Bharat Sanchar Nigam Limited Tender

For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date20 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 5,13,948 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Foundations, footings, bases of columns, etc. for mass concrete

26

-

-

... More
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand)

33

-

-

... More
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. .

1650

-

-

... More
Providing and fixing bolts including nuts and washers complete.

30

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :

-

-

-

... More
Two or more coats on new work.

75

-

-

... More
Extra for galvanising (of thickness not less than 120 microns) on M.S angles , flats, gussets plates, bolts, nuts and other fasteners.

1650

-

-

... More
Providing and fixing anchor fasteners (expansion fasteners) of approved quality including drilling holes in RCC and fixing complete

-

-

-

... More
a) 16 mm dia and 100mm length

150

-

-

... More
Drilling holes of 16mm dia in RCC slab/beam upto a depth 120 mm and embedding 12mm dia TMT bars of grade Fe 500D in the hole including grouting the hole with FOSROCK LOKFIX chemical or approved equivalent to anchor reinforcement excluding the cost of reinforcement as per direction of Engineer-in-Charge. ( the work shall be carried out as per manufactures specification through the Applicator approved by the manufacturer)

72

-

-

... More
Tightening of bolts and nuts for the entire roof top 9x9 meters poles and gantry including checking and correcting verticality of tower, fixing of necessary missing bolts with torque resistant bolts and nuts with plain and spring washers check nuts etc ., all complete all as per direction of Engineer -In Charge. (Rate includes the cost of making the tower to vertical, tightening of existing bolts and nuts with plain washers and spring washers and check nuts, necessary scaffolding arrangement, helmets, ropes, pullies and other safety arrangements and all other incidental charges, complete all as per directions of Engineer-in-Charge. Payment for missing bolts and nuts shall be made separately under relevant item.) Note:- BSNL shall not be responsible for any mishaps, damages etc., if any, occurring during the execution of the work. The rate includes the cost for taking necessary insurance for workmen compensation and for comprehensive risk coverage. Nothing extra shall be paid on any account. 1 No. of 9m height pole including their struts shall be considered as one Job

9

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.