Bharat Sanchar Nigam Limited Tender
... More
For getting the details of etenders, if you are looking for information about them from the cumbersome government websites but are tired of doing so, Bidassist comes up with a one stop solution. It collates every Eproc telangana tender on Bidassist. One can approach it for the bidding process, registration process, etc., are explained below.
Bharat Sanchar Nigam Limited - BSNL Tender
Civil And Construction
Construction Material
Eprocure
Opening Date28 Jan 2025
Closing Date5 Feb 2025
Tender Amount₹ 67,900
Costs
EMD
₹ 1,400Document Cost
₹ 177Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_BSNL_225069_1Bid Award Id
ViewTender No
NIT No. 05 /NIT/CECTSCZ/HYD/2025Tender Authority
Bharat Sanchar Nigam Limited ViewPurchaser Address
-Website
http://https://www.bsnl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
4) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
1
-
-
... More
5) Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources).
1
-
-
... More
6) Centering and shuttering including strutting, propping etc. and removal of form for : Small lintels not exceeding 1.5 m clear span, moulding as in cornices, window sills, string courses, bands, copings, bed plates, anchor blocks and the like
2
-
-
... More
7) 6 mm cement plaster of mix : 1:3 (1 cement: 3 fine sand)
2
-
-
... More
8) Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm).
2
-
-
... More
9) Supplying and fixing in position 2.00 mm thick antistatic polyvinyl chloride sheet of approved colour, brand and manufacture, using DUNLOP or approved equavalent rubber based adhesive (viz: 8753 or equivalent) including fixing of 25mm wide x 0.60 mm thick copper strip in required pattern. The rate includes cost of all materials, wastage, taxes, transport, albour charges etc. The finished laid anti static pvc flooring shall be measured for payment. All complete as per manufacturers specifications and as directed by the Engineer-in-charge.
12
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements