4-2) during shutdown/ Throttle damper at inlet Approx -3MT

-

-

-

... More
Dismantling & shifting works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, cutting, grinding, welding supports, jigs, finishing works to start the plant, etc.,) / Dismantling & shifting works of throttle damper (includes Cutting of SS plate 8 -25mm thk welding, setting, sealing ring & finishing works to start the plant, etc.

6

-

-

... More
Erection, Fitment works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, grinding, welding supports, jigs, finishing works to start the plant, etc.,) /Erection, alignment, Fitment works of throttle damper (includes Cutting of SS plate 8 -25mm thk welding, setting & finishing works to start the plant, etc.)

6

-

-

... More
Fabrication and finishing works (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work cutting, grinding, welding supports, jigs, finishing works, etc) / Fabrication and finishing work of throttle damper (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work)

6

-

-

... More
Fixing and removal of dummy plate at all cyclone and feed pipes (Includes dismantling of distance piece, cutting, welding and grinding works)/

6

-

-

... More
Kiln maintenance work during shutdown works

-

-

-

... More
Kiln shell crack welding work (shell thk 28-63mm) (deploy special welders)/ Tyre Chair pad welding work (deploy special welders)

5

-

-

... More
Replacement of damaged spring plates and tightenng of ropes at kiln inlet & outlet.

100

-

-

... More
Removal & fixing of doors for TA duct, Preduster & secondary air duct & cooler section

15

-

-

... More
Kiln outlet shell maintenance work

-

-

-

... More
Replacement of segment retianer (damaged ring) includes cutting, shifting, grinding, approachable reach, fixing anchoring works.

5

-

-

... More
Fabrication of retainer ring (with 16mm/ 20mm/25mm/upto 50mm M.S. Plate of 100-150mm width )

5

-

-

... More
Kiln outlet tip casting replacement work

-

-

-

... More
Replacement of inner / Outer tip casting segment (includes cutting, shifting, grinding, approachable reach, anchoring works)

24

-

-

... More
Multi channel burner pipe Maintenance work during shutdown

-

-

-

... More
Replacement of SS nozzle tips (includes removal of channel pipe i.e., inner axial, stabilsation pipe)

5

-

-

... More
Hardfacing welding in the channel pipes size: Ø200xL500MM (Includes patch work and finishing work to start the plant smoothly, etc.,) special wedler is required

5

-

-

... More
Replacement of Castable SS Pipe with anchors (Outer pipe) /inner axial pipe with nozzle tip (inner pipe)

1

-

-

... More
kiln and MFC firing Coal pipe

-

-

-

... More
Replacement of coal pipe size range 150mm to 250mm

5

-

-

... More
Replacement of cast basalt bend 45⁰, 90⁰, 110⁰ & Y -Bend

1

-

-

... More
a. kiln Hood replacement work during shutdown b. Cooler inlet bull nose sector with anchors /castable arrangement during shutdown and finishing. c. TA duct, Cooler & preduster side walls and top roof with brick holding frame/castable arrangment during shutdown and finishing works to start the plant smoothy, etc., d. Kiln arch plate replacement work Including welding, cutting welding anchors, retainer plate, lifting the material with castable & strengthening plate by angle

-

-

-

... More
Dismantling & shifting works includes welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )

4

-

-

... More
Erection, Fitment, welding and finishing works (including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle )

4

-

-

... More
Fabrication and finishing work includes including welding, cutting, fixing of angle frame or beam frame, strengthening plate by angle)

4

-

-

... More
Cooler Grate 1, 2 & 3 maintenance works during shutdown

-

-

-

... More
Replacement /Repair of Dead grate plate, top dead grate plate, 25mm grate plate, 25mm half grate plate 13mm grate plate 13mm half grate plate & side casting (Includes removal/fixing of grate plate, cutting, welding, tightening of bolts, & finishing works to start the plant smoothly, etc.,)

25

-

-

... More
Replacement of carrying wheel & drive crosshead wheel with bearing & assembly and rail replacement work

1

-

-

... More
Replacement of cooler fans 1 to 10 with impeller assembly

1

-

-

... More
Replacement of driven sproceket assembly with torque shaft (includes dismantling/assembly of bush bearing/ housing, sealing plate of DE side and NDE side, shaft guards, alignment works, levelling, and finishing works

1

-

-

... More
Cooler carrying wheel sealing plate replacement during shutdown dia Ø127mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required)

1

-

-

... More
Cooler drive shaft sealing plate replacement during shutdown dia Ø200mm (includes complete dismantling /fixing of new plate, welding, cutting & any small modification works if required)

1

-

-

... More
Replacement of clinker breaker hammer (includes dismantling of hood, cutting, wedling & tightening of bolts, etc., and finishing works to start the plant smoothly)

1

-

-

... More
Repair of grate beams (includes adjstment of finger, plate, cutting, welding and grinding)

1

-

-

... More
Replacement of grizzly bars ( includes dismantling of bars, cutting, wedling etc., and finishing works to start the plant smoothly)

1

-

-

... More
Spare parts Repair/assly work for cooler section

-

-

-

... More
Fabrication of cooler shaft seals fixed and movable including drilling, cutting & grinding.

