Cement Corporation Of India Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Cement Corporation Of India Limited - CCI Tender

Services
Software and IT Solutions
Eprocure
Opening Date31 Jul 2024
Closing Date9 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Annual Contract For Plant Maintenance Jobs Post Clinkerisation Works

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Replacement of counter shaft Bearings(white metal ø340 mm Wt: 320kg).

-

-

-

... More
Dismantling including shifting of scrap. Requires lifting /releaseing the load of Pinion shaft assly (4.0MT) at that position only. ( EOT crane is not accesable.)

2

-

-

... More
Errection by matching blue impression including Shifting New Bearing to the work place and finishing work.

2

-

-

... More
Dismantling & erection of Torsion Shaft/ Counter shaft Size;tø570mm ; Length 5400mm including shifting.

1

-

-

... More
Replacement of Gear couplings GC-9 & GC-14.

-

-

-

... More
Dismantling of GC-9 coupling including keeping aside the HT Motor(2000kw)to make space to work.

2

-

-

... More
Erection of GC-9 coupling including refixing with alignment of HT Motor(2000kw).

2

-

-

... More
Dismantling of GC-14 coupling at out put of Gear box / pinion shaft including removal of torsion shaft.

2

-

-

... More
Erection of GC-14 coupling including refixing of torsion shaft.

2

-

-

... More
Replacement of Trunion bearing Ø2000mmx1000mm width: 1.60 MT including lifting of mill, cleaning the oil sump 7 refilling oil etc;

-

-

-

... More
Dismantling & shifting.

1.6

-

-

... More
Erection ( includs scraping & matching) and finishing work.

1.6

-

-

... More
Replacement of Cement mill & Coal crusher liners,

-

-

-

... More
Dismantling & shifting of Diaphragm liners, head liner, shell liners straight /curved Gib liners etc and scarap removal.

45

-

-

... More
Errection, finishing work of Diaphragm liners, head liner, shell liners, straight /curved Gib liners etc;

45

-

-

... More
Dismantling & shifting of Shell Liner & Diaphragm plates in 2nd chamber including scrap removal.

20

-

-

... More
Errection, finishing work & shifting of scrap plates in 2nd chamber(400 plates)

20

-

-

... More
Replacement of mill inside Cone: Size :ø 477 to ø25 mm convegrent; Wt 53 kg.

1

-

-

... More
Chain Bucket Elevators 630mm*232mm &1000 mm *355mm.

-

-

-

... More
Repairing of damaged buckets including cutting, Welding and Drilling Etc;

55

-

-

... More
Dismantling & Erection of Head(Top) Drum including acivities of removal of hood , bearings , coupling and all related finishing works.

1

-

-

... More
Dismantling & Erection of Tail (Bottom) Drum including acivities such as removal of bottom doors, arresting the counter weight and all related finishing works.

1

-

-

... More
Replacement of chain links .

100

-

-

... More
Replacement of U bolt .

200

-

-

... More
Replacement of Buckets .

30

-

-

... More
Belt Bucket elevator size:450mm, cap165tph, 42 mtrs c/c

-

-

-

... More
Replacement of Steel chord belt 450 mm (total length of 90 mtrs) including removal and re-fixing of buckets, hood, doors, preperation of ends for joiting (excluding joint), tightening and finishing work.

1

-

-

... More
Bucket bolts tightening (four bolts of a bucket makes a set) .

227

-

-

... More
Replacement of Buckets .

40

-

-

... More
PG Conveyor size;315mm width etc;

-

-

-

... More
Dismantling of PG conveyor ( top & bottom boxes) along with air slide cloth

30

-

-

... More
Installation of PG conveyor(top & bottom boxes) by fixing air slide cloth with leak proof tightening of bolts

30

-

-

... More
Replacement of air slide cloth with leak proof tightening of bolts.

75

-

-

... More
Replacement of airslide blower

2

-

-

... More
ID fan Size: 1718 mm dia ; Capacity - 54000m3/hr.

