Bharat Sanchar Nigam Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date3 Sep 2024
Closing Date11 Sep 2024
Tender Amount₹ 14,80,166 
Notes
Download

Costs

Summary

Construction Of 40 M Ground Based Tower With Rcc Foundation Including Erection Of Tower, Erection Of Bts Shelter With Available Tower/bts Materials At Bsnl Stores Including Transportation Of The Material To Site And Providing Bts Bed At New Collect

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
All kinds of soil.

8

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.

174

-

-

... More
Extra for every additional lift of 1.5 m or part thereof in excavation /banking excavated or stacked materials.

-

-

-

... More
All kinds of soil.

150

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
1:1½:3 (1 Cement: 1½ coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).

4

-

-

... More
1:4:8 (1 Cement : 4 coarse sand(zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources).

6

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :

-

-

-

... More
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

28

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

12

-

-

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

4

-

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

10

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

4100

-

-

... More
Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundations and plinth in.

-

-

-

... More
Cement mortar 1:4 (1 cement : 4 coarse sand)

63

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. (Item is operated for Horizontal gantry)

300

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
1:6 (1 cement: 6 fine sand)

29

-

-

... More
Finishing walls with Acrylic Smooth exterior paint of required shade :

-

-

-

... More
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).

29

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade:

-

-

-

... More
Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.

15

-

-

... More
Labour charges for orienting and fixing assembly of 8 nos -32 mm dia anchor bolts in each of the 4 legs /pedastals of tower with the help of template, base plate and other base arrangements . A total of 32 numbers anchor bolts shall be oriented and fixed for each tower as per drawings of Genetic requirements No GR TWR- 12/01 June 2005. Rate includes cost of necessary scaffolding arrangement etc all complete as directed by the Engineer -in-charge (Base plate and Anchor bolts will be supplied by the Department)

1

-

-

... More
Providing/ supplying at site, anchor bolts for fixing base of tower, of 32mm dia mild steel bar of required length conforming to IS:2062, threaded at top upto 150mm length and welded with lugs made from 100x100x10mm thick mild steel plate at 50mm from bottom including suitable hexagonal nuts 2 nos. (Nuts & Checknuts) and MS spring washer etc. all complete as per the tower drawing and as directed by the Engineer-in-charge. (weight of anchor bolts will be measured for payment)

370

-

-

... More
Erection of 40 mtrs height Ground based structural Steel Tower as per approved Genetic requirements No.GR TWR-12/01 June 2005 with all its necessary components Viz climbing ladder, platforms with railing and fixing with bolts, nuts, plain and spring washers. Cost includes necessary welding and alteration of any mismatching holes to the members wherever required complete in all respect as per direction of the Engineer -in-charge (NOTE:Rate includes cost of all operations involved in hoisting and erection of tower including hire and labour charges of tools, plants and machineries all insurance, safety provision , acceptance testing etc all complete ) Tower material shall be supplied by department at site. (Weight of Tower material approximately about 8.30 MT) (1. Insurance for labour deployed shall be submitted along with the final bill failing which recovery of Rs. 10,000/- will be deducted from the bill.)

1

-

-

... More
Applying priming coat with one coat of ready mixed Red oxied Zinc Chromate primer or equivalent of approved brand and manufacture to 40m tower (weight about 8.30MT) as per the specifications& TEC guidelines and as per directions of Engineer in charge.

1

-

-

... More
Applying priming coat with one coat of Etch primer (BISON wash primer or equivalent) approved brand and manufacture for 40m tower ( Tower weight about 8.30MT)as per the specifications& TEC guidelines and as per directions of Engineer in charge..

1

-

-

... More
Painting with High gloss synthetic enamel paint of approved brand and manufacture to give an even shade for 40m tower (Tower weight about 8.30MT) as per the specifications& TEC guidelines and as per directions of Engineer in charge a) Two or more coats on new work.

1

-

-

... More
Providing and fabrication to required sizes of Structural steel work riveted, bolted or welded in build up sectioons, trusses and framed work, consisting of Angles, Flats, Plates and tubes including galvanisation, nuts & bolts per approved drawing. The galvanizing shall be as per IS: 4759 with average mass of zinc coating of 610 gm/sqm (approximately 85 micron). The steel sections shall be of M.S.grade 'A' as per IS: 2062. Cost of galvanization is inclusive. The payment shall be made as per the standard structural steel tables for the bare steel sectional weights. All complete as directed by the Engineer-in-Charge (Item is operated for any missing tower members including nuts and bolts of grade 5.6 or higher grade all as specified in the tower drawing with plain & spring washer as directed by Engineer in charge)

500

-

-

... More
Mechanical transportation of tower members comprising MS angles , flats , plates, pipes nuts and bolts etc of varying sizes and lengths from BSNL Stores at Khammam or any specified place to work site. The Job includes charges towards transporation ,loading and unloading and stacking all the tower members at the designated location of all members with required leads and all lifts as per directions of Engineer -in-charge. .(Approximate weight of tower members is about 8.30 MT)

-

-

-

... More
Within the lead of 20.00Km.

1

-

-

... More
Extra over above item for transportation beyond the lead of 20.00 Km

100

-

-

... More
Assembling BTS shelter of approxmate size 2.13m x 3.13m x 2.73m with available Aluminium PUF panels including laying the bottom with plywood panels and anti-static flooring using necessary silicon sealant, aluminium rivets, SR adhesive for fixing the anti-static flooring or any other consumables and arranging sealant applying guns, rivet fixing guns as required for assembling the shelter. The work shall be carried by specialised fabricator as directed by Engineer-in-charge. (BTS shelter material, Antistatic flooring will be supplied by BSNL at no cost. Sealant, adhesive, rivets& nuts as required shall be arranged by agency which are inclusive in the quoted rate )

1

-

-

... More
Transportation of BTS shelter material(BTS shelter approxmate size 2.13m x 3.13m x 2.73m) consists of MS I sections (2 Nos x 3.00m long), shelter sandwich panels, ply wood bottom, PVC flooring etc., including collecting from stores at Hyderabad to site of work at Palwancha in Bhadradri- Kothagudem District and including loading and unloading and waiting charges etc., all complete (Approx distance 270 KMs)

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.