5

-

-

... More
Repair of cooler carrying wheel bearing assembly/ crankspool shaft assembly/ cross head /crank head assembly/ cooler fan impeller assmebly /actuator for all cooler fans / cooler grate bars by cutting

5

-

-

... More
Repair of cooler drag chain idlers includes (replacement of bearing/ housing assembly)

1

-

-

... More
DPC Maintenance works

-

-

-

... More
Replacement of DPC partition plates and fixing.

1

-

-

... More
Replacement / Repair of DPC buckets and alignment/ rollers / partition plate /DPC chains each 1 mtr.

1

-

-

... More
Replacement of rollers and finishing work.

1

-

-

... More
Repair of partition web plate strengthening

1

-

-

... More
Replacement of DPC chains (each 1mtr)

1

-

-

... More
Replacement of curtain chains (complete set : 25 nos i.e each nos is 1mtr length chain) / Dismantling and shifting work

1

-

-

... More
Replacement of balls & rings of coal mill

-

-

-

... More
Dismantling & shifting works (Dismantling includes dismantling of Y duct, spider, top ring & bottom ring, balls, throttle ring & fill in balls) crane will be provided by CCI

5

-

-

... More
Erection, Fitment, welding and finishing works (includes erection spider, top ring & bottom ring, balls & fill in balls) crane will be provided by CCI

5

-

-

... More
Coal mill Internal

-

-

-

... More
Replacement of U bolt

1

-

-

... More
Replacement/ Fabrication of Feed pipe dia range 600mm to 800mm

5

-

-

... More
Replacement of Y duct Dia 700mm

1

-

-

... More
Fabrication of Y duct

1

-

-

... More
FK pump screw

-

-

-

... More
Replacement of DE bearing, oil seal(dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)

1

-

-

... More
Replacement of mixing chamber

1

-

-

... More
Replacement of FK pump screw (dismantling/fixing of connecting components like shifting of motor, coupling, alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)

1

-

-

... More
Replacement of diverter valve (dismantling/fixing of connecting components like shifting works,alignment, fitment, welding, cutting, finishing works to start the plant smoothly , Etc,)

1

-

-

... More
Kiln feed/Rawmill air slide cloth replacement W-400 - 700mm

-

-

-

... More
Air slide fabric replacement

1

-

-

... More
Air slide blower impeller /blower assembly with motor replacement

1

-

-

... More
Replacement of Top/bottom box with fabric

1

-

-

... More
Kiln feed Chain Bucket Elevator works

-

-

-

... More
U Link replacement

10

-

-

... More
Chain link sets replacement

10

-

-

... More
Buckets Dismantling & Erection

5

-

-

... More
Head replacement including gearbox, bearing, channels, side supports idlers etc.

1

-

-

... More
Replacement of head drum rim (includes dismantling/ assembly of hood, chain & buckets)

1

-

-

... More
Tail drum replacement includes bearing and housing

1

-

-

... More
Kiln feed/Rawmill weighfeeder Maintenance

-

-

-

... More
Belt replacement (Range W 800 to 2200mm) Ply4 includes dismantling and assemly of side supports, idlers, skirts, hood etc.,

20

-

-

... More
Belt idlers replacement

2

-

-

... More
Head replacement including gearbox, bearing, channels, side supports idlers etc.

1

-

-

... More
Tail drum replacement includes bearing and housing

1

-

-

... More
Belt bucket elevators maintenance Rawmill/Kiln

-

-

-

... More
Replacement of belt for belt bucket elevator Kiln: L180mtr/ Rawmill: L125Mtr)

1

-

-

... More
Replacement of buckets / Tightening of bucket bolts in buckets

1

-

-

... More
Kiln feed/Coal ESP/Rawmill multi cylone/ Rawmill PJBF/ Cooler ESP rotary air lock maintenance

-

-

-

... More
Repairing of RAL vanes

1

-

-

... More
Leakages arresting work at cyclones, Downcomer duct, Feed pipe, Riser duct, tagential portion, cylindrical joint, bends, smoke chamber, V-duct area,MFC & areas of preheater section etc., Welding and patch repair at various elevations coal mill, rawmill/ , kiln, preheater, cooler, packing plant and LS crusher

-

-

-

... More
Patch plate replacement at all sections / Classifiier body liner replacement

100

-

-

... More
Fabrication of angle frame or beam frame (piece of about 1.5mtr)

300

-

-

... More
fixing & removal of fabricated Angle frame or Fabricated Beam frame for holding the bricks in Preheater section

200

-

-

... More
Brick retainer plate (includes 6- 10mm thk plate fabrication and bottom ribs to be provided for support)