-

-

-

... More
Dismantling

1

-

-

... More
Replacement of ID fan including fixing of bearings, bibby coupling and alignment

1

-

-

... More
Replacement of Hopper feeding Tipper Rails & wheels. Two Wheels consisting of one axle becomes a set.

-

-

-

... More
Dismantling of wheels by removal of bearings, Sprackets, coupling, Gear box Etc;

1

-

-

... More
Errection and finishing work including re fixing of Bearings & sprackets, Gear box, couplings etc;

1

-

-

... More
Dismantling of rails

50

-

-

... More
Errection of rails including fixing of locking plates. Supports etc;

50

-

-

... More
Replacement of Conveyor belts for various size from 650mm to 1200mm (Removing the old belt, laying new and positioning , making ready to carry the joint by releasing the belt load & restore the belt after joint for trail run/ re-positioning the fell down belt for re jointing).

-

-

-

... More
up to the length of 50 mtrs

4

-

-

... More
up to the length of 100 mtrs

3

-

-

... More
length above 200 mtrs.

2

-

-

... More
Replacement of 1000mm width endless belts up to the length of 15Mtrs including finishing work for trail run.

5

-

-

... More
Replacement of idlers for the belt conveyors 650 mm width to 1200 mm width.

-

-

-

... More
Replacement of troughing/impact/ return idlers.

800

-

-

... More
Replacement of Head pulley /Tail pulley / Snub pulley/ Bend pulley(including dismantling and fixing of coupling/bearings , release and adjustment of counter weight arrangement etc; )

4

-

-

... More
Shifting/lifting/lowering of materials (i.e Plates, equipment spares, lubricants, Gearbox,,screw flight,airslide boxes,airslide blowers, (below 0.5MT).

-

-

-

... More
Stores to workplace ( Ground floor) includes to and fro

10

-

-

... More
From Ground floor to 30 Mtrs includes to & fro

2

-

-

... More
Replacement of various sizes of Gearboxes/couplings / pulleys /oil pumps, heat exchangers, srew conveyors /any machinery/equipment items, such as crusher / v. screen/ Bucket elevator / belt pulley bearings, etc. with alignment at any elevation (below 0.5MT).

8

-

-

... More
Shifting/lifting/lowering of materials (i.e Plates, equipment spares, lubricants, Gearbox,,screw flight,airslide boxes,airslide blowers, (above 0.5MT).

-

-

-

... More
Stores to workplace ( Ground floor) includes to and fro

10

-

-

... More
From Ground floor to 30 Mtrs includes to & fro

3

-

-

... More
Replacement of various sizes of Gearboxes/ bearings /any machinery/equipment items such as girth gear pinion, auxillery gear box, etc. with alignment at any elevation(above0.5MT)

6

-

-

... More
Patch plate welding of chutes at any elevation.

-

-

-

... More
Patch plate welding .

10

-

-

... More
Patch welding

30

-

-

... More
Replacement of Coal crusher Hammers with arms (includes removal of arm & hammers, assembly of New Hammers with arm , fixing hammer set to the rotor etc., and finishing works. (60 hammers makes a set and each hammer of 14 kg ).

1

-

-

... More
Replacement of stacker's travelling boggies.

-

-

-

... More
Dismantling including removal of Gear boxes, couplings and its connecting parts etc

2

-

-

... More
Erection of boggies including refixing of gear boxes and its alignment.

2

-

-

... More
Replacement of Wagon tippler Rubber pads at any elevation including approachable reach.

25

-

-

... More
Fabrication, Dismantling and Errection of different structures viz, hopper grill, Belt conveyor structure, skirt board, counter weight structure, tail drum trolley, deck plate etc;

-

-

-

... More
Fabrication.

5

-

-

... More
Dismantling and Shifting the scrap to scrap yard.

4

-

-

... More
Errection of plates including cutting/welding/fixing.

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.