Bharat Sanchar Nigam Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Civil Works Others
Electrical and Electronics
Electrical Works
Eprocure
Opening Date2 Mar 2024
Closing Date11 Mar 2024
Tender Amount₹ 39,830 
Notes
Download

Costs

Summary

Disamantling And Re-erection Of 15.0m Marr Mast At New Location Within The Premises

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
a)1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size)

0.2

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

1.5

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

40

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. .

20

-

-

... More
Providing and fixing bolts including nuts and washers complete.

20

-

-

... More
Extra for galvanising (of thickness not less than 120 microns) on M.S angles , flats, gussets plates, bolts, nuts and other fastners.

20

-

-

... More
Labour charges for dismantling and transportation of 15.0m at ground level with all its necessary components and fixing with bolts, nuts, plain and spring washers. Rate includes cost of all operations involved in dismantling and mechanical transportation to TE Bldg Kadthal with a lead of 12.0km including loading, unloading plants and machineries all insurance, safety provision etc all complete and nothing extra will be paid)

1

-

-

... More
Mechanical transport of 18.0m MARR mast having segments of 3.00m length each (6 Nos) from TE building compound Amangal to TE (rented) Bldg, Kadthal with a lead of 25.0km incliding loading, unloading and stacking in good condition etc all complete as directed by Engioneer-In-Charge.

1

-

-

... More
Labour charges for erection of 18.0m marr masts at ground level with all its necessary components and fixing with bolts, nuts, plain and spring washers. Rate includes cost of all operations involved in hoisting and erection of marr mast including hire and labour charges , plants and machineries all insurance, safety provision etc all complete and nothing extra will be paid)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.