200

-

-

... More
Preheater Fan/Rawmill fan/Cooler ESP vent fan/PJBF fan/Coal mill fan maintenance work

-

-

-

... More
Replacement of DE bearing, housing & lybrinth seal (includes shifting of motor, alignment works, dismantling/ assembly of coupling, housing, shifting of motor shed & finishing works to start the plant, etc.,)

1

-

-

... More
Chain conveyor of Cooler ESP/Rawmill/LS crusher moving breaker chain links

-

-

-

... More
Replacement of chain links and pins

5

-

-

... More
Chain conveyor link replacement

1

-

-

... More
Rails Replacement at drag chain conveyor & DPC

1

-

-

... More
Replacement of Pulley, idler & belts for various size from 650mm to 1200mm of belt conveyor at coal mill/rawmill

-

-

-

... More
Conveyor Belt replacement length W650mm to 800mm

10

-

-

... More
Conveyor Belt replacement length W1000mm to 1200mm

10

-

-

... More
Dismantling and erection of carrying/troughing/ impact idlers/ return idlers

5

-

-

... More
Shifting/lifting/lowering of materials (i.e cylinders. Plates, equipment spares, lubricants, Gearbox,motors,screw flight,airslide boxes,airslide blowers, (Below 5MT)in all sections.

-

-

-

... More
Stores to workplace ( Ground floor) includes to and fro by trolley, etc.,

100

-

-

... More
Shifting of material from Ground floor to 30 Mtrs includes to & fro

100

-

-

... More
Shifting of material from ground floor to above30 Mtrs includes to & fro

50

-

-

... More
Replacement of various sizes of Gearboxes/Motors/any machinery/equipment items etc. (above 0.5MT) with alignment at any elevation in all sections.

-

-

-

... More
Dismantling and Shifting including welding, cutting (if required)

20

-

-

... More
Erection, Alignment and finishing work. including welding, cutting,(if required)

20

-

-

... More
Structural & Plate work like ducts, hoppers, chutes, Hood, Hood liners, hopper liners, bends, base frames,platforms,walkways,Safety guards,Shed, Roofing etc, in all sections.

-

-

-

... More
Material Shifting and dismantling

20

-

-

... More
Fabrication and finishing work includes including welding, cutting

20

-

-

... More
Erection, Alignment and finishing work. including welding, cutting

20

-

-

... More
Roofing/side cladding

10

-

-

... More
Coal mill Reversible screw conveyor, Coal ESP Screw conveyor, Prefeeder screw conveyor for kiln & MFC, GCT screw conveyor,

-

-

-

... More
Replacement of screw dia range 300mm to 400mm (Includes shifting, lowering and lifting of screw, dismantling and assembly of gearbox, bearing , bearing housing (DE & NDE side), motor and coupling, finishing works to start the plant smoothly.

1

-

-

... More
Coal/Rawmill Reclaimer

-

-

-

... More
Replacement of Gear box input or output oil seal includes motor alignment and bed leveling work shifting of motor shed & finishing works to start the plant,etc.,

1

-

-

... More
Replacement of reclaimer showel buckets

1

-

-

... More
Replacement of chains (each 1mtr) Pitch 315mm

5

-

-

... More
Spare parts Repair/assly work in all sections

-

-

-

... More
Fabrication of reclaimer showel buckets

1

-

-

... More
Welding build up and grinding of guide rollers, wheels, shafts, reclaimer wheels, shafts, Guide rollers & return rollers, Stacker wheels, Stacker wheels repair, build up grinding, assembly work, worn out pulleys, shaft of pulleys, fans or any other rotary equipment, Stacker/Reclaimer Bogie guide rollers, shafts repair build up, ( machining will be done at CCI work shop)etc

1

-

-

... More
Repair of reclaimer brackets, assembly of brackets with rollers, repair of Apron feeder/ Alind conveyor/ spillage conveyors return rollers assembly work machining will be done at CCI work shop)

1

-

-

... More
Fabrication of SS flaps, Dispersion /tongue plate (3-1, 3-2, 2-1 & 2-2) (includes Cutting of SS plate 8 -25mm thk, welding, setting & finishing work, Dismantling of distance piece, expansion joint, cutting, grinding, welding supports, jigs, finishing works to start the plant, etc.,)

10

-

-

... More
Replacement of various sizes of Gearboxes/Motors/any machinery/equipment items etc. (below 0.5MT) with alignment in all sections.

-

-

-

... More
Dismantling and erection including Alignment and finishing work. including welding, cutting,(if required), welding, cutting, lifting and lowering at elevation up to 30mtr

10

-

-

... More
Dismantling and erection including Alignment and finishing work. including welding, cutting,(if required), welding, cutting, lifting and lowering at elevation from 31mtr and above.

10

-

-

... More
Overhauling/repair of gear boxes below 200 HP

-

-

-

... More
Dismantling, repair of internals, Assembly including bearings, gears, seals, coupling, sprocket etc.,(Machining will be done CCI W/shop)

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.