Bharat Sanchar Nigam Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date16 Apr 2024
Closing Date24 Apr 2024
Tender Amount₹ 4,47,938 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : a) 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

0.75

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

18

-

-

... More
Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like

6

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

160

-

-

... More
Smooth finishing of the exposed surface of C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).

10

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 3.5 in foundation and plinth in:

-

-

-

... More
a) Cement mortar 1:6 (1 cement : 6 coarse sand) Thermo-Mechanically Treated bars of grade Fe-500D or more.

10

-

-

... More
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in :

-

-

-

... More
Cement mortar 1:6 (1 cement : 6 coarse sand)

10

-

-

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :

-

-

-

... More
a) Cement mortar 1:6 (1 cement : 6 coarse sand).

6

-

-

... More
12 mm cement plaster of mix :

-

-

-

... More
a) 1:6 (1 cement: 6 fine sand)

75

-

-

... More
15 mm cement plaster on the rough side of single or half brick wall of mix :

-

-

-

... More
a)1:6 (1 cement: 6 fine sand)

75

-

-

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : a) New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).

180

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :

-

-

-

... More
a) One or more coats on old work.

10

-

-

... More
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge..

-

-

-

... More
a) In cement mortar

15

-

-

... More
Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead.

500

-

-

... More
Carting out of building rubbish / malba / similar unserviceable, dismantled, excavated or waste materials by mechanical means,through private carrier including lifting, loading, transporting, unloading to municipal dumping ground beyond 50 m initial lead,or in any other compound as decided by the Engineer-in-charge, for all leads including all lifts involved.

10

-

-

... More
Refixing of available MS grill by making good with necessary welding and straightening the bends/twists square rods, flats etc. The existing grills shall be fixed in the new proposed holdfasts to suit the existing existing hold fasts. The grills shall be fixed in the proposed compound wall after welding new holdfasts to the old MS grill, by laying CC bedblocks at the position of hold fasts in columns. The MS grills shall be fixed by embedding hold fasts in CC blocks in the proposed compound wall. All complete and as per directions of the Engineer - in - charge.

10

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.