Bharat Sanchar Nigam Limited Tender
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Bharat Sanchar Nigam Limited - BSNL Tender
Telecommunication Services
Eprocure
Opening Date17 Feb 2023
Closing Date9 Mar 2023
Tender Amount₹ 80,72,961
Costs
EMD
₹ 1,61,459Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BSNL_145800_1Bid Award Id
ViewTender No
PGMBA-NZB/AnP/OFC MTCE/MNC ZONE/2022-23/6Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://bsnl.co.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Tender for Outsourcing of comprehensive maintenance of OFC Network routes in Mancherial zone under Nizamabad BA.
Tender for Outsourcing of comprehensive maintenance of OFC Network routes in Mancherial zone under Nizamabad BA.
BOQ Items
... More
3) Combined rate per Kilometer per Month for Preventive and Corrective maintenance of overhead OFC as per Scope of Work (excluding GST)
1
-
150
... More
(II) 1) Combined rates per running Meter for laying U/G OF cable works (Excavation OFC trench to the depth of 165 cms, PLB laying, cable blowing, Splicing, termination wherever necessary including transportation and reinstatement for overhead normalization/OF cable works for all types of soil and strata as per standard OFC laying practices of BSNL.
1
-
285
... More
Trenching and Ducting by HDD/Boring: The scope includes excavation of test/HDD pits, duct laying below 1.65 depth using HDD methodology, backfilling, compaction and reinstatement of HDD pits to its original condition.
1
-
550
... More
Supply of GI pipe (76mm dia or 65NB, Class B, medium) for Bridge/culvert/railway crossing
1
-
680
... More
Supply of DWC pipe (75-90mm OD/ID minimum 56mm, TSEC approved) including couplers for Bridge/culvert crossing
1
-
68
... More
Installation of GI /DWC/PLB pipe for Bridge/culvert/railway crossing with Clamping (including supply of suitable clamps)
1
-
77
... More
Installation/Concreting of GI pipe/DWC pipe/PLB pipe for low depth/Bridge/culvert crossing with Concreting size of 250mm*250mm
1
-
164
... More
Laying of PLB HDPE pipe
1
-
7
... More
OFC Blowing
1
-
7
... More
Supply and Installation of RCC- Route Marker including supply of 1:2:4 concrete size of 600*600mm*150 mm as per BSNL spec
1
-
520
... More
Excavation of Joint pit in all strata and all types of soil, Supply and installation of RCC Joint chamber at 165 cm depth. Spec for RCC Joint chamber: OD 1.2m; Height 0.8m; Thickness 60mm as per BSNL spec. placing Joint ring with covers bottom and top in joint pit filling with sand and closing and consolidation after completion of cable splicing work
1
-
2000
... More
Excavation existing Joint pit (in all strata and all types of soil), re-splicing, filling with sand and closing and consolidation after completion of work.
1
-
660
... More
Excavation of test pit (in all strata and all types of soil), on OF cable trench suitable for 3’x2’X6’and closing and consolidation after completion of work.
1
-
219
... More
Supply of OF splice closure
1
-
872
... More
(III) 1.1) Combined rates per running Meter for laying O/H OF cable works (cable erection & tieing , Splicing, termination wherever necessary including transportation & supply of binding wire etc as per Scope of Work using standard practices of laying utilizing necessary OF overhead laying accessories (excluding GST).
1
-
15
... More
1.2) Combined rates per running Meter for laying O/H OF cable works (cable erection & tieing , Splicing, termination wherever necessary including transportation & supply of binding wire etc as per Scope of Work utilizing street furniture (excluding GST).
1
-
8
... More
2) Combined rates per running Meter for laying O/H OF cable works (cable erection & tieing , Splicing, termination wherever necessary including transportation & supply of binding wire etc as per Scope of Work using standard practices of laying utilizing necessary OF overhead laying accessories (excluding GST).
2(a) 6 m height(Suspension pole)
1
-
7780
... More
2(b) 8 m height(Tension pole)
1
-
10370
... More
3) Fixing of Galvanized pipe in excavated trench of size 0.45mx0.45mX0.90m and providing & laying with cement concrete with 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources.) in the excavated trench and also above ground level of size 045mx0.45mX0.20m. Cost includes of all operations involved for providing and fixing of pipe like excavation of earth work, providing & laying of cement concrete including centring and shuttering etc., and as per the directions of Engg-in-Charge.
3(a) 6 m pole (Suspension pole)
1
-
1690
... More
3(b) 8 m height(Tension pole)
1
-
2120
... More
4) O/H cable Accessories Supply & fittings(As per TEC/GR-TEC/GR/TX/OAF-001/03/ MAR-17(Type-II) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources.) in the excavated trench and also above ground level of size 045mx0.45mX0.20m. Cost includes of all operations involved for providing and fixing of pipe like excavation of earth work, providing & laying of cement concrete including centring and shuttering etc., and as per the directions of Engg-in-Charge.
4(a) Supply of complete set of Terminating pole assembly fittings to be used at tension/terminating poles(dead end poles)or poles where splices are located and the poles where the overhead alignment takes a turn(angle exceeding more than 15 degrees) that include (i) J-Shaped tension hook–2nos.
(ii) Turn Buckle–2nos.
(iii) Extension Link–2nos.
iv) Clevis Thimble–2nos.
v) Protective Helix (T)–2nos.
vi) Terminating Helix–2nos.
vii) Jumper Cable Clamp–1no.
viii) Pole Mounted Stay Clamp (Tubular)–1no.
1
-
2000
... More
4 (b)Supply of suspension pole type-I assembly fittings that include (i) Pole Mounted Stay Clamp (Tubular)–1no.
(ii) Twisted Eye Link- 1no.
(iii) Protective Helix(S)-1no.
(iv) Armour Grip (AGS) Helix-1no.
(v) Suspension Clipper with ElastomerPad-1pair
(vi) Spiral Vibration Damper(SVD)-2nos
1
-
1250
... More
4(c)Supply of suspension pole assembly fittings type-II that include (a) Universal pole bracket (with SS Strip & buckle on pole)–1no.
(b) Clevis Thimble- 1no.
(c)Suspension Helix(GI steel or Aluminum)-1no.
(d) Spiral Vibration Damper(SVD)-2nos
1
-
660
... More
5) Digging charges for tracing joint location of U/G cables whenever required to tap existing BSNL PoP/Cable end(Jointing kits will be supplied by BSNL)(Trench Specs. Refer to U/G SOR)
1
-
185
... More
6) Jointing/Splicing of OF Cable ( Based on field requirement)
a) for 2F/4F/6F/12F
1
-
260
... More
b) for 24/48F
1
-
2820
... More
c)cross capacity jointing(low capacity cable to higher based on necessity).The low capacity cable splicing charges applicable.
1
-
260
... More
7) Digging & opening of existing joint chambers for operating the joint including splicing & reinstatement of the chamber to the original position.
7(a) 2F/4F/6F/12F
1
-
760
... More
7(b) 24/48F
1
-
3320
... More
8) Supply of 4F splice closures (In case of not provided by BSNL)
1
-
60
... More
I, II & III
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements